| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC | ₹1.1 Cr | 1 | Accepted-AOC Qualified |
| 2 | 2₹1.1 Cr+₹1,136.30 (0.01%)Rejected-Finance | ₹1.1 Cr+₹1,136.30 (0.01%) | 2 | Rejected-Finance Not Qualified Highest Rate |
| 3 | 3₹1.1 Cr+₹2.8 L (2.56%)Rejected-Finance | ₹1.1 Cr+₹2.8 L (2.56%) | 3 | Rejected-Finance Not Qualified Highest Rate |
Tender Value
₹1.3 Cr
EMD Value
₹1.3 L
Closing Date
7 Nov 2024, 3:00 pmClosed
Executive Officer
EXECUTIVE OFFICER THIRUKALUKUNDRAM TOWN PANCHAYAT CHENGALPATTU DISTRICT
Strengthening of BT Road at Ward no 04 at Annai Sathya Nagar Earikarai Street and Ward No 18 Veeranam to Mangalam road in Thirukalaukundarm Town Panchayat.Chengalpattu District.
2024_DTP_498559_1
546/2023 NABARD RIDF XXX 2024-2025 BT ROAD TKM TP
Open Tender
Civil Works - Roads
Works
90 days
Thirukalukundram Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.3 L
Yes
Thirukalukundram TownPanchayat
5 Dec 2024
5 Nov 2024
7 Nov 2024
5 Nov 2024
7 Nov 2024
5 Nov 2024
5 Nov 2024
Amount
Providing and laying Tack Coat over WBM/ WMM Surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher /9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5
Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50 mm graded metal and 0.17 cum of 9.50-2.36 mm graded metal and 0.26 cum of 2.36 mm & below metal with 45.27 kgs of 60/70 bitumen & 5.03Kg of Plastic waste (Total-50.30 kg) and for premixing per 10 sqm including cost and conveyance of all materials to C M P site, heating the bitumen and agregates to required temperature and mixing them in required temperature in central hot mix plant 20- 30 tonnes capacity conveying the mix by tipper trucks to paver site, spreading the mix in required temperature for uniform thickness of 40mm / 30mm with mechanical paver to the specified grades and cross sections and compaction by Vibratory roller to the required density etc., including labour charges for loading bitumen in to bitumen tank and metal to feeder unit,labour for attending to paver site etc., including hire charges and fuel charges for 20-30t C M P with bitumen boiler,tipper trucks, paver finisher, Vibratory rollers and all other tools and plants required,including all other incidental charges etc.,complete using C M P clause 507 of MORTH Rev-5 specifications.
Providing and Laying of Hot applied Thermoplastic Compound 12.5 mm thick including refelectorising glass beads @250 gms per sqmm area thickness of 2.5 mm is exclusive of surface applied glass as per IRC:35 the estimated finished surface to be level,Uniform and fre from steaks and holes etc.,Complete as per MORTH&H Specification NO 803.
Supplying and fixing of refelective road studs of Catecarory A Raised pavement markers made out of carbonate/Moulded body and refelective steel with micro prismatic lens capable of providing total internal refelection of the light catering the lense face with retro refelectance and promoticcity values shall be as given in the detailed specifications and the product shall confirm to ASTM D4280 and fixed to the road Conditions of ASTM D4280 and fixed to the road surface using the adhesive recommended by the manufacturer.The refelective raised pavement markers shall also confirmed to the MORTH circular No RW/NH 33203/10/97-DO.III and length ,height and width of the body shall not be less than 100 mm ,15mm and 90 mm and base of marker shall be flat within 1.3 mm and outtermost faces of Configuration of marker shall not deviate more than 1.3 mm from a flat surface.the marker shall supported a load of 13635kg tested in accordance with ASTM D4280.Lenses shall be moulded of Polycarbonate or methyl methecrykate confirming to ASTM D788 The area of each retro refelectory Complete as per MORTH&H Specification NO 803.
MAINTANANCE Towards the charges for routine maintance of the road work executed under NABARD SCHEME including dressing of berms by refiiling the gully with the earth from borrow pits.,Cleaning of wild seasonal groeth desilting of side drains and CD Works., White Wasing guard stones painting of KM., HM Stones parapets Cutting of Branches of trees Refixing displaced guard stones caution boards speed limit boards etc., with the Periodicity for the abouve activities as Prescribeed in IRC SP 20-2002 AND AS DIRECTED BY THE DEPARTMENTAL OFFICERS EXCEPT FOR THE Contractor OWN Cost. Clearing and Gurbbing by Light Jungle Removing and Disposting of all materials such as bushes,Shurbs,Stumbs,Roots,Grss,Weeds,top organic Soil not etc., Compl;ete as per MORTH Specification 111,112,201 Up Keeping 1st Year(50%)
Up Keeping 2nd Year(60%)
Up Keeping 3rd Year(60%)
Up Keeping 4th t Year(60%)
Up Keeping 5th Year(60%)
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 A Up Keeping 1st Year(40%)
Up Keeping 2nd Year(40%)
Up Keeping 3rd Year(40%)
Up Keeping 4th t Year(40%)
Up Keeping 5th Year(40%)
Tack Coat - Providing and applying tack coat with emulsion (RS-1 Type) using emulsion pressure distributer at the rate of 0.2 kg/sqm on the prepared bitmious/Granular surface cleaned with maechanical broom as per clause 503 4th Year 3%
5th year 5%
4th Year 3%
5th year 5%
Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher /9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 4th Year 3%
5th year 5%
4th Year 3%
5th year 5%
KEERTHINATHAN (BID ID -1179461)
N.NATARAJAN (BID ID -1180518)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .