Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.7 LAccepted-AOC | ₹42.7 L | L1 | Accepted-AOC technically qualified and quoted lowest amount |
| 2 | L2₹44.0 LRejected-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹44.0 L | L2 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 3 | L3₹44.9 LRejected-Finance VILL AMSERUWA POST SIDDHOUR DISTT BARABANKI | BARABANKI | ₹44.9 L | L3 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 4 | L4₹47.0 LRejected-Finance A 5 KAUSHALPURI COLONY KHARGAPUR GOMTI NAGAR LUCKNOW 226010 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226010 | ₹47.0 L | L4 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| 5 | L5₹47.3 LRejected-Finance | ₹47.3 L | L5 | Rejected-Finance QUOTED HIGHER RATE THAN L1 |
| Sl No | Description | Qty | Unit | M/S Kamlesh Kumar Singh L6 | M S DHERENDRA KUMAR PANDEY L8 | HARI OM ENTERPRISES L4 | Ram Asrey L5 | DHARAM DEV CHAUHAN L10 | MS VIDHUSHEKHAR SINGH L1 | M/S SATYENDRA KUMAR SINGH L3 | Pradeep Kumar Singh L9 | M/S SINGH CONTRACTOR L7 | M/s Nav Bharat Construction L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in Making Road Diversion By Power transport with lead upto 5 Km including Excavation ,loading, unloading,Royalty ,dressing mechanical completion to achive 98% density. | 300.72 | Cum | 60 ₹18,043.20 | 120 ₹36,086.40 | 160 ₹48,115.20 | 250 ₹75,180 | 100 ₹30,072 | 100 ₹30,072 | 181 ₹54,430.32 | 85 ₹25,561.20 | 63.52 ₹19,101.73 | 263.13 ₹79,128.45 |
| 2.00 | Earth work in strengthinig Of Bank with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles. | 980 | Cum | 50 ₹49,000 | 110 ₹1.1 L | 70 ₹68,600 | 98 ₹96,040 | 70 ₹68,600 | 30 ₹29,400 | 65 ₹63,700 | 90 ₹88,200 | 63.52 ₹62,249.60 | 96.14 ₹94,217.20 |
| 3.00 | Demolishing Lime concrete Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. | 95.25 | Cum | 100 ₹9,525 | 250 ₹23,812.50 | 300 ₹28,575 | 390 ₹37,147.50 | 1,000 ₹95,250 | 100 ₹9,525 | 300 ₹28,575 | 300 ₹28,575 | 150.86 ₹14,369.42 | 298.41 ₹28,423.55 |
| 4.00 | Demolishing brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. | 16.1 | Cum | 400 ₹6,440 | 250 ₹4,025 | 400 ₹6,440 | 970 ₹15,617 | 800 ₹12,880 | 983 ₹15,826.30 | 650 ₹10,465 | 700 ₹11,270 | 150.86 ₹2,428.85 | 722.5 ₹11,632.25 |
| 5.00 | Demolishing brick work in lime mortar manually/By mechanical means I/C disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. | 333.5 | Cum | 160 ₹53,360 | 130 ₹43,355 | 300 ₹1.0 L | 450 ₹1.5 L | 800 ₹2.7 L | 200 ₹66,700 | 300 ₹1.0 L | 300 ₹1.0 L | 150.86 ₹50,311.81 | 358.09 ₹1.2 L |
| 6.00 | Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site. | 300 | Hr. | 65 ₹19,500 | 160 ₹48,000 | 120 ₹36,000 | 220 ₹66,000 | 200 ₹60,000 | 50 ₹15,000 | 95 ₹28,500 | 90 ₹27,000 | 150.86 ₹45,258 | 153.61 ₹46,083 |
| 7.00 | E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. | 316.98 | Cum | 75 ₹23,773.50 | 120 ₹38,037.60 | 100 ₹31,698 | 130 ₹41,207.40 | 120 ₹38,037.60 | 40 ₹12,679.20 | 90 ₹28,528.20 | 100 ₹31,698 | 119.1 ₹37,752.32 | 107.6 ₹34,107.05 |
| 8.00 | Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete. | 66.52 | Cum | 200 ₹13,304 | 850 ₹56,542 | 500 ₹33,260 | 850 ₹56,542 | 700 ₹46,564 | 400 ₹26,608 | 650 ₹43,238 | 750 ₹49,890 | 198.5 ₹13,204.22 | 667.24 ₹44,384.81 |
| 9.00 | Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete. | 57.91 | Cum | 5,600 ₹3.2 L | 6,700 ₹3.9 L | 6,200 ₹3.6 L | 6,610 ₹3.8 L | 6,800 ₹3.9 L | 5,500 ₹3.2 L | 5,100 ₹3.0 L | 6,300 ₹3.6 L | 5,955 ₹3.4 L | 5,032.55 ₹2.9 L |
| 10.00 | Laying Plain Cement Concrete (M -10) in foundation 1:3:6 with stone grid including cost of material, labour, T&P etc, complete. | 22.99 | Cum | 5,600 ₹1.3 L | 6,500 ₹1.5 L | 6,050 ₹1.4 L | 6,100 ₹1.4 L | 6,200 ₹1.4 L | 5,500 ₹1.3 L | 4,950 ₹1.1 L | 6,000 ₹1.4 L | 4,843.4 ₹1.1 L | 4,794.79 ₹1.1 L |
Tender Value
₹60 L
EMD Value
₹1.2 L
Closing Date
17 Oct 2025, 1:00 pmClosed
SE SIX CIRCLE LUCKNOW
SE Six circle lucknow
Lucknow shakha ke km 184.585 par puliya nav nirman ka karya
2025_UPIDC_1081543_18
03/SE-6/2025-26
Open Tender
Civil Works
90 days
Lucknow
please refer tender document
2 documents required · 2 mandatory
₹2,954
₹1.2 L
SE Six circle lucknow
21 Jan 2026
10 Oct 2025
17 Oct 2025
10 Oct 2025
17 Oct 2025
10 Oct 2025
13 Oct 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid