| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC NO 126 SRI BRINDAVAN 1ST MAIN ROAD KODAMBAKKAM CHENNAI 600024 | CHENNAI | CHENNAI | TAMIL NADU | 600024 | ₹10.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.7 LRejected-AOC | ₹10.7 L | L2 | Rejected-AOC L2 |
| 3 | L3₹10.9 LRejected-AOC NO 486 VPK NAGAR PATTABIRAM CHENNAI TAMIL NADU 600072 | CHENNAI | CHENNAI | TAMIL NADU | 600072 | ₹10.9 L | L3 | Rejected-AOC L3 |
| 4 | L4₹10.9 LRejected-AOC 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | ₹10.9 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Mahadevi K L2 | V ANANDHAN L4 | M/s.DRR INFRASTRUCTURES L1 | AJR Construction L3 |
|---|---|---|---|---|---|---|---|
| 1.00Providing Interlocking Paver Block road in Selliyamman Nagar 4th Street at Vellanoor Panchayat | |||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 28.98 | CUM | 129 ₹3,738 | 135 ₹3,912 | 115 ₹3,333 | 131.5 ₹3,811 |
| 3.00 | Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications | 9.66 | CUM | 1,835 ₹17,726 | 1,875 ₹18,113 | 1,650 ₹15,939 | 1,872.2 ₹18,085 |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 9.66 | CUM | 5,417 ₹52,328 | 5,530 ₹53,420 | 5,120 ₹49,459 | 5,527.5 ₹53,396 |
| 5.00 | Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete. | 17.03 | CUM | 6,682 ₹1.1 L | 6,820 ₹1.2 L | 6,620 ₹1.1 L | 6,818.5 ₹1.2 L |
| 6.00 | Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete. | 148.12 | sqm | 134 ₹19,848 | 140 ₹20,737 | 115 ₹17,034 | 136.5 ₹20,218 |
| 7.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 79.45 | CUM | 2,597 ₹2.1 L | 2,650 ₹2.1 L | 2,520 ₹2.0 L | 2,649.5 ₹2.1 L |
| 8.00 | Flooring with paver blocks laid as interlocking blocks inclouding cost and conveyance and other labour charges ( 80MM thick block) | 529.69 | sqm | 903 ₹4.8 L | 925 ₹4.9 L | 910 ₹4.8 L | 921.1 ₹4.9 L |
| 9.00 | Painting in Two Sides Corewall inclouding cost and conveyance and other labour charges | 148.12 | sqm | 80 ₹11,850 | 85 ₹12,590 | 75 ₹11,109 | 81 ₹11,998 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,62,706.68 ₹1.6 L | 1,66,576.14 ₹1.7 L | 1,60,532.1 ₹1.6 L | 1,65,964.86 ₹1.7 L |
Tender Value
₹11 L
EMD Value
₹27,500
Closing Date
4 Mar 2026, 3:00 pmClosed
Block Development Officer
Block Development Office VKM at Ambathur
Providing Interlocking Paver Block road in Selliyamman Nagar 4th Street at Vellanoor Panchayat
2026_RDTN_668815_1
801/2025/A6
Open Tender
Civil Works
90 days
Villivakkam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹27,500
Yes
10 Mar 2026
1 Mar 2026
4 Mar 2026
1 Mar 2026
4 Mar 2026
1 Mar 2026
Providing Interlocking Paver Block road in Selliyamman Nagar 4th Street at Vellanoor Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete.
Collection and supply of M sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete.
Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly including cost conveyance and all labour charges etc. complete.
Supply and Errecting for Centering and shuttering for core wall sides including cost and conveyance and materials of labour charges etc,.complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Flooring with paver blocks laid as interlocking blocks inclouding cost and conveyance and other labour charges ( 80MM thick block)
Painting in Two Sides Corewall inclouding cost and conveyance and other labour charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_803569.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
tenderdocument.pdf
Tender Documents • 0.74 MB
BOQ_803569.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid