Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | L1 | Accepted-AOC aoc | |
| 2 | L2₹5.4 L+₹7,658.61 (1.45%)Rejected-Finance | L2 | Rejected-Finance EMD REFUND | |
| 3 | L3₹5.4 L+₹7,735.20 (1.46%)Rejected-Finance | L3 | Rejected-Finance EMD REFUND | |
| 4 | L4₹5.9 L+₹56,673.71 (10.7%)Rejected-Finance | L4 | Rejected-Finance EMD REFUND | |
| 5 | L5₹6.3 L+₹1.0 L (19.6%)Rejected-Finance N A | FARIDABAD | HARYANA | 121004 | L5 | Rejected-Finance EMD REFUND |
Tender Value
₹7.7 L
EMD Value
₹15,317
Closing Date
5 Oct 2021, 5:30 pmClosed
dceshailendra_shrivastava
NEAR Smart City Office TATPAR PETROL PUMP, ENGINEERING HEAD OFFICE BMC BHOPAL
Construction of Drain from Abdul Kalam Park to Control Shop, Waed 39, Zone 11
2021_UAD_160712_1
2020203122
Open Tender
Civil Works - Buildings
Percentage
60 days
Abdul Kalam Park to Control Shop, Waed 39, Zone 11
AS PER TENDER DOCUMENT
7 documents required · 7 mandatory
₹2,000
₹15,317
29 Sept 2025
21 Sept 2021
6 Oct 2021
21 Sept 2021
5 Oct 2021
21 Sept 2021
eProcurement System Government of Madhya Pradesh Created By: SHAILENDRA SHRIVASTAVA Created Date/Time: 18-Oct-2021 03:53 PM Tender Title: Construction of Drain from Abdul Kalam Park to Control Shop, Waed 39, Zone 11 Tender ID: 2021_UAD_160712_1
Tender Inviting Authority: BHOPAL MUNICIPALCORPORATION
Name of Work: -Construction of Drain from Abdul Kalam Park to Control Shop, Waed 39, Zone 11
Contract No: 2020203112
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 MOHMMED AFAQUE GOURI(GSTN-23AJVPG6231F1ZA) 765861.000 -13.600 661703.904 Six Lakh Sixty One Thousand Seven Hundred and Three
2.00 F K CONSTRUCTION(GSTN-23GNMPK5402H1Z2) 765861.000 -31.000 528444.090 Five Lakh Twenty Eight Thousand Four Hundred and Fourty Four
3.00 SHINING STAR INFRASTRUCTURE(GSTN-23ASFPA2683Q2ZI) 765861.000 -17.500 631835.325 Six Lakh Thirty One Thousand Eight Hundred and Thirty Five
4.00 LAKHAN SHAKYA(GSTN-23CKGPS2379G1ZY) 765861.000 -29.990 536179.286 Five Lakh Thirty Six Thousand One Hundred and Seventy Nine
5.00 RAJDHANI CONSTRUCTION AND DEVELOPER BHOPAL(GSTN-NA) 765861.000 -30.000 536102.700 Five Lakh Thirty Six Thousand One Hundred and Two
6.00 OMA BUILDCOM(GSTN-NA) 765861.000 -23.600 585117.804 Five Lakh Eighty Five Thousand One Hundred and Seventeen
Lowest Amount Quoted BY: F K CONSTRUCTION(528444.090)
BOQ Summary Details Tender Title: Construction of Drain from Abdul Kalam Park to Control Shop, Waed 39, Zone 11 Tender ID: 2021_UAD_160712_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 F K CONSTRUCTION 528444.090 L1
2 RAJDHANI CONSTRUCTION AND DEVELOPER BHOPAL 536102.700 L2
3 LAKHAN SHAKYA 536179.286 L3
4 OMA BUILDCOM 585117.804 L4
5 SHINING STAR INFRASTRUCTURE 631835.325 L5
6 MOHMMED AFAQUE GOURI 661703.904 L6
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .