| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹1.5 L (1.21%)Rejected-Finance | ₹1.3 Cr+₹1.5 L (1.21%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.3 Cr+₹9.3 L (7.54%)Rejected-Finance | ₹1.3 Cr+₹9.3 L (7.54%) | L3 | Rejected-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical C 114 SECTOR 9 NOIDA GAUTAM BUDH NAGAR UP PIN 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S SINGH CONTRACTOR L3 | GOMATINETRA CONSTRUCTIONS L1 | mamber singh L2 |
|---|---|---|---|---|---|---|
| 1.00 | Uprooting of jhoonds inclunding cutting of roots , removed from site , stacking as directed and disposal outside the canal i/c cost of all labour , T&P etc. complete as per direction of Engineer in - Charge. | 245 | NOS | 800 ₹1,96,000 | 20 ₹4,900 Lowest | 30 ₹7,350 |
| 2.00 | Cleaning thick bushes and thorny Jungle without uprooting ,disposal outside the canal i/c cost of all labour T&P etc complete as per direction of Engineer in - Charge. | 1,608 | SQM | 4.5 ₹7,236 | 2 ₹3,216 Lowest | 4.4 ₹7,075.2 |
| 3.00 | Earth work in foundation in all types of soil including all lift and all lead also including back filling, watering and ramming of excavated earth in to the trenches or in to the space between the surface and the sides of foundation trenches or in to the plinth with removal and disposal of surplus earth as per direction of the engineer-in-charge. | 1,305.64 | CUM | 168 ₹2,19,347.52 | 50 ₹65,282 Lowest | 70 ₹91,394.8 |
| 4.00 | Providing&dumping 20-40 Kgs. Boulder in Launching Apron of floor of X- Regulator with all lead including all cost of material, Labour and T&P etc. complete. | 180.37 | CUM | 2,929 ₹5,28,303.73 | 2,100 ₹3,78,777 Lowest | 2,800 ₹5,05,036 |
| 5.00 | Providing & laying 15 cm thick stone aggregate, graded filter (10mm -25mm) size Below C.C .Block in side slope of Canal i/c all cost of material,Labour and T&P etc. complete. | 98.48 | CUM | 2,929 ₹2,88,447.92 | 1,800 ₹1,77,264 Lowest | 2,200 ₹2,16,656 |
| 6.00 | Ordinary Centering and shuttering of cement concrete work including Rent of Shuttering material, labour and T & P required for proper completion of the work for slab ,lintels ,sun shades,columns & walls etc complete. | 2,623.47 | SQM | 565 ₹14,82,260.55 | 550 ₹14,42,908.5 Lowest | 600 ₹15,74,082 |
| 7.00 | Providing & laying Cement Concrete A40M10 (1:3:6) i/c all cost of material, labour and T&P etc complete. | 192.68 | CUM | 4,603 ₹8,86,906.04 | 4,000 ₹7,70,720 Lowest | 5,200 ₹10,01,936 |
| 8.00 | Providing & laying Precast Cement Concrete Tiles (A-20,M-20) (1:1.5:3) of size 0.6MX0.6X0.15M on canal side slope with proper prepration of sub surface i/c all cost of material, labour and T&P etc complete. as per direction of Engineer in charge. | 188.95 | CUM | 5,355 ₹10,11,827.25 | 5,000 ₹9,44,750 Lowest | 5,800 ₹10,95,910 |
| 9.00 | Earthwork in filling for Strenghthening of banks i/c excavation , loading , unloading , carriage up to 195 m lead and 1.50 m lift i/c laying , in 20 cm layers , ramming ,dressing to required section and proper completion of work as per direction of Engineer in - Charge . | 6,961.21 | CUM | 168 ₹11,69,483.28 | 120 ₹8,35,345.2 | 55 ₹3,82,866.55 Lowest |
| 10.00 | Providing & laying RCC A20 M25 (1:1:2) i/c all cost of material, labour and T&P etc complete . | 287.96 | CUM | 6,194 ₹17,83,624.24 Lowest | 7,000 ₹20,15,720 | 7,000 ₹20,15,720 |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
12 Sept 2025, 3:00 pmClosed
SE 1ST IWC MEERUT
SE OFFICE 1ST IWC MEERUT
As per the NIT
2025_UPIDC_1068184_11
02/SE-1/2025-26
Open Tender
Civil Works
Piece-work
180 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹3.2 L
SE OFFICE 1ST IWC MEERUT
26 Oct 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
12 Sept 2025
3 Sept 2025
10 Sept 2025
Amount
Uprooting of jhoonds inclunding cutting of roots , removed from site , stacking as directed and disposal outside the canal i/c cost of all labour , T&P etc. complete as per direction of Engineer in - Charge.
Cleaning thick bushes and thorny Jungle without uprooting ,disposal outside the canal i/c cost of all labour T&P etc complete as per direction of Engineer in - Charge.
Earth work in foundation in all types of soil including all lift and all lead also including back filling, watering and ramming of excavated earth in to the trenches or in to the space between the surface and the sides of foundation trenches or in to the plinth with removal and disposal of surplus earth as per direction of the engineer-in-charge.
Providing&dumping 20-40 Kgs. Boulder in Launching Apron of floor of X- Regulator with all lead including all cost of material, Labour and T&P etc. complete.
Providing & laying 15 cm thick stone aggregate, graded filter (10mm -25mm) size Below C.C .Block in side slope of Canal i/c all cost of material,Labour and T&P etc. complete.
Ordinary Centering and shuttering of cement concrete work including Rent of Shuttering material, labour and T & P required for proper completion of the work for slab ,lintels ,sun shades,columns & walls etc complete.
Providing & laying Cement Concrete A40M10 (1:3:6) i/c all cost of material, labour and T&P etc complete.
Providing & laying Precast Cement Concrete Tiles (A-20,M-20) (1:1.5:3) of size 0.6MX0.6X0.15M on canal side slope with proper prepration of sub surface i/c all cost of material, labour and T&P etc complete. as per direction of Engineer in charge.
Earthwork in filling for Strenghthening of banks i/c excavation , loading , unloading , carriage up to 195 m lead and 1.50 m lift i/c laying , in 20 cm layers , ramming ,dressing to required section and proper completion of work as per direction of Engineer in - Charge .
Providing & laying RCC A20 M25 (1:1:2) i/c all cost of material, labour and T&P etc complete .
Providing & fixing Steel Reinforcement including cost of steel, binding wire, bending, binding welding, cutting, placing in proper position i/c all cost of material, labour and T&P etc. complete .
1st class (M-150) brick work with 1:4 cement mortar with cost of all material, labour and T&P etc complete .
Single brick lining laid flat over 12 mm thick 1:4 cement mortar i/c all cost of material, labour and T&P etc. complete.
Providing Cement pointing (Struck Deep) on brick masonary in 1:3 Cement Mortar including cost of all material, labour and T&P etc complete .
Dismantling bricks or stone masonry in lime or cement including stacking of material within 60 Meters.
Dismantling C.C. floor including base concrete and including stacking of dismantled material with 60 m distance.
Supply & laying of 80 mm thick precast cement concrete I shape interlocking paver block ISI 15658-2006 with top layer of minimum 5 mm thickness having plan dimension 220x(160+120mm) of o.p cement smooth high gloss finish skid resistant manufactured from rubber moulds through vibro- compression mechanism .the compressive strength of concrete paver block shall not be less than 40MPA and weight 4.5KG. per Including cost of material with a blanket layer of 4.00cm. thick fine sand including labour t&p etc. required for proper completion of the work as per engg. in charge.
Dismantling Existing plaster including disposal of refuse with in distance of 60 M.
Providing Cement plaster on brick masonary in 1:3 Cement Mortar including cost of all material, labour and T&P etc complete .
Greasing oiling of component of lifting mechanism of gates (excluding roller) after proper cleaning with replacing Grease cup/Grease Nipple as required including cost of all material, labour, and T & P etc. required for proper completion of work.
Replacing of bottom rubber seal as per IS code 11855 by removing old damaged side rubber seal from gate, scrapping and cleaning surface, making holes, fixing and clamping the M.S plate by new counters sunk head high tensile bolts , nuts and washer, making adjustment as per requirement of site including cost of all material, labour and T&P etc required for proper completion of work. for size 80x20 mm.
Painting of gates and appurtenances by applying 1 coat of red oxide zinc chromate primer and 2 coat of high build black bituminous paint of standard make after proper cleaning, scrapping the surface including cost of all material, labour, T & P and scaffolding bridges with proper safety arrangement as required for proper completion of work.
Painting of superstructure of gate by applying 1 coat of red oxide zinc chromate primer and 2 coat of high glass synthetic enamel phiroza blue paint of standard make after proper cleaning, scrapping the surface including cost of all material, labour, T & P and scaffolding bridges with proper safety arrangement as required for proper completion of work.
Painting gauge including cost of material upto 25 cm width .
Painting letters including cost of material for writing chainage on Regulator including all cost of materials, labour and T&P etc. complete .
Provinding and laying brick on edge soling including all cost of material , labour and T&P etc. complete.
Provinding , laying and packing of stone boulder weighing between 20 kg to 40 kg in wire crate of size (3.00 x1.50 x1.00 ) M i/c all cost of stone boulder , labour, and T&P etc Complete as per direction of Engineer in - Charge .
Supplying of 8 SWG , G.I . Wire crate size ( 3.00x1.50x1.00) M i/c weaving Charges , carriage up to site placing at the proper position having square mesh of 15 cm x 15 cm double knotted i/c all cost of material, labour,and T&P etc Complete .
Surface dewatering inclunding removed of rain water /seepage / water accumulation by pumps or other means during excavation of earthwork to keep the site dry for excavation , proper disposal of water away from site, i/c rent of pumps and cost of labour ,fuel,pipes etc complete as per direction of Engineer in - Charge.
Providing and fixing P.V.C. pipe 75mm dia & 6Kg./cm Sq. I.S.I. Mark including all cost of materials, labour and T&P etc complete.
Providing & laying Cement concrete (A-20,M-15) (1:2:4) i/c all cost of material, labour and T&P etc complete.
Finishing wall with water proof cement paint of approved make and quality on new work with two coat to give an even shade including supplying of all materials, labour, and T& P etc. required for proper completion of the work.
Providing & laying RCC (A-20,M-20) (1:1.5:3) i/c all cost of material, labour and T&P etc complete .
Providing & laying 1:2 cement mortar in C.C. block (tile) on canal side slope including cost of all material, labour and T&P etc complete .
mamber singh (BID ID -5529548)
M/S SINGH CONTRACTOR (BID ID -5530265)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .