| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-AOC | ₹1.3 Cr | 1 | Accepted-AOC l1 |
| 2 | 2₹1.3 CrRejected-Finance ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | ₹1.3 Cr | 2 | Rejected-Finance 2 |
Tender Value
₹1.4 Cr
EMD Value
₹9.2 L
Closing Date
16 Mar 2026, 12:00 pmClosed
SE BSRO PWD BULANDSHAHR
SE BSRO PWD BULANDSHAHR
New Construction work of village Jhadina to village Bhagwantpur Road
2026_CEMRT_1123634_9
2571/96M/E-TENDER/BSRO/2025-26 DT 28.02.2026
Open Tender
Civil Works
180 days
HAUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹9.2 L
Yes
25 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
Excavation for roadwork in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross section and transporting to the embankement location with a lift upto 1.5 m and lead upto 1000 m as per Technical specification Clause 302.3. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. with ordinary earth in Patri. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/ tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density complete as per technical MORD Specifications 401 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
(Cement Treated Base) providing, laying and spreading in uniform layers with motor grader on a preparedSub base, Cement @ 4% by weight to the spread Material manually,mixing in place with Rotavator and compacting with Road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using grade VG-10 bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades by manual means As per Technical Specification Clause 508. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specification 1.3.6 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specification Clauses 600,1202 & 1203. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing and Laying of hume pipe of 350 mm dia jointing ends, fixing collers with cement sand mortar Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing and Laying of hume pipe of 600 mm dia jointing ends, fixing collers with cement sand mortar Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Pointing with cement mortar 1:3 on brickwork as per drawing and technical specification Clauses 613.3 and 1204 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Reinforced cement concrete M15 grade Ordinary kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Reinforced cement concrete M15 grade Hectometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of First Year @0.00%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.75%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @1.50%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @2.25%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @3.0%
Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing concrete for plain/reinforced concrete Grade M10 (1:3:6) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Plain/reinforced cement concrete M20 (1:2:4) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specificatio Clause 1002,1005,1010 & 1202 Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing & fixing empty cement bags filled with local earth hand sewing with suja & sutli and placing in position within 60 m Including cost of all material, labour, T&P,and royalty but excluding cost of GST SI. 5.10 (a)
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of First Year @0.00%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Second Year @0.25%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Third Year @0.50%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fourth Year @0.75%
Maintainance Charge including Bituminous Work, Cement Concrete work, Earth Work, Earth Work on patri, Culvert, etc as per Direction of E/I for the period of Five Year from the actual completion of work and As per GO No. 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 as per Prevailing GO Maintainance of Fifth Year @1.0%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
Tendernotice_2.pdf
PDF • 19.63 MB
BOQ_2093396.xls
BOQ • 1.12 MB
Download all tender documents and submit your bid