Loading…
Loading…
Tender Value
₹4.4 L
EMD Value
₹8,840
Closing Date
5 Aug 2026, 6:00 pm
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction of shamshan ghat at Chhanni Tana Pyt Bhalwal Mullo Block Pargwal Distt. Jammu under ABDP budget for the year of 2026-27.
2026_RDPR_317261_5
e-NIT No. 240 REWJ of 2026-27 dated 22-07-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹8,840
22 Jul 2026
22 Jul 2026
6 Aug 2026
22 Jul 2026
5 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour Engaged for General site clearance | 3 | labour | 553 | ₹1,659 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil. | 14.73 | cum | 479.3 | ₹7,060.09 |
| 3 | Providng and laying in position cement concrete of specified grade in excluding cost of centering, shuttering all work upto plinth level 1:5:10 (1 cement : 5 coarse sand : 10 graded crushed 40mm agg.) including all leads, lifts and carriages complete. | 1.99 | cum | 4,826.5 | ₹9,604.74 |
| 4 | Providng and laying in position cement concrete of specified grade in excluding cost of centering, shuttering all work upto plinth level 1:3:6 (1 cement : 3 fine sand : 6 graded crushed 20mm agg.) including all leads, lifts and carriages complete. | 6.71 | cum | 5,733.6 | ₹38,472.46 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.29 | cum | 7,788.4 | ₹41,200.64 |
| 6 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.87 | cum | 9,395.7 | ₹17,569.96 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering,finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.78 | cum | 9,821.85 | ₹76,413.99 |
| 8 | Reinforcement for RCC work incl. straightening, cutting, bending, placing in position and binding all complete indluding all leads, lifts and carriages complete | 1,194.98 | kg | 123.2 | ₹1,47,221.54 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for: columns etcconcreteFoundations, footings, bases of columns etc. | 51.86 | sqm | 742.55 | ₹38,508.64 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for beams. | 27.88 | sqm | 577.55 | ₹16,102.09 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_1038901.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].