Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2,220
Closing Date
9 May 2023, 2:00 pmClosed
EXECUTIVE ENGINEER O AND M GUDIYATHAM
EXECUTIVE ENGINEER O AND M GUDIYATHAM
IMPROVEMENT ESTIMATE FOR LINK LINE WORK FOR 2 NOS. NEW 11 KV K.MOTTOR FEEDER AND KATHIRKULAM FEEDER UNDER UDAY SCHEME PART IV AND V UNDER UDAY SCHEME IN RESPECT OF AE, O AND M, PAKKAM SECTION.
2023_EB_306336_1
02/2023-2024, DT.25-04-2023
Open Tender
Electrical Works
Works
EXECUTIVE ENGINEER O AND M GUDIYATHAM
TENDER NOTICE
2 documents required · 2 mandatory
₹0
₹2,220
12 May 2023
25 Apr 2023
10 May 2023
25 Apr 2023
9 May 2023
25 Apr 2023
Amount
Excavation of PSC pole 9.0 mtr pole pit by uing JCB or manual
Loading of PSC pole 9.0mtr length
UnLoading of PSC pole 9.0mtr length
Erection of PSC pole 9.0 mtr length pole by using Crane / Manual
Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.50 KM
Transportation of all types and sizes of poles and other associated materials from road side to pole pit and vice versa upto 5 KM
Concreting with 1:4:8 mix using 40 mm Jelly including curing ( Material + Labour). (ii) Sleeve Concreting.
Earthing of poles with GI wires 4 or 6 SWG by coil earthing.
Loading / Unloading of line materials
Transporting of Distribution Transformer/ Line materials from stores to office/site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Fixing of 11 KV Tapping Channel X arms
Fixing of 11 KV 'V' X arm 3.5 feet, 4.5 feet & 5.0 feet
Fixing of HT /LT TI fitting
Fixing of 11 KV Pin insulator with Pin
Fixing of 11 KV disc with metal parts
Loading of conductor
Unloading of conductor
Transporting of conductors of all sizes from road side to pit locations upto 1 km of conductor.
Paving and stringing of conductors of 7/4.09 mm ACSR or other equivalent conductor
Excavation of stay pit of 4.5' to 5' depth using JCB/Manual
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy shackle, Binding etc.,
Clearing of branches and trees with JCB
Manufacturing / Altering of clamps
Drilling of holes in the structure materials clamps, etc.,
E.P.F. @13.36 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .