Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.6 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹6.4 L+₹79,971.20 (14.2%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹7.0 L+₹1.3 L (23.9%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹7.6 L+₹2.0 L (35.3%)Rejected-AOC DHALIWAL | 4 | Rejected-AOC L4 |
Tender Value
₹6.0 L
EMD Value
₹14,895
Closing Date
6 Jul 2023, 5:00 pmClosed
Commissioner
MC Solan
Construction of Parking and path in front of Entry Gate I of Jawahar Park in ward no 6.
2023_UDDHP_75578_1
4704-06 dt. 17.06.2023
Open Tender
Civil Works
Item Rate
60 days
MC Solan
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
Commissioner
₹14,895
10 Jan 2025
28 Jun 2023
7 Jul 2023
28 Jun 2023
6 Jul 2023
28 Jun 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Suspended floors, roofs, landings, balconies and access platform
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size)
Karanjeet Singh
Nitin Bhasin
Nitin Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .