Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹24,900
Closing Date
30 Jun 2022, 2:30 pmClosed
SE/SEDC/Salem
O/o.The Superintending Engineer, TANGEDCO, Kamaraj Nagar Colony, Udayapatty, Salem - 636014
Works Contract for Thirumanoor O-M Section Under RDSS Scheme in 22 KV Veppilaipatty Feeder
2022_EB_236383_1
SE/SEDC/WC.017/2022-23 DT.16.06.2022
Open Tender
Electrical Works
Works
180 days
Thirumanoor
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,900
7 Jul 2022
17 Jun 2022
1 Jul 2022
17 Jun 2022
30 Jun 2022
17 Jun 2022
Amount
EXCAVATION of POLE/STAY PIT PER Location
Excavation of pole pit upto 27" (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0mtr r Pole by using JCB or manual
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of poles.
RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
RCC poles/Metal poles above 8.0 mtr by using JCB or maual
Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or maual
Erection of stay set complete
FIXING OF CROSS ARMS:
HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Tapping Channel Cross arm
LT 3 phase cross arms
LT Single phase cross arms
HT /LT TI Fitttings
Fixing of Aluminium Knob
FIXING OF INSULATORS
Fixing of HT pin Insulators 22 KV
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
Paving of Conductor, stringing etc., complete with ACSR/ AAAC for both HT/LT lines.
ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
Concreting of poles:
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Earthing of Pole
Earthing of pole with coil earthing including burying looping and binding.
Painting
Painting of metal poles including cross arms (excluding cost of paint)
Numbering of pole with paint and with base painting.
Painting of RCC/PSC Poles (Colour Washing)
Guarding Arrangement
HT Guarding
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Transport of Materials Below 8 Kms (Plains)
Transport of Materials above 8 Kms For Additional KM (irrespective of weight in tonnage)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual above 100 m
Loading of poles upto 8.0 M/27"
Loading of poles above 8.0 M
Loading of metal poles (All sizes)
Unloading of poles upto 8.0 M/27"
Unloading of Poles above 8.0 M
Unloading of Metal Poles
Loading of materials
Unloading of materials
Loading or unloading of Transformer upto 100 KVA
Erection of New Transformer all capacities (with jumpering)
DT/ DP erection
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P Structure with AB Swiitch, Top Channel, Cross Bracing, Earthing, Painting, Providing Stay including Concreting
Dismantling
Dismantling - RCC poles/Metal poles upto 8.0 mtr by using JCB or maual
Dismantling -HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Dismantling -Tapping Channel Cross arm
Dismantling -HT/LT TI Fittings
Dismantling -22 KV HT Pin Insulator
Dismantling of HT 22 KV strain disc.
Dismantling -ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .