Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 25 OTTHAVADA STREET NEAR NEW BUS STAND ARAKKONAM 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | Admitted-Finance |
| 2 | Admitted-Finance NO 29 A SADASIVAM STREET ETHIRAJUPURAM TAMBARAM WEST CHENNAI 600 045 | CHENNAI | CHENNAI | TAMIL NADU | 600045 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | Admitted-Finance |
Tender Value
₹47.6 L
EMD Value
₹47,600
Closing Date
28 Oct 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE/GCC-I/CHENNAI
A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2020_EB_183383_1
PT-011/20-21 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Manali
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹47,600
Yes
6 Nov 2020
22 Oct 2020
29 Oct 2020
22 Oct 2020
28 Oct 2020
22 Oct 2020
90 days
Amount
Labour charges for Clearing of juliflora jungle including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
providing temporary approach bund / protection on the proposed tower location including supplying and neatly stocking of sand bag in rows to specified with the height including the cost of all materials, labour for stiching the sand bags, transport, lead lift etc complete as directed by departmental Engineer at site.
Sinking of well in loose soils, black cotton soil, sandy loam and ordinary soil under water including bailing or pumping charges if necessary etc., complete all incidental charges using special tools and plants such as air compressor, helmet etc., complete and as directed by the department engineer at site. First depth 0 - 2 m
Sinking of well in loose soils, black cotton soil, sandy loam and ordinary soil under water including bailing or pumping charges if necessary etc., complete all incidental charges using special tools and plants such as air compressor, helmet etc., complete and as directed by the department engineer at site. Second depth 2 - 4 m
Manufacturing and supplying of RCC well rings of inner dia 2.40 m, 75 mm thick, 300 mm depth including all cost of materials, transport, labour for providing correct possision and alignment, lead, lift, etc.,complete as directed by the department engineer at site.
Labour charges for transport of template including assembling of template and shifting stub and cleat, shifting template from location to location and reassambling the same including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site.(The template will be make own arrangement by the contractor)
Providing and laying PCC 1:2:4 using 20 mm HBG metal including cost of all materials , curing, labour ,lead ,lift labour for laying concrete etc., complete as per standard specification and as directed by the department engineer at site . With out form work.
Providing and laying PCC 1:2:4 using 20 mm HBG metal for raised chimney with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supplying and providing Pipe type earthing with 40 mm dia GI pipe (medium class) as per specification and as direct by the site engineer including cost of all meterials, cutting of earth wire to the required length and connecting to the tower leg and earth pipe with 2 Nos. bolts, nuts, with washers, drilling charges etc., complete as per specification and as directed by the department engineer at site.
Labour charges for spreading of excavated earth around the foundation towers after stub setting and concreting with excavated earth other than sand in layers of 150mm thick, including charges for spreading watering, consolidation as per standard specification and as directed by the engineer at site including all labour, transport charges, lead and lift etc., complete.
Labour charge for transporting and erection of tower parts including sorting out of tower parts at stores and site, rectification in tower parts if any, cost of T&P, labour, transport from stores, lead, lift, etc., complete as directed by the department engineer at site.
Labour charges for welding of bolts and nuts at two places 1 cm each diagonally opposite each other after tightening and puching to avoid theft of tower parts with one coat of painting zinc coat in the welded portion including cost of welding rod, hire charge for generators, painting the bolts and nuts transporting labour, lead, lift etc complete as per instrution incharge of department engineer at site
Labour charges for Transporting and hoisting of Tension Disc insulators 120 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. Under LC condition
Labour charges for Transporting and hoisting of Single Suspension Disc insulators 90 KN with fittings from store to site including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. Under LC Condition
Providing temporary stay during rough sagging and tensioning including necessary excavation for burying RSJ cut bits/ concrete block with pipe turn buckle/ concreting the anchor in slushy area fixing stay wire and turn buckle, refilling and removal of stays after tensioning including cost of all materials, labour, leads, lifts, etc., complete.
Labour charges for transporting and paying out of 6 Nos. of ACSR Zebra conductor with fittings including sorting out of conductor, providing trussels of 30.0m intervals for paying out of conductors, according to drum schedule and loading and unloading at site providing trussels cost of T&P lead and lift etc., complete.
labour charges for stringing of 6 Nos ACSR Zebra conductor rough sagging tensioning to correct sag and fixing to towers as per specification with fittings cost of T&P lead and lift, etc., complete as directed by the department engineer at site. Continuous Span.
labour charges for stringing of 6 Nos ACSR Zebra conductor rough sagging tensioning to correct sag and fixing to towers as per specification with fittings cost of T&P lead and lift, etc., complete as directed by the department engineer at site. Single Span.
labour charges for paying out of 1 no. GI 7/3.55 mm SWG steel earth wire with fittings cost of loading and unloading, transporting, sorting out of drums at store and at site according to drum schedule, providing trestle, paying out, etc., complete as directed by the department engineer at site.
labour charges for stringing of 1 no. GI 7/3.55 mm earth wire rough sagging tensioning to correct sag and fixing to towers as per specification as directed by the department engineer at site clipping, jumpering, labour charges for fixing midspan compression joints, repair sleeves, wherever required and vibration dampers in all tensio location as directed by the boad and other charges with fittings cost of T&P required for the entire safe operation for stringing work labour, lead, lift, etc., complete . Continuous Span
labour charges for stringing of 1 no. GI 7/3.55 mm earth wire rough sagging tensioning to correct sag and fixing to towers as per specification as directed by the department engineer at site clipping, jumpering, labour charges for fixing midspan compression joints, repair sleeves, wherever required and vibration dampers in all tensio location as directed by the boad and other charges with fittings cost of T&P required for the entire safe operation for stringing work labour, lead, lift, etc., complete . Single Span
Providing muffing and coping in PCC 1:2:4 using broken stone 12 to20 mm with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Plastering in CM 1:3 12 mm thick including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site .
Labour charges for painting tower legs using best qulity anticorroessive black paint two coats 1 m above coping including cost of all materials, labour, transport, lead, lift etc., complete as directed by the department engineer at site.
Arranging and attending shutdowns work on HT / LT, EHT lines, dismandling and restringing of HT / LT / EHT lines after completion of line stringing work including charges for T&P, transport, lead, lift, etc., complete as directed by the department engineer at site (one set means all the conductor and earth wire in the corresponding one no HT / LT / EHT line)
Labour charges for bailing out of water by using pumpset including the cost of heir charges for diesel pumpset 0.5HP, labour fuel charges, transport, T & P, lead, lift ect., complete as directed by the department engineer at site.
Engaging JCB excavator for uprooting trees levelling approach road filling low lying areas on hourly basis including cost of all materials labour, lead & lift etc., complete.
Labour charges for mobilization of gangs for LC work with tools and plants, including cost of idle labour during LC work, transport charges, materials, lead & lift etc., complete as directed by the department engineer at site.
Providing special type trustles during conductor and earth wire stinging work wherever necessary and as directed by the board engineer for telecom lines, roads, railway crossing etc., including cost of all materials transport, T&P, labour, leads and lifts etc., complete and dismantling after completion of stringing works in all respects.
Fabrication and supply of LS tower & cross arm parts, extension including cost of M.S. angle, fabrication, hot dip galvanising charges all trasport charges leads and lifts etc., as per standard specification and as directed by the department engineer at site.
Labour charges for dismantling the existing 8 unit tension insulator and devoluted to stores including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC condition.
Labour charges for dismantling the existing 7 unit Suspension insulator and devoluted to stores including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC condition.
Labour charges for dismantling of 6 nos Zeebra Conductor and devoluted to stores including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC condition.
Labour charges for dismantling of GI earth wire and devoluted to stores including cost of T&P, labour, transport, lead, lift etc., complete as directed by the department engineer at site. Under LC Condtion
SCRAP:- Dismantling of 110 KV existing SC tower and owing the same as is where is condition including cost of dismantling charges, transport, lead, lift etc., complete as directed by the department engineer at site. (The rate should not be quoted not less than Rs. 25,000/- per MT)
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
D RAVI
S S AND CO
M.RAJADURAI CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .