Hubli Electricity Supply Company Limited
NAGAPPA C BELAKERI
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Hanamapur to the existing 33/11 KV MUSS Muragundi for a distance of 8.2 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on total turnkey basis.
HESCOM/2026-27/EL/WORK_INDENT1218/CALL-2
HESCOM/2026-27/EL/WORK_INDENT1218/CALL-2
Open
Electrical
Two Tender Document System(Two Cover)
HESCOM Superintending Engineer (PMC)Corporate Office Hubli
19 documents required · 19 mandatory
The bidder should have Constructed 33kV/above class lines or Recondutoring of 33KV or above class lines for a minimum distance of 80% of tendered quantity on Total Turnkey or Partial turnkey or Labour Contract basis in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25).Such works shall be in successful operation for a period of at least 1(One) year as on date of submission of bid.As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note: Please note that the date of issuance of the work completion or performance certificates must be at least one year after the actual date of work completion
The Bidder should have achieved in at least Two financial year, a minimum financial turnover of not less than Two Times the amount put to tender in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25).The bidder shall upload the downloaded Form GSTR-9/9C, 3CA/3CB & 3CD from the portal along with Copies of Annual turnover certificate and audited balance sheet of profit and loss account duly mentioning the UDIN No duly certified by Chartered Accountant as applicable.Documents without UDIN No, GSTR-9/9C, 3CA/3CB & 3CD downloaded from portal are liable for rejection.Note: Updated to the FY in which the tenders are invited. Financial turnover of previous years shall be given a weight of 10% (say) per year to bring them to the price level of the FY in which the tenders are invited.
The cash at bank, term deposits and availability of fund based credit facilities shall not be less than 30% of the amount put to tender (Rs. 41.66Lakhs)shall be supported by a certificate issued by Nationalized/ scheduled Bank as per the Annexure format attached shall be uploaded.If the Tenderer has banking with more than one Bank, then the available liquid assets mentioned above on a particular date i.e., as on date of bid submission or at a later date before the last date for bid submission of tender shall be the same date for all the banks.The said Credit Facility Certificate should possess the name of the Firm and tender Indent number and the credit facility to be issued in the name of Superintending Engineer (Ele),PMC, Corporate Office,HESCOM, Navanagar, Hubli. The credit facility certificate should be in the Format Annexed to this bid.ANNEXURE.The conditional credit certificates are liable for rejection.
The bidder should have Satisfactorily completed (at least 90% of the contract value), as prime a contractor, at least one contract involving 33KV and above class, substations /Construction of lines/Reconductoring of lines of value not less than 50% of the Amount put to Tender in any State/Central Govt./ Distribution Companies/PSUs in the last five financial years (i.e., ,2020-21 2021-22, 2022-23, 2023-24 & 2024-25) As a proof of documentary evidence Award copies and work completion certificates duly mentioning date of work completion and Executed cost issued by the competent authority not below the rank of Executive Engineer (Ele) of any State/Central Govt. Distribution Companies / PSUs shall be uploaded. The Experience certificate shall be submitted as per Annexure-IV.Note- Updated to the FY in which the tenders are invited. The value of the completed works shall be given a weight of 10% per year to bring them to the price level of the FY in which the tenders are invited.Note: Please note that, Award cost and Executed cost must be mentioned in the work completion/Performance certificates
The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids. The bidder should possess valid Class-I / Super grade Electrical Contractor license issued by the Electrical Inspectorate, Govt. of Karnataka. The validity of the license should be in force at the time of submission of Bids.(Note: Firm name in the license as well as all the statutory documents should be same otherwise bid is liable for rejection).Scanned original copy of the Class-1 / Super grade Electrical Contractors License issued by Electrical Inspectorate, Government of Karnataka is to be uploaded by the bidder.
The bidder shall be a sole proprietorship firm or a partnership firm or a company incorporated under companies Act 1956/2013. Copy of the Certificate of Incorporation in case of Registered Company/ Partnership deed in case of Partnership Firm/GST or PAN registration in case proprietor ship firm is to be uploaded.
The bidder should upload original scanned copy of ESI issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of EPF Reg. No issued by the respective competent authorities of the concerned department
The bidder should upload original scanned copy of Pan No issued by the respective competent authorities of the concerned department.
The bidder should upload original scanned copy of GST No. issued by the respective competent authorities of the concerned department.
The bidder should possess valid original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka. The bidder should upload original scanned copy of Registration Certificate of Establishment FORM C (Labour Reg.) issued by Department of Labour, Government of Karnataka
The bidder should not have been Black-Listed by ESCOMs/ KPTCL/ any other Government Distribution/ Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-I).
The bidder should not have been defaulted & Terminated due to non-performance in execution of works against the order placed by ESCOMs/KPTCL/any other Government Distribution/Transmission utilities including PSUs as on date of bid submission. Self-declaration for the same shall be uploaded (Annexure-II)
The bidder should provide detailed information on any litigation or arbitration arising out of contracts completed or under execution by it over the last five years with /KPTCL/ESCOMS. A history of awards involving litigations against the bidder or any part may result in rejection of bid. Self-declaration for the same shall be uploaded (Annexure-III)
Tender Capacity: The bidder should upload available tender capacity calculated in the prescribed format through e-procurement portal within due date of submission of bids. The available tender capacity shall be more than the total tender value.
Pre Survey: The bidder at his own responsibility must visit and examine the site of works & its surroundings and obtain all information that may be necessary for participating in the tender. The cost of the visiting/survey of the proposed works shall be at the bidders own expenses.The site inspection survey certificate of the proposed works issued by the concerned Executive Engineer (Ele).33KV S&L Division, HESCOM should be obtained by the bidder and shall be uploaded
The bidder from Nations sharing Border with India should upload the certificate issued by GOI.OR Self-declaration for not from Nations sharing Border with India.Registration certificate issued by the competent authority shall be uploaded. OR If not Self-declaration in the prescribed format as per Annexure-VII shall be uploaded.The self-declaration shall clearly indicate the tender enquiry number & date on which declaration is done.
₹3,480
₹2.1 L
25 Jun 2026
18 Jun 2026
29 Jun 2026
22 Jun 2026
22 Jun 2026
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Self-Declaration statement of Bidder/Contractor for works Done…as on date of Bid submission.
Note: Please fill all required data and upload the signed copy in e-procurrement portal.
Bid Indent No: HESCOM/2026-27/EL/WORK_INDENT1218/CALL-2 Format-I
Work done certificate details as per QR.
Sl.No. Year of Completion Name of the Department Work Done Certificate No.& Date. Work Done Certificate issued by (Executive Engineer, Superintending Engineer .,.etc.,) Station voltage Class (220kV, 110kV, 66kV, 33kV) Station Capacity (MVA) 33 KV Line in R.Kms 33KV ROC in R.Kms 11 KV & above in R.Kms Others Cost of the work/project Executed cost Rs.in Lakhs
Note:Works completed during the period from (i.e., 2020-21,2021-22,2022-23 2023-24 and 2024-25) shall only be furnished, others will not be accepted.
I/We hereby declare that I/We had carried out above works and completed in all respects and are in successful operation for the last 1 (One) year i.e.,as on date of Bid submission. Further notice for defects in executed works is not received from concerned Department/recieved and same have been attended within the time. Any information, if found to be incorrect, wrong, misleading or misrepresenting , I/We am/are aware that I/We may be held liable for it.
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Hanamapur to the existing 33/11 KV MUSS Muragundi for a distance of 8.2 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on total turnkey basis.
Sl. No Particulars Material Labour Civil Total
1 Materials cost (Exclusive of GST) 9136568.95 9136568.95
2 Labour charges+ Decommissioning (Exclusive of GST) 2409474.98 2409474.98
3 Civil Engineering Charges (Exclusive of GST) 26290.00 26290.00 2.806226956
5 Area Specific Loading @ 5% on labour charges 0 0 0.00 0.00
Contractors Profit @ 10% on Sl No. Sl No. 4 & 5 913656.89 240947.50 2629.00 1157233.39
% age of tender compenents included 236.00
Executive Engineer (EL), Superintending Enginner (El),
Projects - 1 , HESCOM, Hubli PMC, HESCOM, Hubli
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Hanamapur to the existing 33/11 KV MUSS Muragundi for a distance of 8.2 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on total turnkey basis.
PART A 33KV line
Sl. No Particulars Unit Qty Material Cost Labour rate 39
Unit rate as per SR 25-26 Amount Unit rate as per SR 25-26 Amount 15 Remarks
1 Supply and errection of 9.5 Mtr long, 350 kg WL RCC Three pole structure of including transportation to the work site, with all lead and lift from the factory and head load from the nearest road, digging pit to a depth or 2.0M. giving a coating of coal for aligning if required, refilling the soil, ramming etc; complete including providing pole base concreting with CC 1:4:8 for pole base and concreting the pole and copping with CC 1:2:4 using all materials such as cement, sand jelly, etc; complete including consolidating, curing etc; complete for each pole . Set 2 42323.00 84646.00 16448.00 32896.00 #REF! #REF!
Supply of 9.5 Mtr long, 350 kg WL RCC for 3 pole structure (As per KPTCL SR- 2025-26, Page No- 3 of 50, SL.No-08) (Rs.10015 X 3 = 30045) #REF! #REF!
Three pole structure for 33kV. (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-13) (Rs. 6139*2=12278) 30045 6833.057851 #REF! #REF! 42323
Concreting materials for 9.5 Mtr long, 350 kg WL RCC (HESCOM CSR 23-24, 11 KV Labour Page No:8, Sl.No:26 A(a), B(a), C(a), (Rs. 312+3746+312 =4370x3 Nos= 13110.00) 12070 #REF! #REF! 50787.6
Erection of three pole structure using 9.5 Mtr long, 350 kg WL RCC pole (HESCOM CSR 25-26 Page No 35 of 50, Sl No: 34 , Rs:3682*2=7364 in this amount less the errection chargers of 1No's 9.5mtr RCC pole Rs:1590, Total amount: 7364-5523) 42115 #REF! #REF! 12278 4987.603306
2 Supply and errection of 9.5 Mtr long, 350 kg WL RCC Double Pole Structure of including transportation to the work site, with all lead and lift from the factory and head load from the nearest road, digging pit to a depth or 2.0M. giving a coating of coal for aligning if required, refilling the soil, ramming etc; complete including providing pole base concreting with CC 1:4:8 for pole base and concreting the pole and copping with CC 1:2:4 using all materials such as cement, sand jelly, etc; complete including consolidating, curing etc; complete for each pole . Set 22 26169.00 575718.00 13544.00 297968.00 2806 #REF! #REF!
Supply of 9.5 Mtr long, 350 kg WL RCC for two pole structure as per HESCOM CSR 25-26 11 KV system, Page No: 3, Sl No.: 08, Item.No.: 1.08 (Rs.10015 X 2 = 20030) 20030 #REF! #REF!
Double pole structure for 33kV (HESCOM CSR 25-26, 33 KV system, Page No: 69, Sl No.: 13, Item No.: 6.07 (Rs. 6139*1=6139) 2065 #REF! #REF!
Concreting materials for 9.5 Mtr long, 350 kg WL RCC (HESCOM CSR 23-24, 11 KV Labour Page No:8, Sl.No:26 A(a), B(a), C(a), (Rs. 312+3746+312 =4370*2=8740) 8502 #REF! #REF!
Erection of double pole structure using 9.5 Mtr long, 350 kg WL RCC pole (HESCOM CSR 25-26 Page No 35 of 50, Sl No: 34 Rs:4804) 3472 #REF! #REF!
3 Supply and errection of 9.5 Mtr long, 350 kg WL RCC Single pole of including transportation to the work site, with all lead and lift from the factory and head load from the nearest road, digging pit to a depth or 2.0M. giving a coating of coal for aligning if required, refilling the soil, ramming etc; complete including providing pole base concreting with CC 1:4:8 for pole base and concreting the pole and copping with CC 1:2:4 using all materials such as cement, sand jelly, etc; complete including consolidating, curing etc; complete for each pole . Nos. 192 10015.00 1922880.00 6403.00 1229376.00 #REF! #REF!
Supply of 9.5 Mtr long, 350 kg WL RCC for single pole (As per KPTCL SR- 2025-26, Page No- 2 of 50, SL.No-08) 3472 #REF! #REF!
Concreting materials for 9.5 Mtr long, 350 kg WL RCC (HESCOM CSR 23-24, 11 KV Labour Page No:8, Sl.No:26 A(a), B(a), C(a), (Rs. 312+3746+312 =4370) 4875 #REF! #REF!
Erection of 9.5 Mtr long, 350 kg WL RCC pole (HESCOM CSR 25-26 Page No 34 of 50, Sl No: 13, 35 of 50 Sl No.31, Rs:617+1416=2033) 571.9008264 2033 #REF! #REF!
4 Erection of 9.5 Mtr long, 350 kg WL RCC pole for stud (HESCOM CSR 25-26 Page No 34 of 50, Sl No: 13, 35 of 50 Sl No.31, Rs.7509 and (HESCOM CSR 25-26 Page No 34 of 50, Sl No: 13, 35 of 50 Sl No.31 Rs:617+1416=2033) Nos. 120 10015.00 1201800.00 1977 237200.00 #REF! #REF!
5 LT 2 Pin Cross Arm - MS(Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) (As per KPTCL SR- 2025-26, Page No- 91 Nos. 240 290.00 69600.00 143.00 34320.00 #REF! #REF!
6 "Coyote" ACSR Conductor (As perESCOMs SR- 2025-26, Page No- 2 of 50, SL.No-24) Km 25 135537.00 3384223.35 6667 166460.00 162644.4 #REF! #REF! #REF!
7 Supply and fixing of Horizantal cross arms for 33 KV using pole clamps, bolts and nuts etc., for 9.5 Mtr long, 350 kg WL RCC (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-15 & 16 And 36 of 50 Sl No: 50) 2045+99= Set 192 2144.00 411648.00 228.00 43776.00 2144 #REF! #REF! #REF!
8 Supply and fixing of top supports for 33 KV line with clamps, bolts and nuts etc; for I beams (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-16) Set 192 376.00 72192.00 0.00 0.00 #REF! #REF!
9 33 kV Polymer Pin Insulator (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-11) Nos. 648 756.00 489888.00 0.00 0.00 #REF! #REF!
10 33 kV 70 KN Polymer Insulator (Ball & socket type) (As per KPTCL SR- 2025-26, Page No- 82 of 84, SL.No-12) Nos. 150 390.00 58500.00 0.00 0.00 #REF! #REF!
11 Strain Clamp for Coyote to Coyote, (As per KPTCL SR- 2025-26, Page No- 3 of 50 SL.No-46) Nos. 150 578.00 86700.00 0.00 0.00 #REF! #REF!
12 33 KV Guy Set with (includes Anchor Rod, Turn buckle(GI), Guy wire, 2 nos. of No.15 Strain Insulator, Guy clamp with Bolts, Nuts and Washers) (As per KPTCL SR- 2025-26, Page No- 3 of 50 SL.No-41, 3 of 50 SL N. 42,39, 4 of 50 Sl No. 54 , 60 ) 205+197+71+49+505.3 Labour charges 292+237=529 Page No 34 of 50 & 36 fo 50 Sl No. 25& 58 resply) Set 50 1208 60400.00 530.00 26500.00 978.3 #REF! #REF!
13 Guy concreting with Boulders, Mud & Sand (300x300x450 mm) As per Drawing No. BESCOM/GM/CP/7 Dt: 24.10.07 Nos. 50 0.00 250.00 12500.00 #REF! #REF!
14 Spiral Earth electrode (As per KPTCL SR- 2023-24, Page No- 3 of 50 SL.No-26) Labour 35 of 50 Sl No. 36 Set 240 199.00 47760.00 83.0 19920.00 #REF! #REF!
15 a) Guarding for road crossing (As per KPTCL SR- 2023-24, Page No- 3 of 50 SL.No-30) (76*40Mtr) Labour 36 of 50 Sl No.61 Span 10 3120.00 31200.00 921.00 9210.00 #REF! #REF!
a) 3 pin cross arm for Guarding (As per KPTCL SR- 2023-24, Page No- 2 of 50 SL.No-13) (705 Span 20 705 14100.00 0.00 0.00 #REF! #REF!
16 Supplying and Providing of Pipe type Earthing consisting of Class "C" GI Pipe of 3mtr long, 40mm dia, 2.5mm thick, with Clamp, Bolt & Nuts, GI Wire / 50 x 6mm GI flat of 3mtrs long, Charcoal,salt, including earth excavation, re-filling as per KPTCL 23-24, page no: 115, Sl.No.: 6a, Rs. 5224+2111/- Set 48 4317 207233.06 1759 84440.00 Not updated #REF! #REF!
17 G I Bolt & Nuts of required various size HESCOM CSR 23-24, KPTCL, Page No.: 43, Sl.No.:18.3, Rs. 142780/MT MT 0.100 118000 11800.00 0 0.00 Not updated #REF! #REF!
18 Anticlimbing Device GI Barbed wire (12 Mtr/Kg) (As per KPTCL SR- 2025-26, Page No- 3 of 50 SL.No-29) labour No: 36 of 50 Sl N.57 Nos. 240 152 36480.00 143 34320.00 #REF! #REF!
19 Caution/Danger Board (As per KPTCL SR- 2023-24, No- 31 of 50, SL.No-687) labour No: 36 of 50 Sl N.57 Nos. 24 131.00 3144.00 71 1704.00 #REF! #REF!
20 Number plates with pole clamps Bolt & nuts KPTCL SR 23-24, page No-43, Sl.No: 19.2, Rs.318/- and labour Page. No/: 113, Sl. No.: 3, Item No.: b, Rs. 80/- Nos. 216 263 56766.94 71 15336.00 Not updated #REF! #REF!
21 Phase plates (set of 6 per tower) KPTCL SR 23-24, page No-43, Sl.No: 19.1 Rs:528 labour Page. No/: 113, Sl. No.: 3, Item No.:d, Rs. 238/- Set (3 Nos) 24 436 10472.73 198 4760.00 Not updated #REF! #REF!
22 PG Clamp for Coyote to Coyote, (As per KPTCL SR- 2025-26, No-3, SL.No-39) Nos. 150 333 49950.00 0 0.00 #REF! #REF!
23 Preliminary survey: Preliminary survey for identification of 3 alternative routes using Google Images and Survey of India maps and finalization of most economical, optimum route showing the topographical and other features on either side and indicating final selected route alignment and digital modeling in undulated hilly terrain along the proposed route using contour data from topographical map and submission of preliminary survey reports for approval as detailed in technical specification, inall types of terrain. (KPTCL SR 23-24, Page No.: 153, Sl. No.: 1,) Km 8.2 0.00 3025 24805.00 #REF! #REF!
24 Detailed Survey: Detailed survey along the approved route alignment by using Modern Survey equipment like DGPS/Total Stations/Digital Theodolites/GPS including profiling, tower spotting and optimization of locations by using computer aided techniques as detailed in the scope of work using PLS-CADD software in all types of terrains and includes the following: (KPTCL SR 23-24, Page No.: 153, Sl. No.: 2,) Km 8.2 0.00 12201 100046.83 #REF! #REF!
25 Check survey to be conducted during construction stage: Conducting detailed check survey along the approved route duly following the route alignment, GPS Co-ordinates, submission of detailed line schedule, tower schedule, land schedule and comparing the same with respect to detailed survey report, bringing out the differences if any. Submission of contour maps for undulated/hilly tower. The work also includes marking corridor width in the field and computing the quantum of benching and revetment, preparation of detailed land schedule along the corridor on the digitized Revenue village maps indicating the Sy. Nos. falling within the corridor for the purpose of estimation of the land compensation, submission of detailed consolidated hard copy of reports of check survey in 6 sets along with soft copy for approval in all types of terrain per km (KPTCL SR 23-24, Page No.: 155, Sl. No.: 3,) Kms 8.2 0.00 2218 18190.33 #REF! #REF!
Part-B 33KV Line breaker material estimate 0.00 #REF! #REF!
33 KV Isolators : 0.00 #REF! #REF!
33KV, 800A, 25 KA Class Double Break manually operated isolators with Pad connectors suitable for Coyote ACSR Conductor, as per technical specification with Solid Core, cylindrical post insulators 0.00 #REF! #REF!
a 33 kV, 800 A, 25 kA Upright with Earth Switch complete metallic portion with insulator (KPTCL SR-2023-24, Page No:37, Item No:9.14.1) RS:84700 Nos 1 70583 70583.33 0.00 #REF! #REF!
Erection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection (33 KV) (KPTCL CSR 23-24, Labour, Page No: 119, Sl No.: 18) Set 1 0.00 0.00 278.00 278.00 #REF! #REF!
Erection of Isolators (33 KV) Assembly, Errection alignment and wiring including movement from the point of unloading to the point of erection.(Upright type) ( KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 a(i)) Nos 1 0.00 0.00 1099.00 1099.00 #REF! #REF!
Assisting in Testing and Commissioning ( KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 E(i) , ) Nos 1 0.00 0.00 159.00 159.00 #REF! #REF!
Surge Arrestors, Metal Oxide, as per Technical Specification. 0.00 0.00 #REF! #REF!
a) 30 kV Metal Oxide with surge counter Arrestor class : Discharge Class 2 (Station Low Duty (SL)- for Overhead Line (KPTCL SR-2025-26, Page No:34, Item No:8.8, Rs:4840) . Nos 3 11583.00 34749.00 0.00 #REF! #REF!
Conductors 0.00 0.00 #REF! #REF!
a) "Coyote" ACSR Conductor (KPTCL 2025-26, Page No.:44, SL No.:20.6. Rs:139) Meter 200 135.53 27106.00 0.00 #REF! #REF!
Mounting Structures: 0.00 0.00 #REF! #REF!
Mounting Structures for equipments made out of fabricated galvanised angle of High tensile steel for GOS / CT's / PT's / LA's / NCT / HI PI etc as per approved drawing 0.00 0.00 #REF! #REF!
a) 33KV Isolators - 0.248 MT (KPTCL SR-2023-24, Page No:43, Sl.No:18, Item No:18.3, Rs:148830 for MT) . (0.248MT=36909.84) (As per KPTCL SR- 2025-26, No- 02, SL.No-16) Nos 1 25627 25626.67 0.00 #REF! #REF!
c) 33KV Lightning Arrestors - 0.075 MT (KPTCL SR-2023-24, Page No:43, Sl.No:18, Item No:18.3, Rs:148830 for MT) . (0.075MT=11162.25) (As per KPTCL SR- 2025-26, No- 02, SL.No-16) Nos 3 7750 23250.00 0.00 #REF! #REF!
33KV ODS Structures 0.00 0.00 #REF! #REF!
a) RCC Pole - 9 Mtr Long, 145 Kg WL (As per KPTCL SR- 2025-26, Page No- 2 of 50, SL.No-08) Nos 2 6276.00 12552.00 0.00 #REF! #REF!
b) 11KV ODS mounting structure using 50 x 100 x 50 x 6 mm C channel MS, each 4.0 mtr long , As per PWD Electrical Page 19 Sl.No-5.41.4 Rs-Per Mtr-756.00 3NosX4Mtr=12 Mtr Mtr 12 630.00 7560.00 0.00 #REF! #REF!
c) Erection, alignment & assembly of fabricated steel lattice structure, pedestal structures & Mounting structures, for G.O.S. LAs etc. ( KPTCL CSR 23-24, Labour, Page No: 116, Sl No.: 8 b) MT 0.473 0.00 4769 2255.82 #REF! #REF!
d Formation of cross bus in each individual bay using Lynx/Coyote - Single/Double conductor with fixing of insulators, spacers, levelling the string conductors to the required height above the equipment including providing jumps to inter-connect different segments of the main bus. ( KPTCL CSR 23-24, Labour, Page No: 122, Sl No.: 25) Per bay 1 0.00 6137 6136.67 #REF! #REF!
Insulators & Hardware materials: 0.00 0.00 #REF! #REF!
a) Pad clamp for Coyote ACSR (KPTCL SR-2025-26, Sl.No:77, Item No:10.09, Rs:725) Nos 6 734.00 4404.00 0.00 #REF! #REF!
b) T clamp for Coyotte ACSR (KPTCL SR-2025-26, Page No:69, Item No:47.7.11, Rs:509.00) Nos 6 426.00 2556.00 0.00 #REF! #REF!
e) I bolts Nos 6 55.00 330.00 0.00 #REF! #REF!
Ground Mat & Earthing : 0.00 0.00 #REF! #REF!
a) Grounding of equipment by providing cast iron pipe of 100mm ID 13mm thick, 2.75Mtr long wih 2part clamps out of GI flat 50/6 mm continously welded alround the pipe using cast iron welding electrodes as per drawing (al materials to be supplied by contractors) ( KPTCL CSR 23-24, Labour, Page No: 115, Sl No.: 6c, Rs:12792) , Set 2 10635 21270.00 2909.2 5818.33 #REF! #REF!
b) Supplying & providing 450mm dia 450mm hieght 1.5" - 2" thick hume pipe coller ( non PR type) fop earth quits including all lead & lift. ( KPTCL CSR 23-24, Labour, Page No: 124, Sl No.: 26i, Rs:1499) , each 2 1249 2498.33 0.00 0.00 #REF! #REF!
c) Grounding of equipment with 50/6 mm GI flat & connecting equipment to the earth mat / ground pit. Each point of earthinh with all formation works like bending, twisting, drilling of holes & conncting by welding (inclusive of all T & P consumables) to the earth mat/ ground pit/point of earth connection, all the materails supplied by the contractor ( KPTCL CSR 23-24, Labour, Page No: 123, Sl No.: 26f, Rs:335) , Rmt 45 279 12562.50 0.00 0.00 #REF! #REF!
a) Bolt & Nut as per IS-1367 GI (HESCOM SR-2023-24, Sl.No:494 to 504, item no:61.12 to 61.22, RS:132571 for MT) MT 0.040 110476 4419.03 0.00 #REF! #REF!
Grand Total Cost 9136568.95 2409474.98 #REF!
ÌÐÔ½ñÏü Á·ÐÔô³ý ÊФн¤Ñ¡Ô ‘Ðo»Ðº ºo¦ÐÔÁԳРHubli Electricity Supply Company Ltd
ÊÐÌÑo¦ÐÔ‘Ð ‘Ño¦ÐÔþºÀÑþÌБРƒ¿°o¦ÐÔo³Ð¤Ð¤ÐÔ(Á) Office of the
ŠÊý ÀÐÔ³ÐÔê ŠÄý ‡»Ð Á¾°Ñ–Ð, Asst.Executive Engineer (Ele)
ÌÐÔ.Á.ÊÐ.‘Ð.º. ƒµÐ±Ò. 33KV S&L Sub-Divn. Athani
No.ATN/AEE/33KV/S&L/25-26/ Date:
The Executive Engineer Ele,
33KV S&L Division,
HESCOM,Belagavi.
Sub: Submission of Estimates for Sanction.
With reference to the above subject, I am herewith submitting the following estimates for your kind sanction.
Sl.No Name of the work Cost of the estimate
1 Estimate for construction of S/C 33 KV new link line from proposed 110/33/11 KV MUSS Hanamapur to existing 33/11 KV MUSS Muragundi for a distance of 8.2 Kms using coyote ACSR for providing second source and along with incommer isolator at existing 33/11 KV MUSS Muragundi in O&M Division, HESOM, Athani Taluk: Athani Dist: Belagavi, on Total Turn Key basis. 13026355
2 Estimate for construction of S/C 33 KV new link line from proposed 110/33/11 KV MUSS Sankratti to existing 33/11 KV MUSS Saptsagar for a distance of 4 Kms using coyote ACSR for providing second source with incommer 33KV 800Amps isolator at existing 33/11 KV MUSS Saptsagar in O&M Division, HESOM, Athani Taluk: Athani Dist: Belagavi, on Total Turn Key basis. 8093040
3 Estimate for construction of S/C 33 KV new link line from proposed 110/33/11 KV MUSS Sankratti to existing 33/11 KV MUSS Koligudd for a distance of 3 Kms using coyote ACSR for providing second source along with incomming 33KV line breaker at existing 33/11 KV MUSS Koligudd in O&M Division, HESOM, Raibag, Taluk: Raibag, Dist: Belagavi, on Total Turn Key basis. 8527991
4 Estimate for construction of S/C 33 KV new link line from proposed 110/33-11 KV MUSS Hanamapur to the existing 33/11 KV MUSS Jambagi for a distance of 8.0 Kms using Coyote ACSR for providing second source at existing 33/11 KV MUSS Jambagi in O&M Division, HESOM, Athani Taluk: Athani Dist: Belagavi, on Total Turn Key basis Under RDSS Scheme 13089426
5 Estimate for construction of S/C 33 KV new link line from proposed 1X20MVA, 110/33KV at exisiting 2X10MVA, 110/11 KV MUSS Ghatanatti to existing 2X5MVA, 33/11 KV MUSS Sankonatti for a distance of 1.2 Kms using coyote ACSR for providing second source at existing 33/11 KV MUSS Sankonatti in O&M Division, HESOM, Athani, Taluk: Athani, Dist: Belagavi, on Total Turn Key basis. (Under RDSS Scheme) 3199438
6 Estimate for construction of S/C 33 KV new link line from proposed 1X20MVA, 110/33KV at exisiting 2X10MVA, 110/11 KV MUSS Ghatanatti to existing 2X5MVA, 33/11 KV MUSS Nandagaon for a distance of 7.5 Kms using coyote ACSR for providing second source at existing 33/11 KV MUSS Nandagaon in O&M Division, HESOM, Athani, Taluk: Athani, Dist: Belagavi, on Total Turn Key basis. (Under RDSS Scheme) 12577718
7 Estimate for providing additional 2nd 5MVA, 33/11 KV Power Transformer at existing 1X5 MVA,33/11 KV Substation Athani Town in O&M Division, HESCOM, Athani Under Total Turnkey basis. Under RDSS Scheme. 18900137
Yours faithfully
Asstistant Executive Engineer Ele,
33KV S&L Sub-Division HESCOM
ÌÐÔ½ñÏü Á·ÐÔô³ý ÊФн¤Ñ¡Ô ‘Ðo»Ðº ºo¦ÐÔÁԳРHubli Electricity Supply Company Ltd
ÊÐÌÑo¦ÐÔ‘Ð ‘Ño¦ÐÔþºÀÑþÌБРƒ¿°o¦ÐÔo³Ð¤Ð¤ÐÔ(Á) Office of the
ŠÊý ÀÐÔ³ÐÔê ŠÄý ‡»Ð Á¾°Ñ–Ð, Asst.Executive Engineer (Ele)
ÌÐÔ.Á.ÊÐ.‘Ð.º. ƒµÐ±Ò. 33KV S&L Sub-Divn. Athani
No.ATN/AEE/33KV/S&L/25-26/ Date:
The Executive Engineer Ele,
33KV S&L Division,
HESCOM,Belagavi.
Sub: Submission of Estimates for Sanction.
With reference to the above subject, I am herewith submitting the following estimates for your kind sanction.
Sl.No Name of the work Cost of the estimate
1 Estimate for construction of S/C 33 KV new link line from proposed 110/33/11 KV MUSS Hanamapur to existing 33/11 KV MUSS Muragundi for a distance of 8.2 Kms using coyote ACSR for providing second source and along with incommer isolator at existing 33/11 KV MUSS Muragundi in O&M Division, HESOM, Athani Taluk: Athani Dist: Belagavi, on Total Turn Key basis. 13026355
2 Estimate for construction of S/C 33 KV new link line from proposed 110/33/11 KV MUSS Sankratti to existing 33/11 KV MUSS Saptsagar for a distance of 4 Kms using coyote ACSR for providing second source with incommer 33KV 800Amps isolator at existing 33/11 KV MUSS Saptsagar in O&M Division, HESOM, Athani Taluk: Athani Dist: Belagavi, on Total Turn Key basis. 9149851
3 Estimate for construction of S/C 33 KV new link line from proposed 110/33/11 KV MUSS Sankratti to existing 33/11 KV MUSS Koligudd for a distance of 3 Kms using coyote ACSR for providing second source along with incomming 33KV line breaker at existing 33/11 KV MUSS Koligudd in O&M Division, HESOM, Raibag, Taluk: Raibag, Dist: Belagavi, on Total Turn Key basis. 8527991
Yours faithfully Yours faithfully
Asstistant Executive Engineer Ele,
33KV S&L Sub-Division HESCOM
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Hanamapur to the existing 33/11 KV MUSS Muragundi for a distance of 8.2 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on total turnkey basis.
Prop 9.5Mtr RCC DP sets INDEX
Prop 9.5Mtr RCC DP sets
Prop 9.5Mtr RCC TP sets
Prop 9.5Mtr RCC TP sets
Prop Coyote ACSR
Prop Coyote ACSR
Prop 9.5Mtr RCC Pole for line=192 No's
Prop 9.5Mtr RCC DP sets =22No's Prop 9.5Mtr RCC Pole for line=192 No's
Prop 9.5Mtr RCC TP sets =2No's Prop 9.5Mtr RCC DP sets =22No's
Prop 9.5Mtr RCC TP sets =2No's
Asst, Executive Engineer(Ele) Junior Engineer(Ele),
33KV S&L Sub-Division, HESCOM,Athani 33KV line Maintenance Athani
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED.
HTVR & Annual energy loss calculation of existing S/C 33 KV Muragundi feeder eminating from 110\33\11 KV MUSS Athani.
Node No KVA at node CUM KVA Distance KM KVA-KM Conductor constant ohm/kms KVA-KM Conductor constant
1. Total connected load P= 20000
2. Total length in Km. L= 17.2
3. Sum of moments= KVA*KM= 226000
4. LDF= P*L/ KVA*KM 1.52 Total
5. Annual energy sent out of the feeder 38329890 1 Aug-22 180 1308400 2170090 1250700 3420790
7. Diversity factor= Total connected load in KVA/1.73*33*Peak load 1.75 3 Oct-22 80 850400 1452930 1338600 2791530
8. Load factor = Annual energy sent out on the feeder/ Energy computed on the basis of the peak load= Annual energy sent out/ 1.73*33*0.8*8760*peak load 0.48 4 Nov-22 105 1974800 1723840 1140900 2864740
9. Loss load factor(LLF) =0.30*LF+.70*LF*LF) 0.30 7 Feb-23 180 2727200 2434800 2434800
11. Annual energy losses= 0.105*P*P*L*R*LLF/2*LDF*DF*DF 5837289.91 9 Apr-23 200 3199600 Aprox 3145200 3145200
Resistance of the conductor in Ohms per KM= 0.248 10 May-23 3199600 Aprox 48228800 4104000 4104000
12. Add 10% spur line loss= Annual energy loss*0.1= 0.00 12 Jul-23 224 2588800 3870600 3870600
14. HTVR calculation
Asst. Executive Engineer(El), Junior Engineer(El)
33 KV S & L Sub-Division, HESCOM, Athani 33KV line maintenance Athani
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED.
HTVR & Annual energy loss calculation of proposed 33 KV S/C Muragundi link line from 110/33/11 KV MUSS Hanamapur after providing 33 KV S/C link line from 110/33/11 KV MUSS Hanamapur
Node No KVA at node CUM KVA Distance KM KVA-KM Conductor constant ohm/kms KVA-KM Conductor constant
1. Total connected load P= 15000
2. Total length in Km. L= 8.2
3. Sum of moments= KVA*KM= 123000
4. LDF= P*L/ KVA*KM 1.00
5. Annual energy sent out of the feeder 38329890
6. Peak load = 200
7. Diversity factor= Total connected load in KVA/1.73*33*Peak load 1.31
8. Load factor = Annual energy sent out on the feeder/ Energy computed on the basis of the peak load= Annual energy sent out/ 1.73*33*0.8*8760*peak load 0.48
9. Loss load factor(LLF) =0.30*LF+.70*LF*LF) 0.30
10.Load density factor= 1
11. Annual energy losses= 0.105*P*P*L*R*LLF/2*LDF*DF*DF 4235909.50
Resistance of the conductor in Ohms per KM= 0.248
12. Add 10% spur line loss= Annual energy loss*0.1= 0.00
13. Total loss = 4235909.50
14. HTVR calculation
Calculation of Energy Savings
1 HTVR & Annual energy loss calculation of existing S/C 33 KV Muragundi feeder eminating from 110\33\11 KV MUSS Athani. 5837289.91
2 HTVR & Annual energy loss calculation of proposed 33 KV S/C Muragundi link line from 110/33/11 KV MUSS Hanamapur after providing 33 KV S/C link line from 110/33/11 KV MUSS Hanamapur 4235909.50
Therefore Annual Energy Savings in Units = 1-2 1601380.42 1.601380419
Cost Banefit ratio=Energy Saving x 8.35
Cost of Estimate
Asst. Executive Engineer(Ele) Junior Engineer(Ele)
33 KV S & L Sub-Division, HESCOM, Athani 33KV line maintenance Athani
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Part-B 33KV Line breaker material estimate
Sl. No. Particulars Unit Qty to be erected Unit Material Cost Rs. Deloaded 21% New SR 2025-26(20% Loaded) Total Material Cost Rs.
1 33 KV Isolators :
33KV, 800A, 25 KA Class Double Break manually operated isolators with Pad connectors suitable for Coyote ACSR Conductor, as per technical specification with Solid Core, cylindrical post insulators
b) 33 kV, 800 A, 25 kA Upright with Earth Switch complete metallic portion with insulator (KPTCL SR-2023-24, Page No:37, Item No:9.14.1) RS:84700 Nos 1 84700.00 70000.00 84000.00 84000.00
2 Surge Arrestors, Metal Oxide, as per Technical Specification. 0.00
a) 30 kV Metal Oxide with surge counter Arrestor class : Discharge Class 2 (Station Low Duty (SL)- for Overhead Line (KPTCL SR-2023-24, Page No:34, Item No:8.8, Rs:4840) . Nos 3 4840.00 4000.00 4800.00 14400.00
3 Conductors 0.00
a) "Coyote" ACSR Conductor (KPTCL 23-24, Page No.:44, SL No.:20.6. Rs:139) Meter 200 139.00 155.00 31000.00
4 Mounting Structures: 0.00
Mounting Structures for equipments made out of fabricated galvanised angle of High tensile steel for GOS / CT's / PT's / LA's / NCT / HI PI etc as per approved drawing 0.00
a) 33KV Isolators - 0.248 MT (KPTCL SR-2023-24, Page No:43, Sl.No:18, Item No:18.3, Rs:148830 for MT) . (0.248MT=36909.84) (As per KPTCL SR- 2025-26, No- 02, SL.No-16) Nos 1 36909.84 30752.00 30752.00
c) 33KV Lightning Arrestors - 0.075 MT (KPTCL SR-2023-24, Page No:43, Sl.No:18, Item No:18.3, Rs:148830 for MT) . (0.075MT=11162.25) (As per KPTCL SR- 2025-26, No- 02, SL.No-16) Nos 3 11162.25 9300.00 27900.00
5 33KV ODS Structures 0.00
a) RCC Pole - 9 Mtr Long, 145 Kg WL (As per KPTCL SR- 2025-26, Page No- 2 of 50, SL.No-08) Nos 2 7076.00 12018.00 24036.00
b) 11KV ODS mounting structure using 50 x 100 x 50 x 6 mm C channel MS, each 4.0 mtr long , As per PWD Electrical Page 19 Sl.No-5.41.4 Rs-Per Mtr-756.00 3NosX4Mtr=12 Mtr Mtr 12 756.00 756.00 9072.00
6 Insulators & Hardware materials: 0.00
a) Pad clamp for Coyote ACSR (KPTCL SR-2023-24, Sl.No:77, Item No:10.09, Rs:725) Nos 6 725.00 725.00 4350.00
b) T clamp for Coyotte ACSR (KPTCL SR-2023-24, Page No:69, Item No:47.7.11, Rs:509.00) Nos 6 509.00 509.00 3054.00
7 Ground Mat & Earthing : 0.00
a) Grounding of equipment by providing cast iron pipe of 100mm ID 13mm thick, 2.75Mtr long wih 2part clamps out of GI flat 50/6 mm continously welded alround the pipe using cast iron welding electrodes as per drawing (al materials to be supplied by contractors) ( KPTCL CSR 23-24, Labour, Page No: 115, Sl No.: 6c, Rs:12792) , Set 2 12762.00 10547.11 12656.53 25313.06
b) Supplying & providing 450mm dia 450mm hieght 1.5" - 2" thick hume pipe coller ( non PR type) fop earth quits including all lead & lift. ( KPTCL CSR 23-24, Labour, Page No: 124, Sl No.: 26i, Rs:1499) , each 2 1499.00 1238.84 1486.61 2973.22
c) Grounding of equipment with 50/6 mm GI flat & connecting equipment to the earth mat / ground pit. Each point of earthinh with all formation works like bending, twisting, drilling of holes & conncting by welding (inclusive of all T & P consumables) to the earth mat/ ground pit/point of earth connection, all the materails supplied by the contractor ( KPTCL CSR 23-24, Labour, Page No: 123, Sl No.: 26f, Rs:335) , Rmt 45 335.00 276.86 332.23 14950.41
8 a) Bolt & Nut as per IS-1367 GI (HESCOM SR-2023-24, Sl.No:494 to 504, item no:61.12 to 61.22, RS:132571 for MT) MT 0.040 132571.00 0.00
Total cost 272130.69
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
PART-C (33KV Line breaker Electricals Erection Works)
Sl. No. Particulars Unit Qty to be erected Unit Labour Charge Rs. Total Labour Charge Rs.
1 a) Erection of Lightning arrestors and wiring including movement from the point of unloading to the point of erection (33 KV) (KPTCL CSR 23-24, Labour, Page No: 119, Sl No.: 18) Set 1 333.00 333.00
2 a) Erection of Isolators (33 KV) Assembly, Errection alignment and wiring including movement from the point of unloading to the point of erection.(Upright type) ( KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 a(i)) Nos 1 1319.00 1319.00
b) Assisting in Testing and Commissioning ( KPTCL CSR 23-24, Labour, Pg No: 119, Sl No.: 17 E(i) , ) Nos 1 191.00 191.00
3 33KV Station structures:
a) Erection, alignment & assembly of fabricated steel lattice structure, pedestal structures & Mounting structures, for G.O.S. LAs etc. ( KPTCL CSR 23-24, Labour, Page No: 116, Sl No.: 8 b) MT 0.473 5723.00 2706.98 0.48 0.426 0.21
4 a) Formation of cross bus in each individual bay using Lynx/Coyote - Single/Double conductor with fixing of insulators, spacers, levelling the string conductors to the required height above the equipment including providing jumps to inter-connect different segments of the main bus. ( KPTCL CSR 23-24, Labour, Page No: 122, Sl No.: 25) Per bay 1 7364.00 7364.00
5 a) Errection of RCC pole-9Mtr long (HESCOM SR 23-24, Labour page pageNo: 43 & 44, Sl.No: 1&30, Item No:1.1.1 &2.02, Rs:629&1113) No's 2 1742.00 3484.00 1403 only dp 1341
6 Ground Mat & Earthing : 1341
a) Grounding of equipment by providing cast iron pipe of 100mm ID 13mm thick, 2.75Mtr long wih 2part clamps out of GI flat 50/6 mm continously welded alround the pipe using cast iron welding electrodes as per drawing (al materials to be supplied by contractors) ( KPTCL CSR 23-24, Labour, Page No: 115, Sl No.: 6c, Rs:3491) , Set 2 3491.00 6982.00 1403
Total cost 22379.98 59780.84
Asst. Executive Engineer(Ele) Junior Engineer(Ele)
33 KV S & L Sub-Division,HESCOM, Athani 33KV line Maintenance Athani
HUBLI ELECTRICITY SUPPLY COMPANY LIMITED
Construction of S/C 33 KV new line from proposed 110/33/11 KV MUSS Hanamapur to the existing 33/11 KV MUSS Muragundi for a distance of 8.2 Kms using coyote ACSR for providing second source in 33KV S&L Division,Belagavi on total turnkey basis.
PART-D-(CIVIL WORKS)
Sl No. Item Description Unit Qty Unit Price (Rs) Total Price (Rs)
SCHEDULE OF ITEMS FOR ASSOCIATED CIVIL WORKS AND STRUCTURES:
1 Foundations: Engineering, supply of all labour,material and construction of RCC footing including the cost of excavation, cement concreting, reinforcement, backfilling, waterproof cement painting, for all works, grouting underpinning etc ,for the following works
a) 9 mtrs long RCC poles for ODS (As per ESCOM's SR 2023-24,Base concreting Rs.312+Pole concreting Rs.3434,Coping Rs.312) Nos 2 3382 6763.33
b) 33KV Surge arrestor support structure (0.95 mtrX0.55 mtr X 1mtr Depth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Nos 3 4708 14125.00
c) 33KV Isolators support structure(0.95 mtr X 0.45 mtr X 1mtrDepth),with M-20 Concreting,PCC of M-10 and FE-550 TMT steel Set 1 4728 4728.33
2 Earth mat formation : 0 0.00
a) Excavation, formation, refilling. CMT 4 168 673.33
Total cost 26290.00
Tender Capacity Format
Details of work Executed during last 05 years ( To asses the value of A)
Sl No Year Work Executed Other related Electrical Works if any Cost of executed work in Rs Lakhs
New substations / Augmentation in Nos HT line in Rkms(11KV & above) DTC in Nos
Details of existing commitments and on-going works to be completed during next '9 months ( To asses the value of B) Attached in the next sheet
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "9 months" Rs in Lakhs Completion period as per award Completion period remaining
Tender Capacity Formula= A*N*1.5-B
Where 'N'=13months of completion period for above subject work
Seal and signature of the Bidder
A= Maximum value of Distribution network work executed in any one year during the last 5 years i.e 2020-21,2021-22 ,2022-23,2023-24,2024-25 ( UP dated to __________________ price level) taking into account the completed as well as works in progress
N= Number of years/months prescribed for completion of the works for which Tenders are invited
B= Value,at________price level, of existing commitments and on-going works to be completed during the 'N'
Note: 1) The available tender capacity shall be more than the total tender value 2) Documentary Proof in support of value ‘A’, the Total value of works executed and payments received annually in the last 5 years shall be uploaded in the form of certificates issued by Chartered Accountant. In case if the same is not uploaded, then the maximum value of annual payments received towards the works executed which is indicated in the audited balance sheet in any one year during the last five years will be considered.
Tender Capacity Format
Details of existing commitments and on-going works to be completed during next "9 months ( To asses the value of B)
SL No Details of On Going works Award amount Rs in Lakhs Amount of work to be completed during next "9 months" Rs in Lakhs Completion period as per award Completion period remaining
Where 'N'= 13 months of completion period for above subject work
Note: The statement showing the value of existing commitments and ongoing works as well as the stipulated period of completion remaining for each of the works listed shall be countersigned by the Employer in charge, not below the rank of Executive Engineer or equivalent.( Note: L-1 in any of the recently called tender amount is also be considered as value of B along with the above)
Seal and signature of the Executive Engineer(Ele)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
7 Annexures.doc
Others - 7 Annexures • 0.15 MB
6 section v SCC INDENT 1218 call 2.doc
Others - 6 section v SCC INDENT 1218 call 2 • 0.12 MB
10-format-i- work done.xls
Others - 10-format-i- work done • 0.03 MB
1 NIT INDENT 1218 call 2.doc
Others - 1 NIT INDENT 1218 call 2 • 0.14 MB
5 section iv ECC INDENT 1218 call 2.doc
Others - 5 section iv ECC INDENT 1218 call 2 • 0.09 MB
8 technical specification.doc
Others - 8 technical specification • 0.58 MB
11 33KV Hanamapur to Muragundi.xlsx
Others - 11 33KV Hanamapur to Muragundi • 1.21 MB
14 Stamp Duty Circular.pdf
Others - 14 Stamp Duty Circular • 0.09 MB
2 section i IFBINDENT 1218 call 2.doc
Others - 2 section i IFBINDENT 1218 call 2 • 1.41 MB
13 FD417EXP Circular.pdf
Others - 13 FD417EXP Circular • 0.12 MB
9 tender capacity.xlsx
Others - 9 tender capacity • 0.01 MB
15 KPTCL Cicrcular insurance surety bond.pdf
Others - 15 KPTCL Cicrcular insurance surety bond • 1.59 MB
4 section iii GCC INDENT 1218 call 2.doc
Others - 4 section iii GCC INDENT 1218 call 2 • 0.14 MB
12 Advisory NOte.pdf
Others - 12 Advisory NOte • 0.67 MB
3 section ii ITB INDENT 1218 call 2.doc
Others - 3 section ii ITB INDENT 1218 call 2 • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .