Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.5 LAccepted-AOC A 49 10 VINDHYA COLONY PINOURA DISTRICT UMARIA MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹21.5 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹21.8 LRejected-Finance Q NO A 49 10 VINDHYA COLONY PINORA NOWROZABAD MADHYA PRADESH 484555 | UMARIA | MADHYA PRADESH | 484555 | ₹21.8 L | L2 | Rejected-Finance Being L2 |
| 3 | L3₹30.4 LRejected-Finance RAILWAY COLONY PO DHANPURI DISTT SHAHDOL M P 484114 | DHANPURI | SHAHDOL | MADHYA PRADESH | 484114 | ₹30.4 L | L3 | Rejected-Finance Being L3 |
| 4 | Rejected-Technical SHANTI NAGAR BISHRAMPUR DISTT SURAJPUR C G | - | - | Rejected-Technical Work Experience not Submitted as per NIT. |
| Sl No | Description | Qty | Unit | ASHOK KUMAR AGRAWAL L2 | ABADH KISHOR SHARMA L1 | KEDAR SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Loading & transportation of 6" dia GI/MS plpes from surface/ UG on trolley to site of installation,unloading & laying (Length of pipe considered 6.0 Mtr. each). | 2,532 | mtr. | 203 ₹5.1 L | 198 ₹5.0 L | 526 ₹13.3 L |
| 2.00 | Joining of layed 16nos.6" dia GI/MS layed pipes (Length of pipe considered 6.0 Mtr. each). | 2,532 | mtr. | 50 ₹1.3 L | 40 ₹1.0 L | 206 ₹5.2 L |
| 3.00 | Shifting of pump set (Pump,base plate,pipes,valves, motor) and starter switches to be done at work site as per the instruction given by work incharge. On every two pillar length manually. | 56 | no. | 12,188 ₹6.8 L | 12,000 ₹6.7 L | 2,990 ₹1.7 L |
| 4.00 | Unreeling,loading on trolleys and transportation of 250mtr. 50 sq.mm, 3core pvc armored power cable up to place of installation & unloading and hanging in a proper way. | 2,532 | mtr. | 78 ₹2.0 L | 72 ₹1.8 L | 50 ₹1.3 L |
| 5.00 | Providing & fixing M.S. Nut bolt 5/8" x 2" including nuts and washers complete | 5 | Qtl. | 6,266 ₹31,330 | 6,000 ₹30,000 | 10,000 ₹50,000 |
| 6.00 | Providing & fixing M.S. Flange 6" PLN face12mm | 844 | no. | 351 ₹3.0 L | 400 ₹3.4 L | 450 ₹3.8 L |
| 1000000.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Updated dates
Tender Value
₹27.6 L
EMD Value
₹34,600
Closing Date
1 Dec 2025, 5:00 pmClosed
GENERAL MANAGER Oprn.
GM OFFICE SECL BISHRAMPUR AREA.
Shifting of 1000 GPM pump set with electrical motor, starter ,switches, pipes valves ets. unreeling, loading on trolley transportation and unloading and laying,hanging of 50Sq.mm PVC armored power cable, transporting, laying and joing of 6inch pipe
2025_SECL_347036_1
GM/BSPR/GMO/Srvy/e-tender/ 2025-26/12 dt.08.11.25
Open Tender
Civil Works - Others
365 days
GAYATRI UG MINE OF SECL BISHRAMPUR AREA
AS PER NIT.
4 documents required · 4 mandatory
₹34,600
27 Feb 2026
10 Nov 2025
2 Dec 2025
10 Nov 2025
1 Dec 2025
11 Nov 2025
10 Nov 2025 - 19 Nov 2025
Amount
Loading & transportation of 6" dia GI/MS plpes from surface/ UG on trolley to site of installation,unloading & laying (Length of pipe considered 6.0 Mtr. each).
Joining of layed 16nos.6" dia GI/MS layed pipes (Length of pipe considered 6.0 Mtr. each).
Shifting of pump set (Pump,base plate,pipes,valves, motor) and starter switches to be done at work site as per the instruction given by work incharge. On every two pillar length manually.
Unreeling,loading on trolleys and transportation of 250mtr. 50 sq.mm, 3core pvc armored power cable up to place of installation & unloading and hanging in a proper way.
Providing & fixing M.S. Nut bolt 5/8" x 2" including nuts and washers complete
Providing & fixing M.S. Flange 6" PLN face12mm
Total impact of GST for the purpose of CTC
ASHOK KUMAR AGRAWAL (BID ID -1199342)
KEDAR SINGH (BID ID -1200909)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.30 MB
Tendernotice_2.pdf
PDF • 2.12 MB
BOQ_359728.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid