Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹83.0 Laccepted-aoc | ₹83.0 L | accepted-aoc |
Tender Value
₹83.0 L
EMD Value
₹84,000
Closing Date
30 Apr 2026, 9:30 pmClosed
Rural Development and Panchayat Raj Department
Improvements to various Roads in Package 2 of Ranebennur Taluk Haveri District under Chief Ministers Infrastructure Development Program 75 percent Grant (Reserved for Cat-1)
RDPR/2026-27/RD/WORK_INDENT26300
RDPR/2026-27/RD/WORK_INDENT26300
Reserved
Roads
RDPR Division Office Haveri
11 documents required · 11 mandatory
Workdone Certificate Satisfactorily completed as a prime contractor, at least one any nature of work of value not less than Rs. 20.76 lakhs in any one year.-usually not less than 25 Percentage of the estimated value of contract-2021-22 to 2025-26
Workdone Certifiate Satisfactorily completed as a prime contractor, following quantities GSB- 229.82 Cum, WBM/WMM- 108.24 Cum, RCC/PCC- 374.18 Cum, E/w- 542.15 Cum, Steel- 5.37 Tonne 2021-22 to 2025-26. Work done certificate with work indent number is mandatory.
To qualify for award of the Contract, each bidder should have attained in the last five years i.e.2021-22 to 2025-26 achieved in at least one financial years a minimum financial turnover-Turnover certificate all classes of civil engineering construction works only Rs. 83.04 Lakhs
PWD Registration Certificate Class-3 & above
PAN & GST Certificate
Tenderer must have liquid assets and /or availability of credit facilities of not less than Rs. 24.92 Lakhs Credit lines/ letter of credit/certificates from banks for meeting the fund requirement etc. issued the Nationalised bank should be furnished by the contractor.
Bid capacity
Caste certificate
Domicile certificate
Ongoing work details most attached with self attested if false information submitted tender will be rejected
Postal Address with contact number
₹2,080
₹84,000
30 Apr 2026
23 Apr 2026
2 May 2026
29 Apr 2026
28 Apr 2026
Improvements to various Roads in Package 2 of Ranebennur Taluk Haveri District under Chief Ministers Infrastructure Development Program 75 percent Grant
Construction of Concrete Road and Drain on Both Sides from Beereshwar Temple to Aremallapur Road in medlari Village of Ranebennur Taluk Dismantling of cement concrete pavement by mechanical means usin...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layerswith motor grader on pr...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and laying 150 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay / slab etc. complete inc...
Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed dr...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Improvements to various Roads in Package 2 of Ranebennur Taluk Haveri District under Chief Ministers Infrastructure Development Program 75 percent Grant
Construction of Concrete Road from Pond to High School in Rahutanakatti Village of Ranebennur Taluk Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to piece...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layerswith motor grader on pr...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and laying 150 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay / slab etc. complete inc...
Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed dr...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Improvements to various Roads in Package 2 of Ranebennur Taluk Haveri District under Chief Ministers Infrastructure Development Program 75 percent Grant
Construction of Concrete Road and Drain on Both Sides from Hirebidri Road in Jantha Plot to Muanjunath Medleri House in Aremallapur Village of Ranebennur Taluk Dismantling of cement concrete pavement ...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layerswith motor grader on pr...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and laying 150 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay / slab etc. complete inc...
Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed dr...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Improvements to various Roads in Package 2 of Ranebennur Taluk Haveri District under Chief Ministers Infrastructure Development Program 75 percent Grant
Construction of Concrete Road from Ratihalli Road to Santepeti Road in Tuminkatti Village of Ranebennur Taluk Earth work in surface excavation by mechanical means for lowering & leveling the ground fo...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layerswith motor grader on pr...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and laying 150 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay / slab etc. complete inc...
Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed dr...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Improvements to various Roads in Package 2 of Ranebennur Taluk Haveri District under Chief Ministers Infrastructure Development Program 75 percent Grant
Construction of Concrete Road and Drain on Both Sides from Basavaraj Pujars House to Hanumantappa Doddamanis House in Antarvalli Village of Ranebennur Taluk Earth work in surface excavation by mechani...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layerswith motor grader on pr...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and laying 150 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay / slab etc. complete inc...
Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed dr...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Improvements to various Roads in Package 2 of Ranebennur Taluk Haveri District under Chief Ministers Infrastructure Development Program 75 percent Grant
Construction of Concrete Road and Drain on Both Sides from Durgamma Devi Temple to Ningappa Shiddaplavar House in Gangapur Village of Ranebennur Taluk Dismantling of cement concrete pavement by mechan...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layerswith motor grader on pr...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and laying 150 micron Low Density Polyethylene (LDPE) sheet confirming to IS 3395 : 1997 below concrete pavement including all materials and labour complete
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Cutting transverse contraction joints 3 to 4 mm wide and depth 60mm in concrete slab using concrete cutting machine with diamond studded saw within 4-8 hours of casting of bay / slab etc. complete inc...
Providing to contraction joints polysuphide sealent (Pouring grade) confirming to BS : 5212 - 1989 into sawed groove widened at top for sealent reservoir of specified size and shape as per detailed dr...
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to mee...
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever nec...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Providing and erecting direction and place identification retro reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick...
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vi...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
26300 Kw 3 Cat-1.doc
Tender Document • 0.21 MB
Download all tender documents and submit your bid