| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L1 | Accepted-AOC L1-Accepted | |
| 2 | L2₹4.6 L+₹4,415.62 (0.96%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹4.7 L+₹7,136.50 (1.56%)Rejected-Finance FD 85 SALT LAKE CITY SECTOR III KOLKATA 700 091 W B | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | L3 | Rejected-Finance Higher than L1 | |
| 4 | L4₹4.7 L+₹9,547.51 (2.08%)Rejected-Finance 19 A NIRUPAMA DEVI ROAD LANE 1 BERHAMPORE MURSHIDABAD | BERHAMPORE | MURSHIDABAD | L4 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | M/S. Sajahan Chowdhury L4 | EASTERN INDIA SALES AND SERVICE L1 | WEST BENGAL ENGINEERING CO. L2 | ELECTRICAL AND MECHANICAL ENGINEERING CORPORATION L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Bailing out the old caustic solution from the neutralizaqtion pit and damaged diffuser pipe and through cleaning and washing the pit after taking out the cover. | 1 | Item | 1,273 ₹1,273 | 1,248 ₹1,248 Lowest | 1,260 ₹1,260 | 1,267 ₹1,267 |
| 2.00 | Supply and delivery of 150 mm dia diffuser pipe made of uPVC pipe having perforation of not more than 17 mm. (make- Evoqua/Capital Control or other approved) | 1 | No. | 52,923 ₹52,923 | 51,885 ₹51,885 Lowest | 52,404 ₹52,404 | 52,663 ₹52,663 |
| 3.00 | Making MS stand for diffuser pipe with 50 x 50 x 6 MS equal angle of 3.5 mtr long by cutting, welding fabrication all complete (Size of stand is 275 x 275 x 500 mm) | 2 | Nos. | 3,034 ₹6,068 | 2,975 ₹5,950 Lowest | 3,005 ₹6,010 | 3,020 ₹6,040 |
| 4.00 | Fitting fixing the diffuser stand on the floor of neutralization pit by MS fastner and applying FRP lining of 3 mm thick on the diffuser stand. | 1 | Item | 10,690 ₹10,690 | 10,480 ₹10,480 Lowest | 10,585 ₹10,585 | 10,744 ₹10,744 |
| 5.00 | Supply and delivery of Double wall corrugated (with external annular corrugation and smooth internal walls) High Density Polyehelene 150 mm PVC corruguated Pipes including necessary joiniting materials. | 40 | mtr | 2,351 ₹94,040 | 2,305 ₹92,200 Lowest | 2,328 ₹93,120 | 2,340 ₹93,600 |
| 6.00 | Taking out the damaged corruguated hose and laying the hose in three parts with required 150 mm dia jubilee clamp ( 8 Nos) including fitting fixing with the FRP hood outlet to Blower and blower to diffuser pipe after modification of copper flexible pipe entry by cutting 1" x 2'-6" all complete as per direction of EIC. | 1 | Item | 3,850 ₹3,850 | 3,775 ₹3,775 Lowest | 3,813 ₹3,813 | 3,832 ₹3,832 |
| 7.00 | Carrying stand by full hood from Niyamatpur site to Balupur site including loading and unloading and placing the hood on stand by toner and complete the leakage gas outlet by flexible corruguated hose all complete as per direction of EIC. | 1 | Item | 3,309 ₹3,309 | 3,244 ₹3,244 Lowest | 3,276 ₹3,276 | 3,293 ₹3,293 |
| 8.00 | Dismantling the existing blower and servicing the same and fitting, fixing the taken out motor with the blower maintaing alignment with new 3 nos. Drive belt B2180/B82 including adjusting proper belt tension and re-connection of cable after taking out from underground by demolishing the floor for extending the cable for proper re-connection all complete as per direction of EIC. | 1 | Item | 8,653 ₹8,653 | 8,483 ₹8,483 Lowest | 8,568 ₹8,568 | 8,610 ₹8,610 |
| 9.00 | Painting the blower cover and its base by anticorrosive paint ( 2 coats) of approved shade. | 1 | Item | 764 ₹764 | 749 ₹749 Lowest | 756 ₹756 | 760 ₹760 |
| 10.00 | Supply ,delivery and pouring Caustic flakes in form of solution within neutralistaion pit of approved quality | 1,200 | Kg | 165 ₹1,98,000 | 161.5 ₹1,93,800 Lowest | 163 ₹1,95,600 | 164 ₹1,96,800 |
Tender Value
₹4.7 L
EMD Value
₹9,395
Closing Date
19 Sept 2022, 2:30 pmClosed
EXECUTIVE ENGINEER, MALDA MECHANICAL DIVISION,PHED
Office of the Executive Engineer, Malda Mechanical Division,P.H.E.Dte.Doulatpur PHE Complex, Maliha,Malda-732102
Rectification and renovation of Neutralization System at Balupur Water Treatment Plant under Malda Mechanical Division, PHE Dte.
2022_PHED_402820_3
WBPHED/EE/MLMD/NIeT_11 of 2022-2023
Open Tender
Electrical Work/ Equipment
Item Rate
21 days
Doulatpur PHE complex, P.O. Maliha, Dist. Malda
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,395
Yes
19 Dec 2025
12 Sept 2022
21 Sept 2022
12 Sept 2022
19 Sept 2022
12 Sept 2022
Amount
Bailing out the old caustic solution from the neutralizaqtion pit and damaged diffuser pipe and through cleaning and washing the pit after taking out the cover.
Supply and delivery of 150 mm dia diffuser pipe made of uPVC pipe having perforation of not more than 17 mm. (make- Evoqua/Capital Control or other approved)
Making MS stand for diffuser pipe with 50 x 50 x 6 MS equal angle of 3.5 mtr long by cutting, welding fabrication all complete (Size of stand is 275 x 275 x 500 mm)
Fitting fixing the diffuser stand on the floor of neutralization pit by MS fastner and applying FRP lining of 3 mm thick on the diffuser stand.
Supply and delivery of Double wall corrugated (with external annular corrugation and smooth internal walls) High Density Polyehelene 150 mm PVC corruguated Pipes including necessary joiniting materials.
Taking out the damaged corruguated hose and laying the hose in three parts with required 150 mm dia jubilee clamp ( 8 Nos) including fitting fixing with the FRP hood outlet to Blower and blower to diffuser pipe after modification of copper flexible pipe entry by cutting 1" x 2'-6" all complete as per direction of EIC.
Carrying stand by full hood from Niyamatpur site to Balupur site including loading and unloading and placing the hood on stand by toner and complete the leakage gas outlet by flexible corruguated hose all complete as per direction of EIC.
Dismantling the existing blower and servicing the same and fitting, fixing the taken out motor with the blower maintaing alignment with new 3 nos. Drive belt B2180/B82 including adjusting proper belt tension and re-connection of cable after taking out from underground by demolishing the floor for extending the cable for proper re-connection all complete as per direction of EIC.
Painting the blower cover and its base by anticorrosive paint ( 2 coats) of approved shade.
Supply ,delivery and pouring Caustic flakes in form of solution within neutralistaion pit of approved quality
Supply and delivery the following spares at Debipur OHR site:-
1" Double Union type PVC ball valve
1" PVC NRV
1" PVC MABT
1" PVC FABT
Fitting, fixing the sapres as mentioned in Sl. No. 11.01 to 11.04 to restore the water leakages within the existing gaseous chlorination arrangement.
MAKE AS PER DEPARTMENTAL APPROVED VENDOR LIST CIRCULATED VIDE MEMO NO.PHE/IV/2277/W-181/19 DATED- 25/09/2019
Add GST @ 18%
Add Cess @ 1%
WEST BENGAL ENGINEERING CO.
ELECTRICAL AND MECHANICAL ENGINEERING CORPORATION
M/S. Sajahan Chowdhury
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .