| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹92.8 CrAccepted-AOC | ₹92.8 Cr | L1 | Accepted-AOC This is L1 |
| 2 | L2₹93.0 Cr+₹21.3 L (0.23%)Rejected-Finance 19 PARKDRIVE MALIBU TOWN SECTOR 47 SOHNA ROAD GURGAON HARYANA 122001 | GURGAON | GURGAON | HARYANA | 122001 | ₹93.0 Cr+₹21.3 L (0.23%) | L2 | Rejected-Finance Due to higher Rate quoted |
| 3 | L3₹94.6 Cr+₹1.8 Cr (1.91%)Rejected-Finance | ₹94.6 Cr+₹1.8 Cr (1.91%) | L3 | Rejected-Finance Due to higher Rate quoted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not ELIGIBLE FOR FAINANCIAL BID OPENING |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not ELIGIBLE FOR FAINANCIAL BID OPENING |
| Sl No | Description | Qty | Unit | Gawar Construction Limited L2 | JAI SHAKTI CONSTRUCTION L3 | M/s Chopra Traders L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m -301(3.06) | 46,299 | Cum | 50 ₹23,14,950 Lowest | 55 ₹25,46,445 | 54 ₹25,00,146 |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting (as above item ) and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 11,407 | Cum | 60 ₹6,84,420 Lowest | 62 ₹7,07,234 | 61 ₹6,95,827 |
| 3.00 | Construction of Embankment with Material obtained from Borrowpits by Cartage from 4 km Distance
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 8,450 | Cum | 229 ₹19,35,050 Lowest | 232 ₹19,60,400 | 230 ₹19,43,500 |
| 4.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and spreading, grading to required slope and compacting to meet requirement of table 300-2. | 1,05,881 | Cum | 113 ₹1,19,64,553 Lowest | 115 ₹1,21,76,315 | 114 ₹1,20,70,434 |
| 5.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 809 | Cum | 210 ₹1,69,890 | 209 ₹1,69,081 | 205 ₹1,65,845 Lowest |
| 6.00 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 16,090 | Cum | 118 ₹18,98,620 | 120 ₹19,30,800 | 117 ₹18,82,530 Lowest |
| 7.00 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. (i) For Grading I Material | 25,092 | Cum | 4,800 ₹12,04,41,600 | 4,850 ₹12,16,96,200 | 4,777 ₹11,98,64,484 Lowest |
| 8.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifications including premixing the material with water of OMC in mechanical mix (Pug Mill), carriage of mixed material by tipper to site laying in uniform layers in sub-base/base course on a well prepared under base and compacting with power vibratory-roller to achieve the desired density including lighting, guarding, barricading and maintenance of diversion etc. | 13,959 | Cum | 5,850 ₹8,16,60,150 | 5,950 ₹8,30,56,050 | 5,810 ₹8,11,01,790 Lowest |
| 9.00 | Providing and applying Primer Coat with SS1 Grade Bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 0.70 kg/sqm using mechanical means. | 84,922 | Sqm | 49 ₹41,61,178 | 46 ₹39,06,412 | 45 ₹38,21,490 Lowest |
| 10.00 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,98,839 | Sqm | 18 ₹35,79,102 | 17 ₹33,80,263 | 16 ₹31,81,424 Lowest |
Tender Value
₹95 Cr
EMD Value
₹95 L
Closing Date
6 Mar 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, Bahraich-Shrawasti Circle, P.W.D., Bahraich
Widening and Strengthening of Bahraich Kakardari Road Km. 13.00 to 42.00 in width 7 Meter to 10 Meter under Rajy Yojna Year 2025-26 in District Shravasti. (05 years Maintenance)
2026_CEDPW_1118420_1
731/8 Kam/e_Tendering/BRH-SWT Circle/2025-26 Dated- 19-02-2026
Open Tender
Civil Works - Roads
Item Rate
540 days
Shravasti
Please refer Tender documents.
2 documents required · 2 mandatory
₹12,154
₹95 L
Yes
Bahraich
16 May 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
25 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m -301(3.06) | 46,299 | Cum | - | - |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting (as above item ) and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. | 11,407 | Cum | - | - |
| 3 | Construction of Embankment with Material obtained from Borrowpits by Cartage from 4 km Distance
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. | 8,450 | Cum | - | - |
| 4 | Construction of embankment with approved material obtained from borrow pits with all lifts and spreading, grading to required slope and compacting to meet requirement of table 300-2. | 1,05,881 | Cum | - | - |
| 5 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 809 | Cum | - | - |
| 6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 | 16,090 | Cum | - | - |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader/tractor mounted appropriate equipment on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specificatin Clause 401. (i) For Grading I Material | 25,092 | Cum | - | - |
| 8 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specifications including premixing the material with water of OMC in mechanical mix (Pug Mill), carriage of mixed material by tipper to site laying in uniform layers in sub-base/base course on a well prepared under base and compacting with power vibratory-roller to achieve the desired density including lighting, guarding, barricading and maintenance of diversion etc. | 13,959 | Cum | - | - |
| 9 | Providing and applying Primer Coat with SS1 Grade Bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer @ 0.70 kg/sqm using mechanical means. | 84,922 | Sqm | - | - |
| 10 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 1,98,839 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.94 MB
Addendum_to_Bid_DocumentSBD.pdf
Tender Documents • 0.17 MB
Bid_Document_Part_1SBD.pdf
Tender Documents • 0.47 MB
Bid_Document_Part_2SBD.pdf
Tender Documents • 0.22 MB
BOQ_2078906.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .