| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹11.1 LAccepted-AOC NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | 1 | Accepted-AOC Eligible Tenderer |
Tender Value
Refer Docs
EMD Value
₹11,900
Closing Date
1 Aug 2022, 3:00 pmClosed
SE CEDC Central
110KV Valluvarkottam SS Complex Nungambakkam
Works contract for Electrical work for raising of Power Transformer plinth height involving dismantling pulling and erection of Power Transformer
2022_EB_241367_1
Spec No 26 22-23 dt 12.07.22
Open Tender
Electrical Works
Works
30 days
110KV Valluvarkottam SS Complex Nungambakkam
EMD Schedules B to F, Check list and other documents Annexures I to IV which ever is applicable
3 documents required · 3 mandatory
₹0
₹11,900
Yes
18 Jan 2023
12 Jul 2022
2 Aug 2022
12 Jul 2022
1 Aug 2022
19 Jul 2022
13 Jul 2022 - 19 Jul 2022
Dismantling and Pulling of Power Transformer from Plinth of 16 MVA 33/11KV Power Transformers at 110/33/11KV R.A.Puram SS ,33/11KV West Mambalam SS and 33/11 KV Foreshor Estate SS
Labour charges for Dismantling of 16MVA, 33/11 kV Make Power Transformer and provision of suitable dummy plates for all openings where ever necessary
Labour charges for removing control cables of OLTC,Diff wiring ,fan wiring etc of 1 *16MVA, 33/11kV Power Transformer.
Hire Charges of Crane for Dismantling of accessories of 16MVA, 33/11kV Power Transformer
Labour Charges for Draining of Oil from Old Healthy 16MVA, 33/11kV Power Transformer using Filter Machine/Oil pump/ Hose Etc, per itre (excess quantity above 800 litres)
Labour charges for pulling 16 MVA,33/11kV Power Transformer from plinth and placing at safety place in the same SS for an approximate weight of 32 MT and for an approximate distance of 15 metres. (32 MT X 15 mts = 480 MT/M)
Labour charges for loading the Transformer including Raising and Lowering of Power Transformer using suitable jacks as many times required with or without accessories and oil for moving the Transformer from Existing Plinth to the New Plinth and Placing as required at site and using crane/jacky where ever required
Erection of Healthy 16 MVA, 33/11KV Power Transformers at 110/33/11KV R.A.Puram SS ,33/11KV West Mambalam SS and 33/11 KV Foreshor Estate SS
Hire Charges for Crane for Erection of Healthy 16MVA, 33/11kV Power Transformer accessories
Labour Charges for Erection of Healthy 16 MVA, 33/11kV Power Transformer
Labour Charges for connecting control cable for OLTC,Diff wiring ,fan wiring etc of Healthy 16 MVA, 33/11kV Power Transformer
Labour Charges for Hot Oil Circulation in Main Tank and OLTC under Hot Oil circulation, vaccum drying wherever applicable and circulation of Oil till satisfactory results are obtained before Commissioning.
Labour charges for Oil filling into PowerTransformer per litre in excess of 800 Litres
Rental charges for Oil Filtration Unit
Labour charges for earthing of Power Transformer tank and neutral at 2 points, Marshalling Box, D.M.Box, RTCC Panel, Etc,. Using 50X8 mm M.S.Flat( Flat to be supplied by TANGEDCO)
Labour Chargers for Painting of 16 MVA 33/11KV Power Transformers at 110/33/11KV R.A.Puram SS ,33/11KV West Mambalam SS and 33/11 KV Foreshor Estate SS and Overhauling of 16 MVA 33/11KV Power Transformers at 33/11 KV Foreshor Estate SS
Labour charges for preliminary cleaning, covering aluminium painting and enamel color painting using air compressor and painting spray gun,brush,etc,. (preferrably Asian, Nerolac, Berger make paints)
Labour charges for attending oil leakages including replacement of gasket ininspection covers and other places whereever required as per the site cconditions
OLTC Top Cover Replacement at Foreshore Estate SS
HT Side CT Gasket Replacement at Foreshore Estate SS
Top Cover Inspection door at Foreshore Estate SS
HT Bushing Gasket Replacement at Foreshore Estate SS
Empty Barrel (Including loading & unloading) at Foreshore Estate SS
Dismantling and Pulling of Power Transformer from Plinth of 1 No 50 MVA ,110/33 KV Power transformer at 110/33/11KV R.A.Puram SS
Labour charges for Dismantling of 50MVA, 110/33kV Make Power Transformer and provision of suitable dummy plates for all openings where ever necessary
Labour charges for removing control cables of OLTC,Diff wiring ,fan wiring etc of 50MVA, 110/33kV Power Transforme
Hire Charges of Crane for Dismantling of accessories of 50MVA, 110/33kV Power Transformer
Labour Charges for Draining of Oil from Old Healthy 50MVA, 110/33kV Power Transformer using Filter Machine/Oil pump/ Hose Etc, per litre (excess quantity above 800 litres)
Labour charges for pulling 50MVA, 110/33kV Power Transformer from plinth and placing at safety place in the same SS for an approximate weight of 72 MT and for an approximate distance of 15 metres. (72 MT X 15 mts = 1080 MT/M)
Labour charges for loading the Transformer including Raising and Lowering of Power Transformer using suitable jacks as many times required with or without accessories and oil for moving the Transformer from Existing Plinth to the New Plinth and Placing as required at site and using crane/jacky where ever required
Erection of Healthy 1 No 50 MVA ,110/33 KV Power transformer at 110/33/11KV R.A.Puram SS
Hire Charges for Crane for Erection of Healthy 50MVA, 110/33kV Power Transformer accessories
Labour Charges for Erection of Healthy 50MVA, 110/33kV Power Transformer
Labour Charges for connecting control cable for OLTC,Diff wiring ,fan wiring etc of Healthy 50MVA, 110/33kV Power Transformer
Labour Charges for Hot Oil Circulation in Main Tank and OLTC under Hot Oil circulation, vaccum drying wherever applicable and circulation of Oil till satisfactory results are obtained before Commissioning.
Labour charges for Oil filling into PowerTransformer per litre in excess of 800 Litres
Rental charges for Oil Filtration Unit
Labour charges for earthing of Power Transformer tank and neutral at 2 points, Marshalling Box, D.M.Box, RTCC Panel, Etc,. Using 50X8 mm M.S.Flat( Flat to be supplied by TANGEDCO)
Labour Chargers for Painting of 50MVA, 110/33kV Power Transformer at 110/33/11KV R.A.Puram SS
Labour charges for preliminary cleaning, covering aluminium painting and enamel color painting using air compressor and painting spray gun,brush,etc,. (preferrably Asian, Nerolac, Berger make paints)
Labour charges for attending oil leakages including replacement of gasket ininspection covers and other places whereever required as per the site cconditions
Dismantling and Pulling of Power Transformer from Plinth of 8 MVA 33/11KV Power Transformers at 33/11KV West Mambalam SS.
Labour charges for Dismantling of 8 MVA, 33/11 kV Make Power Transformer and provision of suitable dummy plates for all openings where ever necessary
Labour charges for removing control cables of OLTC,Diff wiring ,fan wiring etc of 1 * 8 MVA, 33/11kV Power Transformer.
Hire Charges of Crane for Dismantling of accessories of 8 MVA, 33/11kV Power Transformer
Labour Charges for Draining of Oil from Old Healthy 8 MVA, 33/11kV Power Transformer using Filter Machine/Oil pump/ Hose Etc, per itre (excess quantity above 800 litres)
Labour charges for pulling 8 MVA,33/11kV Power Transformer from plinth and placing at safety place in the same SS for an approximate weight of 32 MT and for an approximate distance of 15 metres. (32 MT X 15 mts = 480 MT/M)
Labour charges for loading the Transformer including Raising and Lowering of Power Transformer using suitable jacks as many times required with or without accessories and oil for moving the Transformer from Existing Plinth to the New Plinth and Placing as required at site and using crane/jacky where ever required
Erection of Healthy 8 MVA 33/11KV Power Transformers at 33/11KV West Mambalam SS.
Hire Charges for Crane for Erection of Healthy 8 MVA, 33/11kV Power Transformer accessories
Labour Charges for Erection of Healthy 8 MVA, 33/11kV Power Transformer
Labour Charges for connecting control cable for OLTC,Diff wiring ,fan wiring etc of Healthy 8 MVA, 33/11kV Power Transformer
Labour Charges for Hot Oil Circulation in Main Tank and OLTC under Hot Oil circulation, vaccum drying wherever applicable and circulation of Oil till satisfactory results are obtained before Commissioning.
Labour charges for Oil filling into PowerTransformer per litre in excess of 800 Litres
Rental charges for Oil Filtration Unit
Labour charges for earthing of Power Transformer tank and neutral at 2 points, Marshalling Box, D.M.Box, RTCC Panel, Etc,. Using 50X8 mm M.S.Flat( Flat to be supplied by TANGEDCO)
Labour Chargers for Painting of 8 MVA 33/11KV Power Transformers at 33/11KV West Mambalam SS.
Labour charges for preliminary cleaning, covering aluminium painting and enamel color painting using air compressor and painting spray gun,brush,etc,. (preferrably Asian, Nerolac, Berger make paints)
Labour charges for attending oil leakages including replacement of gasket ininspection covers and other places whereever required as per the site cconditions
stage.html
html • 0.04 MB
tech_bid_open.pdf
PDF • 0.07 MB
tech_eval.pdf
PDF • 0.07 MB
boq_comp_chart.xlsx
xlsx • 0.01 MB
fin_eval.pdf
PDF • 4.21 MB
aoc.pdf
PDF • 0.62 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .