Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | ₹4.5 L Quoted ₹3.9 L | L1 | Accepted-AOC ACCEPTED AND AWARDED BY COMPETENT AUTHORITY |
| 2 | L2₹4.5 LRejected-Finance | ₹4.5 L | L2 | Rejected-Finance SINCE THE BIDDER IS NOT L1 |
| 3 | L3₹5.3 LRejected-Finance 27 B 34 VUDA ROW VILLA REVENUE WARD 6 SAGAR NAGAR RUSHIKONDA APIIC VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530045 UDYAM AP 10 0000633 37AAFCG8137J1Z9 R M MSME STATUS AS NOT VERIFIED | VISAKHAPATANAM | ANDHRA PRADESH | 530045 | ₹5.3 L | L3 | Rejected-Finance SINCE THE BIDDER IS NOT L1 |
| Sl No | Description | Qty | Unit | Geo Climate Risk Solutions Pvt Ltd L3 | SPACE GEO TECH L2 | Nirad Chandra Nayak L1 |
|---|---|---|---|---|---|---|
| 1.01 | Carrying out Hydrogeological fieldwork in the mine and its Buffer zone {Establishment of monitoring wells, collection of water level data (from 30 numbers well), water sample collection (20 nos of well) for Quality analysis and mapping}. Monitoring of water sample during Pre-monsoon (May) & Post-Monsoon(Late October/Early November) | 2 | Nos | 40,000 ₹80,000 | 36,000 ₹72,000 | 30,000 ₹60,000 Lowest |
| 1.02 | Basic Chemical Analysis (Na, K, Ca, Mg, HCO3, CO3, Cl, SO4, NO3, F) of 20 nos of collected well water sample as per the direction of the EIC | 20 | Nos | 3,500 ₹70,000 | 3,600 ₹72,000 | 3,000 ₹60,000 Lowest |
| 1.03 | Analysis of heavy metals (Fe, As, and other potentially present heavy metals) in 20 collected well water samples, as per the direction of the EIC | 20 | Nos | 600 ₹12,000 | 450 ₹9,000 Lowest | 750 ₹15,000 |
| 1.04 | Collection and compilation data on population, rainfall, landuse, groundwater monitoring data and other relevant data from different sources like Census/Collectorate/ CGWB / GWD etc as per the direction of the EIC | 1 | Nos | 45,000 ₹45,000 | 36,000 ₹36,000 | 10,000 ₹10,000 Lowest |
| 1.05 | Carrying out and attending Constant Discharge Pumping Test and Data analysis for the determination of aquifer parameters (Transmissivity and Storativity). (The pumping rate and time duration of test can be changed based on hydrogeological condition as per the direction of EIC.) | 1 | Nos | 75,000 ₹75,000 | 63,000 ₹63,000 | 50,000 ₹50,000 Lowest |
| 1.06 | Preparation of Comprehensive Hydrogeological Report | 1 | Nos | 80,000 ₹80,000 | 63,000 ₹63,000 | 40,000 ₹40,000 Lowest |
| 1.07 | Preparation of Mathematical Modelling report of the aquifer underlying the mine and its buffer zone with chapters on model conceptualization input of relevant data into the model, proper model grid & boundary generation, model run, model calibration and prediction | 1 | Nos | 1,70,000 ₹1,70,000 | 1,35,000 ₹1,35,000 Lowest | 1,50,000 ₹1,50,000 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹7.6 L
EMD Value
₹9,600
Closing Date
23 Apr 2026, 5:00 pmClosed
STAFF OFFICER (CIVIL), LINGARAJ AREA
SO (CIVIL), OFFICE OF THE GM, LINGARAJ AREA TALCHER, ANGUL_759102, ODISHA, INDIA
Preparation of comprehensive hydrogeological report along with modeling of core and buffer zone of Lingaraj Opencast Project (an opencast coal mine) in the radius of 2 sq. km. and 10 sq. km. respectively in accordance with the prescribed format and f
2026_MCL_358309_1
MCL/GM(LA)/e-Tender/ SO(C)/26-27/002 dt.13.04.2026
Open Tender
Civil Works - Others
Item Rate
180 days
Lingaraj OCP
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,600
1 Jul 2026
13 Apr 2026
24 Apr 2026
13 Apr 2026
23 Apr 2026
13 Apr 2026
13 Apr 2026 - 16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Carrying out Hydrogeological fieldwork in the mine and its Buffer zone {Establishment of monitoring wells, collection of water level data (from 30 numbers well), water sample collection (20 nos of well) for Quality analysis and mapping}. Monitoring of water sample during Pre-monsoon (May) & Post-Monsoon(Late October/Early November) | 2 | Nos | - | - |
| 1.02 | Basic Chemical Analysis (Na, K, Ca, Mg, HCO3, CO3, Cl, SO4, NO3, F) of 20 nos of collected well water sample as per the direction of the EIC | 20 | Nos | - | - |
| 1.03 | Analysis of heavy metals (Fe, As, and other potentially present heavy metals) in 20 collected well water samples, as per the direction of the EIC | 20 | Nos | - | - |
| 1.04 | Collection and compilation data on population, rainfall, landuse, groundwater monitoring data and other relevant data from different sources like Census/Collectorate/ CGWB / GWD etc as per the direction of the EIC | 1 | Nos | - | - |
| 1.05 | Carrying out and attending Constant Discharge Pumping Test and Data analysis for the determination of aquifer parameters (Transmissivity and Storativity). (The pumping rate and time duration of test can be changed based on hydrogeological condition as per the direction of EIC.) | 1 | Nos | - | - |
| 1.06 | Preparation of Comprehensive Hydrogeological Report | 1 | Nos | - | - |
| 1.07 | Preparation of Mathematical Modelling report of the aquifer underlying the mine and its buffer zone with chapters on model conceptualization input of relevant data into the model, proper model grid & boundary generation, model run, model calibration and prediction | 1 | Nos | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.49 MB
Tendernotice_2.pdf
PDF • 1.34 MB
BOQ_371186.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].