Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.7 L
EMD Value
₹7,450
Closing Date
1 Dec 2026, 6:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Nodal Officer (Tender)
O/o Sr. Chief Engineer (Civil), BSNL MP Civil Zone Block-C, BDA Flats, First Floor, Vidya Nagar, Behind Petrol Pump Hoshangabad Road, Bhopal (MP) - 462026
Demolishing and reconstruction of the damaged compound wall, repairing of leakage from roof of TE building at Agar and Salyakhedi and repairing of choked sewer line at Agar TE in Shajapur OA in Ujjain BA
2026_BSNL_298776_1
NIT No 22/EE/DIV/IND/2026-27
Open Tender
Civil Works
Item Rate
60 days
Shajapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Accounts Officer Cash Oo GMTD BA Ujjain
₹7,450
23 Nov 2026
23 Nov 2026
3 Dec 2026
23 Nov 2026
1 Dec 2026
23 Nov 2026
60 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 3 | One Cubic Metre | - | - |
| 2 | Extra for cutting reinforcement bars manually / by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. | 4 | One Square Metre | - | - |
| 3 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. | 100 | One Kilogram | - | - |
| 4Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | |||||
| 4.1 | In cement mortar | 5 | One Cubic Metre | - | - |
| 5Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured): | |||||
| 5.1 | From brick work in cement mortar | 2.25 | Units | - | - |
| 6Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 6.1 | All kinds of soil. | 7 | One Cubic Metre | - | - |
| 7Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : (a) All kinds of soil | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_347961.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .