Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.1 L+₹7,498.26 (7.14%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.2 L+₹14,996.52 (14.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.2 L+₹16,331.21 (15.6%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹1.3 L+₹22,494.78 (21.4%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
22 Sept 2026, 4:00 pmClosed
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
C/O CULVERT NEAR H/O FAYAZ AH BHAT AND OTHERS AT W.NO. 1
2026_RDPR_324871_6
NIT93
Open Tender
Civil Works
Percentage
OFFICE OF EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹3,000
8 Oct 2026
17 Sept 2026
23 Sept 2026
17 Sept 2026
22 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in excavation by manual or mechanical means in all kinds of soils incl disposal of excavated earth in trenches, foundations, etc complete job. | 3.39 | Cum | 592 | ₹2,006.88 |
| 2 | P/L of dry stone solling handpacked incl ramming, watering, filling of interstices and carriage of materials involved . | 0.84 | Cum | 1,250 | ₹1,050 |
| 3 | P/L in position cement concrete of sp grade incl curing but excl the cost of centring and shuttering all works upto plinth level with a 1:4:8 mix. | 0.84 | Cum | 5,202 | ₹4,369.68 |
| 4 | P/L in position cement concrete of sp grade incl curing but excl the cost of centring and shuttering all works upto plinth level with a 1:2:4 mix. | 6.09 | Cum | 6,500 | ₹39,585 |
| 5 | P/L in position cement concrete of sp grade incl curing but excl the cost of centring and shuttering all works upto plinth level with a 1:3:6 mix. | 7.09 | Cum | 5,733.25 | ₹40,648.74 |
| 6 | Centring and shuttering incl strutting, propping, etc incl removal of formwork complete job. | 11.15 | Sqm | 286 | ₹3,188.9 |
| 7 | centring and shuttering of diff dimensions other than s.no. 6 | 8.36 | Sqm | 723.2 | ₹6,045.95 |
| 10 | Carriage of materials sand and agg | 12.02 | Cum | 505 | ₹6,070.1 |
| 11 | Providing and fixing of steel reinforcement | 400 | Kgs | 115 | ₹46,000 |
| 12 | P/F of CIB and Taking of photographs of size 125mm x200mm pre- execution, during execution and post completion including cleareance of site | 1 | Job | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1096576.xls
BOQ • 0.26 MB
CORRIGENDUM.pdf
PDF • 0.85 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .