| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | ₹6.9 L | L1 | Accepted-AOC accepted |
| 2 | L2₹6.9 LRejected-AOC | ₹6.9 L | L2 | Rejected-AOC rejected |
| 3 | L3₹8.2 LRejected-AOC HANS BHAWAN KALAGARH ROAD DHAMPUR DISTRICT BIJNOR UTTAR PRADESH | DHAMPUR | BIJNOR | UTTAR PRADESH | ₹8.2 L | L3 | Rejected-AOC rejected |
| 4 | L4₹8.2 LRejected-AOC 1098 BAZAR KHOHAL GORAKHPUR UTTAR PRADESH | ₹8.2 L | L4 | Rejected-AOC rejected |
| Sl No | Description | Qty | Unit | RAJENDRA SINGH L4 | NARENDRA KUMAR L2 | M/S KUNWAR ENGINEERING WORKS L1 | YOGESH KUMAR CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | |||||||
| 1.01 | Dismantling brick work or stone work in lime or cement mortar and i/c stacking or materials as directed by the Engineer-in-charge with in a distance of 60 meter (20 Feet) | 5.33 | M3 | 385 ₹2,052.05 | 320 ₹1,705.60 | 300 ₹1,599 | 380 ₹2,025.40 |
| 1.02 | 1st class (M-150) brick work with 1:4 cement mortar using cement amd Coarse sand inclduing cost of all materials, labour, T&P etc. | 20.18 | M3 | 5,200 ₹1.0 L | 4,450 ₹89,801 | 4,900 ₹98,882 | 5,200 ₹1.0 L |
| 1.03 | Laying Ordinary centering and shuttering for R.C.C works i/c. all cost of material, labour, T&P etc. complete the work. | 101 | M² | 560 ₹56,560 | 350 ₹35,350 | 400 ₹40,400 | 558 ₹56,358 |
| 1.04 | Supplying & fixing of Reinforcement steel for R.C.C work i/c cutting ,bending ,binding and cost of binding wire and steel i/c labour and T&P etc. complete the Work. | 0.4 | M.T | 72,400 ₹28,960 | 65,000 ₹26,000 | 71,000 ₹28,400 | 72,000 ₹28,800 |
| 1.05 | Supplying & Fixing mild steel or iron work in heavy size such as trusses, builts gates door, frames record racks roofs work, gates, Gril, Stair etc. including cost of all materials, labour and T&P etc. complete. | 6.82 | Qtl. | 8,399 ₹57,281.18 | 8,000 ₹54,560 | 8,200 ₹55,924 | 8,398 ₹57,274.36 |
| 1.06 | Laying R.C.C. 1:1.5:3 using size (5.6-13.20) mm graded crushed aggregate i/c all cost materials, labour, T&P etc. copmlete of work. | 6.72 | M3 | 6,400 ₹43,008 | 5,600 ₹37,632 | 6,400 ₹43,008 | 6,400 ₹43,008 |
| 1.07 | Laying C.C. 1:2:4 using size (5.6-13.20) mm graded crushed aggregate i/c all cost materials, labour, T&P etc. complete of work. | 0.18 | M3 | 5,300 ₹954 | 5,000 ₹900 | 5,400 ₹972 | 5,300 ₹954 |
| 1.08 | 20 mm thick Cement plaster on brick masonary with 1:4 cement mortar unsing cement and Coarse sand i/c. cost of all material, labour, T&P etc. complete. | 253.2 | M² | 240 ₹60,768 | 190 ₹48,108 | 200 ₹50,640 | 235 ₹59,502 |
| 1.09 | Struck deep cement pointing in 1:2 C:M including cost of all material labour T&P etc. completion the work. | 53.93 | M² | 190 ₹10,246.70 | 150 ₹8,089.50 | 180 ₹9,707.40 | 190 ₹10,246.70 |
Tender Value
₹8.4 L
EMD Value
₹17,000
Closing Date
13 Nov 2025, 4:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER AFZALGARH IRRIGATION DIVISION DHAMPUR
LOT01 Repairing of Damage khalasi Gate No. 9 and 10 and Fix Gate No. 5, 6, 7 and 8 of Nehtaur Gagan Barrage in Distt Bijnor.
2025_UPIDC_1086669_30
04/EEAID/2025-26
Open Tender
Civil Works
60 days
DHAMPUR
AS PER NIT
2 documents required · 2 mandatory
₹266
₹17,000
12 Mar 2026
8 Nov 2025
13 Nov 2025
8 Nov 2025
13 Nov 2025
8 Nov 2025
Amount
Laying and Jointing PVC Pipe. Heading
Dismantling brick work or stone work in lime or cement mortar and i/c stacking or materials as directed by the Engineer-in-charge with in a distance of 60 meter (20 Feet)
1st class (M-150) brick work with 1:4 cement mortar using cement amd Coarse sand inclduing cost of all materials, labour, T&P etc.
Laying Ordinary centering and shuttering for R.C.C works i/c. all cost of material, labour, T&P etc. complete the work.
Supplying & fixing of Reinforcement steel for R.C.C work i/c cutting ,bending ,binding and cost of binding wire and steel i/c labour and T&P etc. complete the Work.
Supplying & Fixing mild steel or iron work in heavy size such as trusses, builts gates door, frames record racks roofs work, gates, Gril, Stair etc. including cost of all materials, labour and T&P etc. complete.
Laying R.C.C. 1:1.5:3 using size (5.6-13.20) mm graded crushed aggregate i/c all cost materials, labour, T&P etc. copmlete of work.
Laying C.C. 1:2:4 using size (5.6-13.20) mm graded crushed aggregate i/c all cost materials, labour, T&P etc. complete of work.
20 mm thick Cement plaster on brick masonary with 1:4 cement mortar unsing cement and Coarse sand i/c. cost of all material, labour, T&P etc. complete.
Struck deep cement pointing in 1:2 C:M including cost of all material labour T&P etc. completion the work.
Providing cement primer on old/new surface i/c cost of all material, labour T & P etc. Complete
Finishing wall with Two coat of water proof cement paint weather coat of approved quality on previously new surface with this paint to give an even shade including supply of all materials, labour, Tools and plants etc. required for proper completion of the work.
Applying primer coat over new Steel or other metal surface after paint including preparing wood work surface including preparing the surface by thoroughly cleaning oil grease dirt and other foreigh matter and scoured with wire brushes fine steel/wood scrappers sand papering and knotting including coat of all and supply of all materials,labour and T&P etc. required for proper completion of the work.
Painting two coat over Priming coat (But excluding cost of priming coat) on wood or Steel or other metal surface with superior synthatic enamel paint of standard make brushing to give an even shade and finished and including cleaning the surface all dirt dust and other foreign matter sand papering and striping including cost matter and scoured with wire brushes fine steel/wood scrappers sand papering and knotting including coat of all and supply of all materials,labour and T&P etc. required for proper completion of the work.
Making of New Wooden Falings Shutter Gate with 7.5 CM thick Shisham wood with all cost of material, labour, T&P and Iron work etc. complete of work.
Making of New Wooden Falings Shutter Gate with 7.5 CM thick Shisham wood with all cost of material, labour, T&P and Iron work etc. complete of work.
NARENDRA KUMAR (BID ID -5673238)
YOGESH KUMAR CONTRACTOR (BID ID -5671755)
RAJENDRA SINGH (BID ID -5669449)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_1999216.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid