| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-Finance | ₹8.2 L | L1 | Accepted-Finance Qualified |
| 2 | L2₹8.2 L+₹7,088 (0.87%)Accepted-Finance | ₹8.2 L+₹7,088 (0.87%) | L2 | Accepted-Finance Qualified |
| 3 | L3₹8.8 L+₹61,240 (7.50%)Accepted-Finance | ₹8.8 L+₹61,240 (7.50%) | L3 | Accepted-Finance Qualified |
| 4 | L4₹8.8 L+₹63,632.70 (7.79%)Accepted-Finance | ₹8.8 L+₹63,632.70 (7.79%) | L4 | Accepted-Finance Qualified |
| 5 | L5₹9.2 L+₹1.0 L (12.5%)Accepted-Finance | ₹9.2 L+₹1.0 L (12.5%) | L5 | Accepted-Finance Qualified |
| Sl No | Description | Qty | Unit | M/S KHAN ELECTRICAL ENTERPRISES L10 | M/S HILAL ENTERPRISES L4 | M/s NEW DAR ELECTRICALS L9 | M/S SOFI SONS L3 | ELEVEES INFRASTRUCTURE PRIVATE LIMITED L1 | M/S DAR ELECTRICALS L13 | SHARK CONSTRUCTIONS ELECTRICAL MECHANICAL ENGINEERS SUPPLIERS L2 | FAYAZ AHMAD DAR L7 | MOHD SHAFI YATOO L11 | M/S SHAKEEL RAJA L14 | GUROO ELECTRICALS L8 | IRSHAD AHMAD LONE L12 | southern L5 | mohd yousuf wani L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply, Installation,testing & commissioning of 100 kVA,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate | 1 | No | 2,05,000 ₹2,05,000 | 1,85,999 ₹1,85,999 | 1,99,000 ₹1,99,000 | 1,90,000 ₹1,90,000 | 2,00,000 ₹2,00,000 | 1,98,000 ₹1,98,000 | 1,65,000 ₹1,65,000 Lowest | 1,87,400 ₹1,87,400 | 2,15,000 ₹2,15,000 | 1,79,000 ₹1,79,000 | 2,01,000 ₹2,01,000 | 2,20,000 ₹2,20,000 | 1,90,000 ₹1,90,000 | 1,95,000 ₹1,95,000 |
| 2.00 | Supply, Installation,testing & commissioning of 9 Mtr. Long Pole ( ST-410 SP33) | 14 | No | 18,000 ₹2,52,000 | 16,999 ₹2,37,986 | 19,500 ₹2,73,000 | 17,000 ₹2,38,000 | 16,500 ₹2,31,000 | 18,000 ₹2,52,000 | 18,111 ₹2,53,554 | 17,000 ₹2,38,000 | 18,500 ₹2,59,000 | 17,900 ₹2,50,600 | 17,800 ₹2,49,200 | 16,700 ₹2,33,800 | 18,000 ₹2,52,000 | 16,000 ₹2,24,000 Lowest |
| 3.00 | Supply, Installation,testing & commissioning of ST poles 8m long ST-540 SP -15 with base plate & cap | 4 | No | 15,500 ₹62,000 | 12,999 ₹51,996 | 14,900 ₹59,600 | 12,500 ₹50,000 | 13,000 ₹52,000 | 13,000 ₹52,000 | 13,511 ₹54,044 | 13,400 ₹53,600 | 15,500 ₹62,000 | 13,900 ₹55,600 | 12,000 ₹48,000 Lowest | 12,800 ₹51,200 | 15,000 ₹60,000 | 12,000 ₹48,000 Lowest |
| 4.00 | Supply, Laying,testing, stringing, tensioning and binding of conductor 50 mm² ACSR Conductor (Rabbit) | 1.3 | Km | 55,000 ₹71,500 | 49,999 ₹64,998.7 Lowest | 54,000 ₹70,200 | 60,000 ₹78,000 | 50,000 ₹65,000 | 55,000 ₹71,500 | 55,000 ₹71,500 | 53,400 ₹69,420 | 59,900 ₹77,870 | 65,000 ₹84,500 | 55,000 ₹71,500 | 58,000 ₹75,400 | 60,000 ₹78,000 | 60,000 ₹78,000 |
| 5.00 | Supply, Installation,testing & commissioning of LT Distribution Box for 100 kVA DTR with 160 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits | 1 | No | 26,000 ₹26,000 | 25,999 ₹25,999 | 29,000 ₹29,000 | 31,500 ₹31,500 | 7,000 ₹7,000 Lowest | 35,000 ₹35,000 | 20,000 ₹20,000 | 33,400 ₹33,400 | 30,000 ₹30,000 | 59,000 ₹59,000 | 35,000 ₹35,000 | 30,000 ₹30,000 | 51,000 ₹51,000 | 12,000 ₹12,000 |
| 6.00 | Supply, Installation,testing & commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type | 1 | Set | 2,500 ₹2,500 | 2,599 ₹2,599 | 3,300 ₹3,300 | 3,000 ₹3,000 | 4,000 ₹4,000 | 3,500 ₹3,500 | 2,800 ₹2,800 | 2,800 ₹2,800 | 4,500 ₹4,500 | 7,890 ₹7,890 | 2,000 ₹2,000 Lowest | 3,200 ₹3,200 | 4,000 ₹4,000 | 9,000 ₹9,000 |
| 7.00 | Supply, Installation,testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type | 1 | Set | 12,000 ₹12,000 | 8,999 ₹8,999 | 10,900 ₹10,900 | 10,000 ₹10,000 | 12,000 ₹12,000 | 13,000 ₹13,000 | 5,500 ₹5,500 | 10,450 ₹10,450 | 10,000 ₹10,000 | 10,900 ₹10,900 | 11,000 ₹11,000 | 13,000 ₹13,000 | 12,000 ₹12,000 | 2,000 ₹2,000 Lowest |
| 8.00 | Supply, Installation,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A | 1 | Set | 4,500 ₹4,500 | 3,599 ₹3,599 | 1,500 ₹1,500 Lowest | 3,000 ₹3,000 | 4,000 ₹4,000 | 4,000 ₹4,000 | 4,400 ₹4,400 | 3,600 ₹3,600 | 3,500 ₹3,500 | 5,789 ₹5,789 | 3,000 ₹3,000 | 4,200 ₹4,200 | 3,400 ₹3,400 | 1,500 ₹1,500 Lowest |
| 9.00 | Supply, Installation,testing & commissioning of 120 mm², Single Phase Cable,1.1K V Grade, XLPE Insulated Stranded Conductor FRLS type | 44 | Mtr | 250 ₹11,000 | 199 ₹8,756 | 190 ₹8,360 | 250 ₹11,000 | 150 ₹6,600 Lowest | 300 ₹13,200 | 650 ₹28,600 | 235 ₹10,340 | 300 ₹13,200 | 490 ₹21,560 | 200 ₹8,800 | 300 ₹13,200 | 300 ₹13,200 | 250 ₹11,000 |
| 10.00 | Providing and fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting | 21 | No | 1 ₹21 Lowest | 50 ₹1,050 | 400 ₹8,400 | 400 ₹8,400 | 500 ₹10,500 | 1,100 ₹23,100 | 350 ₹7,350 | 585 ₹12,285 | 500 ₹10,500 | 790 ₹16,590 | 200 ₹4,200 | 450 ₹9,450 | 500 ₹10,500 | 400 ₹8,400 |
Tender Value
₹12.5 L
EMD Value
₹24,940
Closing Date
29 Jul 2025, 11:00 amClosed
Executive Engineer
Ex Engineer ED Awantipora
Installation of 100 KVA Transformer alongwith HT LT network at Govt. Degree College Awantipora
2025_PDD_281148_1
EDA 11 of 25-26 Dt. 12-7-25
Open Tender
Electrical Works
Turn-key
45 days
Awantipora
Please refer to SBD
2 documents required · 2 mandatory
₹1,000
Yes
Executive Engineer, ED Awantipora
₹24,940
Yes
11 Aug 2025
12 Jul 2025
29 Jul 2025
12 Jul 2025
29 Jul 2025
14 Jul 2025
14 Jul 2025 - 14 Jul 2025
Amount
Supply, Installation,testing & commissioning of 100 kVA,11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, Aluminium wound, and with LV Cable Box having detachable Aluminium Gland plate
Supply, Installation,testing & commissioning of 9 Mtr. Long Pole ( ST-410 SP33)
Supply, Installation,testing & commissioning of ST poles 8m long ST-540 SP -15 with base plate & cap
Supply, Laying,testing, stringing, tensioning and binding of conductor 50 mm² ACSR Conductor (Rabbit)
Supply, Installation,testing & commissioning of LT Distribution Box for 100 kVA DTR with 160 Amp MCCB 3P 16 kA for incomer & 100 Amp MCCB 3P 16 kA 2 No.s for Outgoing Circuits
Supply, Installation,testing & commissioning of 11 kV Gapless Surge Arrestor,9 kV ,10 kA ,LA with polymer housing, Stn. Type
Supply, Installation,testing & commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp, Vertical Type
Supply, Installation,testing & commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply, Installation,testing & commissioning of 120 mm², Single Phase Cable,1.1K V Grade, XLPE Insulated Stranded Conductor FRLS type
Providing and fixing of 11kV Polymeric composite Disc Insulator 12kV,min failing load 45kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm with fitting
Providing and fixing of GI Channel/Angle/Flat of sizes including clamps
Providing and fixing of Galvinized Nuts and Bolts.
Providing and fixing of 11kV Polymeric composite Pin Insulator 12kV, 5kN, Lighting Impulse 75kV Positive and 80kV Negative, creepage distance 320mm
Providing and fixing of Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 25 mm x 3 mm for connection of transformer body,G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber made of brick masonary with RCC slab cover.
Providing and fixing of Wedge Connectors / PG Clamps
Providing and fixing of Danger Plates with Clamps
Providing and fixing of GI Barbed Wire for Anti Climbing
Supply and painting of each Pole 1 coat red oxide paint and 2 coats of aluminium paint (@ 1 ltr/pole red oxide paint and 1 ltr/pole aluminium paint)
Providing and fixing of Spike Earthing Rod 20mm 2,5 Mtr long with GI strip (25x3)mm
Providing, laying of Cement bottoming 1:2:4 mix as per Standards 0.48 cum /pole
Providing, laying of Cement bottoming 1:2:4 mix as per Standards 0.40 cum / pole for ( 8 Mtr ST Pole)
Supply, Installation,testing & commissioning of 120 mm² AB (LT) Cable ( 3 x 120 + 1 x 25 + 1 x 95 insulated) mm² XLPE (1.1kV, 3+1 C, Al)
Providing and fixing of Suspension/Tension Clamp with eye hook
Providing and fixing of Insulating Piercing Connectors
SITC of 11KV Isolator Double Break, 3-pole, 630 Amps, Horizontal Mounting Type , with earth switch
SITC of 3-Ø, 4-Wire Trivector Meter (Prodigy) Suitable with ring type CT 200 Amp
Pre and Post Geo Tagged Photograph
SHARK CONSTRUCTIONS ELECTRICAL MECHANICAL ENGINEERS SUPPLIERS (BID ID -2424694)
M/S SOFI SONS (BID ID -2424676)
M/S HILAL ENTERPRISES (BID ID -2424828)
southern (BID ID -2413369)
mohd yousuf wani (BID ID -2424791)
FAYAZ AHMAD DAR (BID ID -2424345)
GUROO ELECTRICALS (BID ID -2424496)
M/s NEW DAR ELECTRICALS (BID ID -2424623)
M/S KHAN ELECTRICAL ENTERPRISES (BID ID -2424721)
MOHD SHAFI YATOO (BID ID -2420729)
IRSHAD AHMAD LONE (BID ID -2422302)
M/S DAR ELECTRICALS (BID ID -2421982)
M/S SHAKEEL RAJA (BID ID -2424883)
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .