Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.7 LAccepted-AOC 1 14 SUJAL MANSION B BLOCK BHANGWADI KALBADEVI ROAD MUMBAI 400 002 | MUMBAI | MAHARASHTRA | 400002 | L1 | Accepted-AOC Being Lowest Tenderer | |
| 2 | L2₹71.8 L+₹7.0 L (10.9%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L2 | Rejected-Finance Being other than Lowest Tenderer | |
| 3 | L3₹75.2 L+₹10.4 L (16.1%)Rejected-Finance BLOCK C 14 GROUND FLOOR PLOT 618 624 BHIVANDIWALA TERRACE JAGANNATH SHANKARSHETH MARG DHOBI TALAO NEAR KALBADEVI POST OFFICE MUMBAI 400002 | MUMBAI | MAHARASHTRA | 400002 | L3 | Rejected-Finance Being other than Lowest Tenderer | |
| 4 | L4₹79.7 L+₹15.0 L (23.1%)Rejected-Finance COLABA MUMBAI | L4 | Rejected-Finance Being other than Lowest Tenderer | |
| 5 | L5₹82.9 L+₹18.1 L (28.0%)Rejected-Finance | L5 | Rejected-Finance Being other than Lowest Tenderer |
Tender Value
₹94.7 L
EMD Value
₹1.9 L
Closing Date
25 May 2023, 6:55 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Lt Col Ng Rajesh Singh GE NW KUNJALI
GARRISON ENGINEER NW KUNJALI DR HOMI BHABHA ROAD NAVY NAGAR COLABA MUMBAI 400005
8931 MANNING AND OPERATION FOR MARINE MAINTENACE AT VARIOUS JETTIES AND CONNECTED ITEMS AT NAVAL DOCKYARD MUMBAI UNDER GE NW KUNJALI
2023_MES_591898_1
8931/E8
Open Tender
Civil Works
Item Rate
330 days
GE (NW) KUNJALI
ALL AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) KUNJALI
₹1.9 L
Yes
22 Oct 2023
28 Apr 2023
27 May 2023
4 May 2023
25 May 2023
11 May 2023
28 Apr 2023 - 4 May 2023
Amount
Manning and operation including attending brakedowns of HT/LT network at various jetties , including cassions sub stations 6.6 KV/433 volts with 6.6 KV incoming from MRSS/INSS sub station and consisting of various sub stations and frequency convertor , transformers, HT/LT braker, LT capacitor bank, battery chargers, LT panels, APFC panels, COPE points, distribution panels, including internal lighting/ventilention of the sub stations and manning duty round the clock in three shifts by skilled operator having minimum 3 years experince in electrical, mechanical and external electrification. carryout of maning duties by deploying the under mentioned manpower in three shifts incl Sunday/Holidays:- Skilled Electrician -6 Nos. Shift timings above are as under:- (a) First shift: 0600 hr to 1400 hr (b) Second shift: 1400 hr to 2200 hr (c) Third shift: 2200 hr to 0600 hr
Manning and operation including attending brakedowns of HT/LT network at various jetties , including sub stations 6.6 KV/433 volts with 6.6 KV incoming from MRSS/INSS sub station and consisting of various sub stations and frequency convertor , transformers, HT/LT braker, LT capacitor bank, battery chargers, LT panels, APFC panels, COPE points, distribution panels, including internal lighting/ventilention of the sub stations and manning duty round the clock in three shifts by skilled operator having minimum 3 years experince in electrical, mechanical and external electrification. carryout of maning duties by deploying the under mentioned manpower in three shifts incl Sunday/Holidays:- Mate electrician - 18 Nos. Notes :- (i) Mate electrician must have passed matriculation with minimum two years experience in the trade. Shift timings of above are as under:- (a) First shift: 0600 hr to 1400 hr (b) Second shift: 1400 hr to 2200 hr (c) Third shift: 2200 hr to 0600 hr NOTE FOR ITEM NO.1 & 2: The duty for each shift at various substations located inside Naval Dockyard area as directed by Engineer -in-Charge.
Manning and operation including attending brakedowns of water supply installation / sewage pump house at various water supply installations/sewage pump house at Naval Dockyard are as under : 1. CASSION no.1 & No.2 at SBW jetty, 2. SOUTH WHARF pump house, . Fresh water supply line incoming from BMC , and sewage line to BMC main sewage pipeline and various other installations,and manning duty round the clock in three shifts by skilled operator having minimum 3 years experince in FGM/pump opeartion. carryout of maning duties by deploying the under mentioned manpower in three shifts incl Sunday/Holidays:- FGM - 2 Nos. Notes :- (i) Mate electrician must have passed matriculation with minimum two years experience in the trade. Shift timings of above are as under:- (a) First shift: 0600 hr to 1400 hr (b) Second shift: 1400 hr to 2200 hr (c) Third shift: 2200 hr to 0600 hr
M & L for Flex board for Main receiving station and all 11/6.6kV distribution substations alongwith their fixing arrangement all as specified and as directed.
M & L of the PVC board of appropriate size and thickness duly pasted with computerised letter mentioning " NO SMOKING" , " DANGER 11000 volts with skull and cross painted, " NO ADMISSION EXCEPT ON DUTY, " SM/MES NO." for the transformer/HT breakers/DG sets including accessories etc for the substations including accessories for properly fixing the same on wall/fencing/pole all as directed.
Supply of JEF ECO SAFE Maintenance Free Grounding Solution set comprising of High tensile low carbon steel rod of 3 Mts length & 25 mm dia with 250 micron ( average ) molecularly bonded copper on the outer surface to confirm with requirements of UL467 along with Back-fill compound strictly be a Carbon based conductive concrete type which has a resistivity of less than 0.12 Ohm Mtr as per Clause 14.5D of IEEE : 80 standard. Back-fill compound should be electronically conductive ( Like in metals ) and should not depend on moisture for conduction. JEF Powerfill Loresco compound shall be supplied in 50 Pound Bag. ( 1 Bag of 50 Pounds required per earthing set). Back-fill comound should be environment friendly, should solidify when mixed with water and set like concrete and should not leach / diffuse into the ground. A suitable earth terminaton clamp should also be supplied along with the set Note : Back-fill compund shall not be mixed with any soil while pouring in the bore hole.
Shree Ayyappa Engineering
AGRAWAL ASSOCIATES
Veer High Tech Solution
NOEL ENGINEERS
M/s S.D Construction Co
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .