| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.3 LAccepted-AOC | ₹30.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.9 L+₹65,792.42 (2.17%)Rejected-AOC GRAM KANETHU BUJURG PO BARGADWA BASTI UTTAR PRADESH 272194 | BASTI | UTTAR PRADESH | 272194 | ₹30.9 L+₹65,792.42 (2.17%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical 10 RASULPUR LAMAHI VARANASI UTTAR PRADESH 221007 | VARANASI | UTTAR PRADESH | 221007 | - | - | Rejected-Technical as per uploaded |
| 4 | Rejected-Technical | - | - | Rejected-Technical as per uploaded |
| Sl No | Description | Qty | Unit | Pratap Narayan Mishra L2 | M/S A R T CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Dismentaling old Reinforced cement concrete work including stacking of dismentaled material with in a distance of 60 M. including all labour, T&P etc. As per direction of Engineer-in-charge. | 19.34 | M3 | 697.5 ₹13,489.65 | 682.5 ₹13,199.55 Lowest |
| 2.00 | Dismantling old existing brick work in 1:4 cement mortar including all cost of materials,T&P and labours etc. As per direction of Engineer-in-charge. | 66.41 | M3 | 530 ₹35,197.3 | 519 ₹34,466.79 Lowest |
| 3.00 | 1st class brick work in 1:4 cement mortar including cost of all materials, labours and T&P etc. complete for proper completion of work. As per direction of Engineer-in-charge. | 109.53 | M3 | 6,803 ₹7,45,132.59 | 6,657 ₹7,29,141.21 Lowest |
| 4.00 | Centering and shuttering for R.C.C. work including cost of all materials, labours and T&P etc.complete for proper completion of work. As per direction of Engineer-in-charge. | 303.33 | M2 | 837 ₹2,53,887.21 | 819 ₹2,48,427.27 Lowest |
| 5.00 | Reinforced Cement Concrete M-20 1:1.5:3 with coarse Sand ( FM>2.0) and stone grit (12.5mm -20mm) in coloum,plinth beam, lintel beam & slab including cost of all material, labour, T&P, etc complete for proper completion of work. As per direction of Engineer-in-charge. | 51.47 | M3 | 11,119 ₹5,72,294.93 | 10,879 ₹5,59,942.13 Lowest |
| 6.00 | Reinforcement with cutting, bending and binding and placing in proper position including cost of Binding wire with cost of all materials, labour, T&P etc.complete for proper completion of work. As per direction of Engineer-in-charge. | 6.06 | MT | 73,576 ₹4,45,870.56 | 71,994 ₹4,36,283.64 Lowest |
| 7.00 | Dismantling of old existing plaster including disposal of refuse within distance of 60 meter including all labour, T&P etc. As per direction of Engineer-in-charge. | 1,339.32 | M2 | 26 ₹34,822.32 | 25.5 ₹34,152.66 Lowest |
| 8.00 | 12 mm thick plaster (1:4 C:M) with coarse sand (F.M > 2.0) including cost of all materials labour and tools and plants etc. required for proper completion of work. As per direction of Engineer-in-charge. | 2,294.36 | M2 | 258.5 ₹5,93,092.06 | 253.9 ₹5,82,538 Lowest |
| 9.00 | Relaying of old dismentaling brick edge on soling. As per direction of Engineer-in-charge. | 158.01 | M2 | 65 ₹10,270.65 | 63.5 ₹10,033.64 Lowest |
| 10.00 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.. (External work) 40 mm dia | 120 | RM | 399 ₹47,880 | 390 ₹46,800 Lowest |
Tender Value
₹33.9 L
EMD Value
₹68,000
Closing Date
15 Jul 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Office, Drainage Division Gorakhpur
Repair of Staff quarters, boundary wall and sub divisional office of Hobert Colony, Drainage Division Gorakhpur
2026_UPIDC_1168170_1
03/EE/2026-27
Open Tender
Civil Works - Buildings
Item Wise
30 days
Hobert Colony Drainage Division Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹68,000
Drainage Division Gorakhpur
31 Aug 2026
10 Jul 2026
15 Jul 2026
10 Jul 2026
15 Jul 2026
10 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling old Reinforced cement concrete work including stacking of dismentaled material with in a distance of 60 M. including all labour, T&P etc. As per direction of Engineer-in-charge. | 19.34 | M3 | - | - |
| 2 | Dismantling old existing brick work in 1:4 cement mortar including all cost of materials,T&P and labours etc. As per direction of Engineer-in-charge. | 66.41 | M3 | - | - |
| 3 | 1st class brick work in 1:4 cement mortar including cost of all materials, labours and T&P etc. complete for proper completion of work. As per direction of Engineer-in-charge. | 109.53 | M3 | - | - |
| 4 | Centering and shuttering for R.C.C. work including cost of all materials, labours and T&P etc.complete for proper completion of work. As per direction of Engineer-in-charge. | 303.33 | M2 | - | - |
| 5 | Reinforced Cement Concrete M-20 1:1.5:3 with coarse Sand ( FM>2.0) and stone grit (12.5mm -20mm) in coloum,plinth beam, lintel beam & slab including cost of all material, labour, T&P, etc complete for proper completion of work. As per direction of Engineer-in-charge. | 51.47 | M3 | - | - |
| 6 | Reinforcement with cutting, bending and binding and placing in proper position including cost of Binding wire with cost of all materials, labour, T&P etc.complete for proper completion of work. As per direction of Engineer-in-charge. | 6.06 | MT | - | - |
| 7 | Dismantling of old existing plaster including disposal of refuse within distance of 60 meter including all labour, T&P etc. As per direction of Engineer-in-charge. | 1,339.32 | M2 | - | - |
| 8 | 12 mm thick plaster (1:4 C:M) with coarse sand (F.M > 2.0) including cost of all materials labour and tools and plants etc. required for proper completion of work. As per direction of Engineer-in-charge. | 2,294.36 | M2 | - | - |
| 9 | Relaying of old dismentaling brick edge on soling. As per direction of Engineer-in-charge. | 158.01 | M2 | - | - |
| 10 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.. (External work) 40 mm dia | 120 | RM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BID_01.pdf
Tender Documents • 1.14 MB
BOQ_2191112.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .