| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.8 LAccepted-AOC R O VILL KHANAR P O MUNDU TEH THEOG DISTT SHIMLA 171226 | SHIMLA | HIMACHAL PRADESH | 171226 | ₹59.8 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹66.3 L+₹6.6 L (11.0%)Rejected-Finance | ₹66.3 L+₹6.6 L (11.0%) | L2 | Rejected-Finance rejected |
| 3 | L3₹69.5 L+₹9.8 L (16.3%)Rejected-Finance | ₹69.5 L+₹9.8 L (16.3%) | L3 | Rejected-Finance rejected |
| 4 | L4₹69.8 L+₹10.1 L (16.8%)Rejected-Finance C O SUMAN ENTERPRISES SERGATA P O KOTI SUB TEHSIL JUNGA DISTT SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | ₹69.8 L+₹10.1 L (16.8%) | L4 | Rejected-Finance rejected |
| 5 | L5₹73.0 L+₹13.2 L (22.1%)Rejected-Finance | ₹73.0 L+₹13.2 L (22.1%) | L5 | Rejected-Finance rejected |
Tender Value
₹87.3 L
EMD Value
₹1.2 L
Closing Date
24 Jul 2026, 6:00 pmClosed
EE HPSAMB
EE HPSAMB
C/o RCC retaining wall at Tharmati, Tehsil Theog Distt. Shimla H.P.
2026_HPAMB_139290_3
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
Percentage
150 days
Tharmati
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
₹1.2 L
20 Aug 2026
17 Jul 2026
25 Jul 2026
17 Jul 2026
24 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 599.04 | Per Cubic Metre | 363.4 | ₹2,17,691.14 |
| 2 | Excavating, supplying and filling of local earth work (including royalty)by mechanical transport in all leads and lifts including ramming and watering of the earth in layers not exceeding 20cm in trenches, , plinth, sides of foundation as required site and as per directed by Engineer-in-Charge. | 2,080 | Per Cubic Metre | 250 | ₹5,20,000 |
| 3 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, height of propping and centering in all heights. below supporting floor to ceiling and removal of the same for in – situ reinforced concrete and plain concrete work in retaining walls, return walls, walls ( any thickness) including attached pilasteres,buttresses, plinth and string cources fillets, kerbs and steps etc.within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | 1,172.65 | Per Square meter | 381.6 | ₹4,47,483.24 |
| 4 | Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) and curing complete, in or under water, including pumping or bailing out water/dewatering, removal of slush which may arise at the time of laying under water complete excluding the cost of form work in foundation and plinth in all depths/heights as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 49.92 | Per Cubic Metre | 4,800 | ₹2,39,616 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government.
a) 1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 40 mm nominal size) | 39 | Per Cubic Metre | 5,600 | ₹2,18,400 |
| 6 | Providing and laying mechanically mixed and vibrated cement concrete 1:1.5:3 (one cement isto one point five sand isto three graded crushed stone aggregate 20mm (twenty millimeter) nominal size) and curing complete excluding the cost of form work in walls ( any thickness) including attached pilasteres,buttresses, plinth and string cources fillets, kerbs and steps etc above plinth level up to floor five leve,in all depths/heights as per HPPWD specifications or as directed by the Engineer-in-Charge including carriage of materials within all leads, lifts. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 396.63 | Per Cubic Metre | 8,500 | ₹33,71,355 |
| 7 | Providing and laying Tor steel reinforcement of TATA, sail , Rashtriya Ispat or its substantial equivalent make for Reinforced Cement Concrete work including bending, binding and placing in position complete including cost of binding wire and other incidentals due for its completion up to all floor level complete as per HPPWD specifications or as directed by the Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidental. The rate inclusive of Malkhana, Royality, Octroi, GST, toll tax or any taxes imposed by the Government. | 31,730.4 | Per Killogramme | 104.5 | ₹33,15,826.8 |
| 8 | Stone soling tightly hand packed under floors, including watering, ramming and consolidating complete and carriage of materials, labour ,tool and plants through all modes of transportation with in all leads and lifts, as per HP. PWD. specifications of 1990 volume-I including carriage of materials, labour, tool and plant through all modes of transportation within all leads and lifts and as per direction of Engineer-in- Charge.The rate including of octory, royalty, malkana, toll tax, sal tax or other taxes imposed by goverment. | 46.8 | Per cubic Metre | 1,522.5 | ₹71,253 |
| 9 | Supplying, filling, spreading & leveling stone boulders of behind retaining walls in the required thickness, for all leads & lifts, all completeas per approved drawing, design and as directed by the Engineer-in-Charge as per HP.PWD., Specifications includng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. | 258.96 | Per Cubic Metre | 922.5 | ₹2,38,890.6 |
| 10 | Providing weepholes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100 mm dia PVC pipe extending through the full with of the structures with slope of 1 (v): 20 (H) towards drawing face complete as per drawing and techinical specification. | 350 | each | 250 | ₹87,500 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
SBD_3_Tharmati_Shimla.pdf
Tender Documents • 6.80 MB
BOQ_206394.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .