Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 CrAccepted-AOC | ₹9.0 Cr | L1 | Accepted-AOC Agreement done on 05.07.21 as per letter from division |
| 2 | L2₹9.0 CrRejected-Finance 333 A 60 FEET ROAD BHAGWATI SADHNA NAGAR INDORE MADHYA PRADESH 452009 | INDORE | INDORE | MADHYA PRADESH | 452009 | ₹9.0 Cr | L2 | Rejected-Finance Being L2 |
| 3 | L3₹9.2 CrRejected-Finance | ₹9.2 Cr | L3 | Rejected-Finance Being L3 |
| 4 | L4₹9.6 CrRejected-Finance | ₹9.6 Cr | L4 | Rejected-Finance being l4 |
| 5 | Not Admitted-PreQual/Technical NEAR GIRATKAR ATTA CHAKKI SHRIVASTAVA COLONY DISTT CHHINDWARA M P PIN CODE NO 480001 | CHHINDWARA | CHHINDWARA | MADHYA PRADESH | 480001 | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹10.8 Cr
EMD Value
₹10 L
Closing Date
17 Jun 2020, 5:30 pmClosed
EE Pench Diversion Dam Water Resources Division 1
EE Pench Diversion Dam Water Resources Division 1 Chourai
Construction of Upstream and Downstream RCC Parapet wall with dram alongwith the earthen dam top, 6 nos. RCC stair case top to bottom of earthen dam, Bitumen road on top of earthen dam, emulsion paining of parapet wall, power pack room, inner and out
2020_WRD_82557_1
723/2019-20/E-in-C/et/ Dt. 03-03-2020
Open Tender
Civil Works - Others
365 days
Chaurai
As per tender document
19 documents required · 19 mandatory
₹30,000
Yes
Payable online only
₹10 L
Yes
2 Aug 2021
16 Mar 2020
19 Jun 2020
16 Mar 2020
17 Jun 2020
17 Mar 2020
Amount
Construction of U/S and D/S RCC Parapet wall with drain (D/S) along the earthen dam top, 6 nos RCC stair case top to bottom of earthen dam, Bitumen road on top of Earthen dam (from RD 0m to 6330m),Emulsion Painting of parapet wall, Power pack room, inner & outer side of control room, Inspection and adit gallery including fixing of stainless steel railing in stair case of inspection and adit gallery of Pench Dam. as per Scope of work but not limited to it for Pench Diversion Project Distt.-Chhindwara on Turnkey Basis
Construction of U/S and D/S RCC Parapet wall with drain (D/S) along the earthen dam top, 6 nos RCC stair case top to bottom of earthen dam, Bitumen road on top of Earthen dam (from RD 0m to 6330m),Emulsion Painting of parapet wall, Power pack room, inner & outer side of control room, Inspection and adit gallery including fixing of stainless steel railing in stair case of inspection and adit gallery of Pench Dam. as per Scope of work but not limited to it for Pench Diversion Project Distt.-Chhindwara on Turnkey Basis
SUSHIL DUTT PANDEY
NITYANTA INFRAPROJECTS PRIVATE LIMITED
SIDDHARTH ASSOCIATES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid