Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹17.5 L
Closing Date
4 Jun 2025, 3:00 pmClosed
PR & CC
ARCHITECTURAL AND ENGINEERING SERVICES AT HP NAGAR EAST HOUSING COMPLEX,
2500020700-HD-09050
5100020700
Open Tender
Jalandhar, Punjab
₹0
₹17.5 L
4 Jun 2025
14 May 2025
4 Jun 2025
4 Jun 2025
19 May 2025 - 23 May 2025
21 May 2025
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Architectural&Eng Fees-Optn A | Architectural&Eng Fees-Optn A — Fees for Architectural <(>&<)> Engineering consultancy Services for Construction of 207 flats of carpet area (RERA) 1050 Sqft (+/-5%)-69 flats, 1250 sqft (+/- 5%)-69 Flats ,1450sqft (+/-5%)-69 Flats, 4 podium parking,18 nos Residential floors and allied amenities involved all as per scope and specifications details provided in the tender document. (Est Project Cost-Capped at Rs 313 Cr) | - | Lump Sum |
| 2 | Addl Arch & Eng Fees-Optn B | Addl Arch & Eng Fees-Optn B — Additional Fees over and above item No 10 for addition of 4nos similar floors over and above 18 floors. (Est Additional project Cost capped at-57 Cr). | - | Lump Sum |
| 3 | Isometric Architectural Drawings | Isometric Architectural Drawings — Submission of 3D Architectural drawings/rendered images for building and each flat configurations along with walkthrough. | - | each |
| 4 | Structural Design & Vetting | Structural Design & Vetting — Structural design and Vetting from Reputed Engineering Institute like IIT/NIT including fees to be paid to IIT/NIT for vetting. - for 4 podium and 22 residential floors for all 3 towers and amenities involved. | - | each |
| 5 | Obtaining Statutory Apprvl upto | Obtaining Statutory Apprvl upto — The scope includes obtaining of all the statutory approvals starting from Layout Approval, Receipt of IOD (Intimation of Dis-Approval), Compliances to all IOD conditions/ recommendations, receipt of Demand Note for Development charges/ other fees for issuance of Commencement Certificate and obtaining Building Commencement Certificate after submission of demand charges/other fees by HPCL, including all liasioning fee,not limited to list of essential approvals as mentioned below. i. Obtaining Layout Approval from MCGM Including all liasioning fee. ii. Obtaining Fire NOC Including all liasioning fee. iii.Obtaining IOD from MCGM Including all liasioning fee. iv. Obtaining Tree NOC including tree cutting permission. Including all liasioning fee. v. Obtaining Environmental Clearance/Pollution Control Board Including all liasioning fee. vi. Complaince to all IOD Conditions and obtaining Commencement Certificate including all liasioning fee. vii. Any other approvals required for commencement of Construction. Obtaining statutory approvalsr required for commencmeent of construction is of the highest priority and carries utmost importance. Architect needs to obtain the all the required approvals as per timelines mentioned in 'Part F- Timelines', 'Payment Terms' and as per the detailed scope of works defined under "Part D-Scope of Works, Section II, Part A -Statutory Approvals" | - | Lump Sum |
| 6 | Obtaining Statutory Apprvl upto | Obtaining Statutory Apprvl upto — Obtaining all Statutory approvals/NOCs required during and after completion of construction including 'occupancy certificate' etc for the entire project comprising of 4 podiums and 18 residential floors for all the 3 towers and amenities involved. This includes all the statutory approval from floor wise commencement Certificates including cordinating with statutory authorities for inspections/visits, obtaining final Fire NOC,PCB,EC Completion Certificates and Occupancy Certificates including all liasoning fee but not limited to list of essential approvals as mentioned below. i. Obtainin,g final Fire NOC,Including all liasioning fee ii. Obtaining Completion Certificate and Occupancy Certificate from MCGM, Including all liasioning fee. iii. Obtaining all final NOC's/ Consent to Operate etc from Pollution Control Board/MOEF,Including all liasioning fee. iv Any other approvals required for occupancy of the buildings,Including all liasioning fee. Architect requires to obtain all the approvals as per timelines mentioned in 'Part F- Timelines' and 'Payment Terms' and as per the detailed scope of works defined under "Part D-Scope of Works, Section II, Part B-Statutory Approvals” | - | Lump Sum |
| 7 | Addl Fees Statutory Apprvl-Upto | Addl Fees Statutory Apprvl-Upto — Additional fees over and above item no.50 for addition of 4 Nos similar floors over and above 18 floors. | - | Lump Sum |
| 8 | Addl Fees Statutory Apprvl-Upto | Addl Fees Statutory Apprvl-Upto — Additional fees over and above item no. 60 for addition of 4 Nos similar floors over and above 18 floors. | - | Lump Sum |
| 9 | Fees for the Visit of Architect | Fees for the Visit of Architect — Fees for the visit of Senior Architect / Structural Consultant / MEP consultant / any other specialized consultant to site / HQO in Mumbai over and above the minimum 2 visits / month ( 2visits per month included in scope of works) | - | each |
| 10 | Providing Diploma/Degree Engg | Providing Diploma/Degree Engg — Fees for providing Diploma / Degree Engineer (discipline relevant to the job) at site having atleast 3 years site experience in relevant field to carry out all checks continuously during entire construction period. | - | Man Month |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2500020700-HD-09050.pdf
TENDER_DOCUMENT • 25.20 MB
Download all tender documents and submit your bid