Tender Value
Refer Docs
EMD Value
₹18,310
Closing Date
14 Sept 2026, 2:25 pm
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
TPI Agency
Not Applicable
90 days
Expenditure
General
ELECT
6 conditions · 1 needing a document upload
Bulk quantity order(s), constituting Minimum 80% of the Net Procurable quantity (NPQ), against the tender shall be placed on the manufacturers or its authorized agents who have successfully supplied either "a) Minimum 20% of the overall tendered quantity of the NIT against any single order. Or b) Minimum 30% of the overall tendered quantity of the NIT, against multiple orders, on cumulative basis." Of the tendered item or its variant to Zonal Railways/PUs/CORE/PSUs/Other Central Govt. Department/Metro Railway, in last three financial year and current financial year up to the date of tender opening. (Note : Please also refer the other conditions related with implementation and applicability of eligibility criteria that are mentioned in Para 1.1 of general conditions of tender in section-II of NWR tender condition(SBD)).
In case the manufacturer or OEM of authorized agent is approved vendor for bulk order by any PU (ICF/RCF/MCF/CLW/DLW/CORE/DMW etc) or RDSO for the tendered item, the firm shall be eligible for bulk, regular or entire quantity order. However, the firm must upload the copy of their valid document of approval for the tendered item along with their offer.
Development quantity order up to 20% of NPQ may be placed on manufacturers or their authorized agent who do not comply with condition mentioned in Para1.1.1 and 1.1.2 but demonstrate their capacity cum capability to manufacturer/supply the tendered item. For this purpose, they must upload necessary documents such as past performance for having supplied similar item to any Central Govt. unit/PSU/Public Limited Company or registration with NSIC/Udyam/Zonal Railway as manufacturer that covers the tendered item or proof of development vendor in any PU(ICF/RCF/MCF/CLW/DLW/CORE/DMW etc)/RDSO list for the tendered item. (Note : Please also refer the other conditions related with implementation and applicability of eligibility criteria that are mentioned in Para 1.1 of general conditions of tender in section-II of NWR tender condition(SBD)).
Bidders are requested to comply the requirement as per para 3 of SBD for Earnest Money Depost (EMD) falling which offer shall be summarily rejected. Bidders are seeking Waiver or exemption from payment of EMD shall have to attach scanned copy of the requisite document evidence in support of their claim. All bidder who are exempted to submit EMD as per Clause 3.1.1 of Section-I of NWR Tender document, are required to sign Bid Security Declaration as mentioned in clause 3.1.5. Submission of offer by such exempted bidders will be considered that they have signed the above bid security declaration. Bidders who are not exempted to submit EMD and bidders who are under disqualification for EMD exemption as on date of tender opening, are mandatorily required to submit EMD (online) as mentioned in Tender NIT. (Note: Please refer Para 4 in section-I of NWR tender condition (SBD) for applicability of MSE benefits).
In case tenderers participate as an authorized agent, then the performance as required above shall be that of the Principal, authorizing the agent. It may so happen that the agent has credentials of past supply for a different Principal but this will not be considered as performance for placing bulk order in case of change of Principal.
Firm who are traders/authorized agents, are requested to indicate name and address of manufacturer works and submit the TENDER SPECIFIC AUTHORIZATION letter from their manufacturer on their letterhead along with the tender. Non-submission of valid OEM TENDER SPECIFIC AUTHORIZATION letter will make their offer invalid and offer will be summarily rejected.
29 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
INSPECTION CLAUSE : Inspection by TPI only. NOTE : The TPI (Third party inspection) agency is auto-assigned by system, so firms are advised not to mention/quote specific name of particular TPI/TPIs or firm are advised not to quote deviations such as visual inspection or consignee inspection or inspection against GC/TC/WTC etc., otherwise it will be considered as deviation in INSPECTION CLAUSE & such offer shall be summarily rejected.
SD Condition: Security deposit will be applicable as Clause 12 of Section-II of NWR tender conditions.
Micro and Small Enterprises firms:- Benefits preferential treatment to Micro and small enterprises shall be applicable as per para 4 of section-I CONTAINED IN nwr SBD attached with the tender. Therefore, bidders are required to submit Udyam registration certificate along with the offer. Bidders not submitting the required document will not be eligible to claim benefits extended to MSE firms.
Tenderer should mention in their offer: - 1. Name of manufacture with complete address. 2. Place of inspection be indicated with complete address, option for inspections at godowns/outstation/multiple places be strictly avoided, and preferably be permitted only at manufacturers place.
2 conditions
Offer with any deviation from INSPECTION CLAUSE mentioned in tender will be SUMMARILY REJECTED.
Validity of offer is 90 days. If any deviation submitted by the firm in validity of offer then their offer shall be summarily rejected.
2 locations across Rajasthan · 278 Numbers total
FOUR 'V' DEEP GROOVE ALTERNATOR PULLEY, SUITABLE FOR USE IN 4.5 kW BRUSHLESS ALTERNATOR OF TRAIN LIGHTING COACHES, AS PER RDSO DRAWING NO. SKEL-3882 (REV-2)-2014, AND CONFORMING TO RDSO SPECIFICATION NO. ELPS/SPEC/TL/13 MARCH, 1998 and RDSO/PE/SPEC/TL/0054-2003 (Rev.-0) with Amendment no. 1&2.
40261243~NWR
40261243
Open - Indigenous
Goods
Ajmer, Rajasthan
₹0
₹18,310
7 Aug 2026
7 Aug 2026
1 item · 278 Numbers total
FOUR 'V' DEEP GROOVE ALTERNATOR PULLEY, SUITABLE FOR USE IN 4.5 kW BRUSHLESS AL TERNATOR OF TRAIN LIGHTING COACHES, AS PER RDSO DRAWING NO. SKEL-3882 (REV-2)-2014, AND CO NFORMING TO RDSO SPECIFICATION NO. ELPS/SPEC/TL/13 MARCH, 1998 and RDSO/PE/SPEC/TL/0054-200 3 (Rev.-0) with Amendment no. 1&2. [ Warranty Period: 30 Months after the date of delivery ] [Quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total PO value variation Permitted: Max 8 lacs ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| CARRIAGE STORES DEPOT AJMER, NWR | Rajasthan | 35.00 Numbers |
| JODHPUR STORES DEPOT, NWR | Rajasthan | 243.00 Numbers |
| Total | 278 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5620253.pdf
ATTACHMENT
5818401.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].