Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹7.5 L (3.84%)Admitted-Finance PERAMBALUR | TAMIL NADU | 621101 | ₹2.0 Cr+₹7.5 L (3.84%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Panneerselvam L2 | Krishna and Co L1 |
|---|---|---|---|---|---|
| 1.00 | 1.Strengthening the road from Gunamagalam - Arakatalai Road Km 0/0-4/400. Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material SS20A. | 5,280 | Sqm | 8 ₹42,240 | 5 ₹26,400 Lowest |
| 2.00Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | |||||
| 3.00 | Km 0/0 - 4/400 | 5,446.37 | Cum | 25 ₹1,36,159.25 | 19 ₹1,03,481.03 Lowest |
| 4.00Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | |||||
| 5.00 | Km 0/0- 1/000 | 675 | Cum | 125 ₹84,375 | 113 ₹76,275 Lowest |
| 6.00 | Km 1/0- 2/000 | 648 | Cum | 125 ₹81,000 | 113 ₹73,224 Lowest |
| 7.00 | Km 2/0- 3/000 | 673.04 | Cum | 125 ₹84,130 | 113 ₹76,053.52 Lowest |
| 8.00 | Km 3/0- 4/000 | 675 | Cum | 125 ₹84,375 | 113 ₹76,275 Lowest |
| 9.00 | Km 4/0- 4/400 | 270 | Cum | 125 ₹33,750 | 113 ₹30,510 Lowest |
| 10.00Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structure graded and compacted to to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5. (Gravel shoulder) | |||||
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
15 May 2023, 3:00 pmClosed
The Project Director
DRDA, Ariyalur
Strengthening the road from Gunamagalam - Arakatalai Road Km 0/0-4/400 in Package No.TN 30-38 in T.Palur Block of Ariyalur District under Mudhalvarin Grama Salaigal Membattu Thittam (MGSMT) 2022-23
2023_RDTN_309626_1
RC No.A3/1297/2023, Date.18.04.2023
Open Tender
Civil Works - Roads
Works
180 days
DRDA
As per tender document
4 documents required · 4 mandatory
₹0
₹2.0 L
17 May 2023
2 May 2023
15 May 2023
2 May 2023
15 May 2023
2 May 2023
Amount
1.Strengthening the road from Gunamagalam - Arakatalai Road Km 0/0-4/400. Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material SS20A.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structure graded and compacted to to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 301.5. (Gravel shoulder)
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.
Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per MORD Technical Specification Clause 502
Providing and applying Tack Coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg per sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Providing and laying of hot applied thermoplastic compound 2.50mm thick including refletorising glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35, The finished surface to be level uniform and free from streaks and holes etc., complete as per MORTH&H specification No.803..
Providing and fixing Name Board
Providing and Fixing of Cautionary,mandatory and informatory sign Board .
Triangular Signboard
Reflector
Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
Ordinary Kilometer Stone (Precast)
200 m stone (precast)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
1.50m Span RCC Slab Culvert @ Ch 2/700
Supplying and filling foundation and basement with filling sand in layers not more than 15cm thick, wellrammed, watered and compacted complete complying as per Technical Specification Clause 305.3.9
1.50m Span RCC Slab Culvert @ Ch 2/700
Cement concrete 1:4:8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203
1.50m Span RCC Slab Culvert @ Ch 2/700
Cement concrete 1:3:6 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203.
1.50m Span RCC Slab Culvert @ Ch 2/700
Cement concrete 1:2:4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying as per drawing and MORD Technical Specification Clause 802,803,1202 and 1203.
1.50m Span RCC Slab Culvert @ Ch 2/700
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding the cost of reinforcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick and with Kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
1.50m Span RCC Slab Culvert @ Ch 2/700
Supplying and fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors, etc., complete complying with standard specification.
1.50m Span RCC Slab Culvert @ Ch 2/700
Providing and fixing 6mm Bitumen felt for expansion joint between Bed Blockl and Deck slab including all labour charges etc., complete as directed by the departmental officers.
1.50m Span RCC Slab Culvert @ Ch 2/700
Providing and fixing Tar Paper for bearing Between Bed Block and Deck slab including all labour charges etc., complete as directed by the departmental officers.
1.50m Span RCC Slab Culvert @ Ch 0/850
Providing weepholes in Brick Masonry / Stone Masonry, Plain / Reinforced concrete Abutment, Wing wall, Return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1 (V) : 20 (H) towards drawing face complete as per drawing and technical specifications clauses 614, 709, 1204.3.7
1.50m Span RCC Slab Culvert @ Ch 2/700
Gravel filling between bodywall including cost and conveyance of gravel, labour for filling, watering and compacting etc., complete with standard specifications and as directed by the departmental officers.
1.50m Span RCC Slab Culvert @ Ch 2/700
Supplying and erecting centering for sides and soffits including supports for all reinforced cement concrete works like lintels, beams, etc., including strutting 3M high using Mild steel sheets of size 90cm × 60cm and B.G. 10, stiffened with Mild steel Angles of size 25mm × 25mm × 3mm laid over Silver oak (cw) joists of size 10cm × 6.5cm (Spaced about 91cm c/c) including removing the same after specified period without damaging RCC works in all floors etc., complete as directed by the departmental officers complying with relevant standard specifications
Below GL
Above G.L
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Panneerselvam
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.18 MB
TechnicalBid38.pdf
Tender Documents • 0.67 MB
PriceBid38.pdf
Tender Documents • 0.37 MB
BOQ_367600.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .