Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC GORAKHPUR SADAR GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹21.2 L Quoted ₹18.0 L | L1 | Accepted-AOC Work order issued |
| 2 | L2₹18.9 L+₹93,559.43 (5.20%)Rejected-Finance 02 | ₹18.9 L+₹93,559.43 (5.20%) | L2 | Rejected-Finance L2 |
| 3 | L3₹19.5 L+₹1.5 L (8.12%)Rejected-Finance | ₹19.5 L+₹1.5 L (8.12%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical 0 BELCHAURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 | MAU | UTTAR PRADESH | 275101 | - | - | Rejected-Technical Dis qualify |
| 5 | Rejected-Technical | - | - | Rejected-Technical Dis qualify |
Tender Value
Refer Docs
EMD Value
₹52,562
Closing Date
18 Mar 2026, 5:00 pmClosed
EE
Nagar Nigam Gorakhpur
Painting and repair work of CC road and park in Buddha Vihar Part A
2026_DOLBU_1121485_1
Jalkal Budhh Vihar Part - A
Open Tender
Civil Works
Percentage
30 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,130
Nagar Nigam Gorakhpur
₹52,562
25 Jul 2026
28 Feb 2026
19 Mar 2026
28 Feb 2026
18 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A | |||||
| 1.01 | RCC Work with cement concrete (1:1.5:3) including all completion of work. | 72.8 | Cum | 9,082 | ₹6,61,169.6 |
| 1.02 | M.S or iron work in renforcement cutting bending , binding ,and placeing incl. etc. all. | 85.72 | qtl | 7,690 | ₹6,59,186.8 |
| 1.03 | M 150 class brick work in 1:4 with cement &approved Course Sand mortar including supply all material and S.I.N. labor etc. | 52.5 | Cum | 5,817 | ₹3,05,392.5 |
| 1.04 | 12mm thick cement plaster in 1:4 cement mortor with 1 cement and 4 course sand including etc. all complete of work. | 172 | Sqm | 159 | ₹27,348 |
| 1.05 | Laying C.C in 1:2:4 for top of drain work. with cement, Course Sand20 mm & Stone Grit including supply of all material and labour etc. | - | Cum | 8,186 | - |
| 1.06 | P/L of 125 micron polythine including etc. all complete of work. | 240 | Sqm | 24 | ₹5,760 |
| 1.07 | S/Laying of GSB 53.-9.5 mm thick S/B upto 10Cm loose Layer including etc. all complete of work. | 28.8 | Cum | 3,134.25 | ₹90,266.4 |
| 1.08 | Consolidation of GSB upto 10 cm thick loose layer by Road Roller including etc. all.complete. | 28.8 | Cum | 210 | ₹6,048 |
| 1.09 | P/fixing of Road Barricating including etc. all complete of work. | 80 | Rmt | 118 | ₹9,440 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
b.pdf
Tender Documents • 0.70 MB
BOQ_2086738.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .