Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Accepted-Technical All documents in order |
Tender Value
₹12.2 L
EMD Value
₹24,400
Closing Date
25 May 2026, 6:00 pmClosed
Executive Engineer Irrigation Division No.II Jammu
Jammu
Restoration of damage to the PCC jacketing of piers 01 No. foundation of steel aqueduct at RD 53050 mtr of Main Ranbir Canal
2026_IFC_308711_2
E-NIT NO. 04 of 04/2026-27
Open Tender
Civil Works - Canal
Percentage
30 days
Jammu
As per NIT
2 documents required · 2 mandatory
₹1,000
Executive Engineer Irrigation Division No.II Jammu
₹24,400
12 Jun 2026
25 Apr 2026
26 May 2026
25 Apr 2026
25 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil . | 32 | Per Cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 8 | Per Cum | 1 | ₹7.99 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 64 | Per Cum | 1 | ₹63.94 |
| 4 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: | 12.8 | Per Cum | - | - |
| 5 | Hand-packing stones in wire-crates; excluding cost of crates and stones | 81 | Per Cum | 1 | ₹80.92 |
| 6 | Supply of stones | 68.85 | Per Cum | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. | 71.28 | Per Sqm | - | - |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m taking 90% of qty. of earthwork in excavation vide item No.1 i.e.. | 15.62 | Per Cum | - | - |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level | 2,877.93 | kg | - | - |
| 10 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like one No. honda set 4 stroke technology, max. discharge 0.90 Kl/min or 54 kl/hr@70% efficiency for 45 hrs | 385 | Per Kltr. | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_1000135.xls
BOQ • 0.26 MB
Corrigendum1.pdf
PDF • 0.67 MB
corrigendum.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .