| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.5 LAccepted-AOC KENDRA DALURBANDH KENDRA BURDHAN BARDHAMAN BARDHAMAN 713380 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713380 | ₹23.5 L Quoted ₹19.9 L | L1 | Accepted-AOC tcr |
| 2 | L2₹20.4 LRejected-Finance DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | ₹20.4 L | L2 | Rejected-Finance tcr |
| 3 | L3₹20.7 LRejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹20.7 L | L3 | Rejected-Finance tcr |
| Sl No | Description | Qty | Unit | SINHA ENTERPRISES L1 | SABIR CONSTRUCTION L2 | NANDI ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||
| 2.00 | Transportation & installation of complete drive drurn driven drum with gear motor base frame - 12.5MT+discharge unit-2.5MT+tail end-1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix 1 unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-210mtr @106Kg/mtr =22.26MT +4 times Tail end shifting(extension)-4MT= total weight | 50.11 | MT | 26,421 ₹13.2 L | 27,045 ₹13.6 L | 27,430 ₹13.7 L |
| 3.00 | Fitting of tail end and discharge scraper | 3 | Nos | 1,218 ₹3,654 | 1,247 ₹3,741 | 1,265 ₹3,795 |
| 4.00 | Belt laying including transporting of belt, jointing, tensioning, trial run etc | 225 | Mtr | 558 ₹1.3 L | 571 ₹1.3 L | 579 ₹1.3 L |
| 5.00 | Foundation bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =138nos | 138 | Nos | 448 ₹61,824 | 459 ₹63,342 | 465 ₹64,170 |
| 6.00 | Cleaning of coal & unused materials before installation | 1 | Ls | 20,711 ₹20,711 | 21,200 ₹21,200 | 21,502 ₹21,502 |
| 7.00 | Making and fabrication of Load table | 2 | Nos | 14,065.5 ₹28,131 | 14,397 ₹28,794 | 14,603 ₹29,206 |
| 8.00 | Fencing of drive loop take up & tail end | 1 | Ls | 18,274 ₹18,274 | 18,705 ₹18,705 | 18,972 ₹18,972 |
| 9.00 | Making vertical support from roof and floor for hanging 8 the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of | 1 | Ls | 54,461 ₹54,461 | 55,746 ₹55,746 | 56,541 ₹56,541 |
| 10.00 | Making and fabrication of new discharge unit | 1 | Nos | 87,960 ₹87,960 | 90,036 ₹90,036 | 91,320 ₹91,320 |
Tender Value
₹23.5 L
EMD Value
₹29,400
Closing Date
28 Mar 2026, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 1000mm wide x 210mtr long, 90kW, 550V belt conveyor in RVIIA seam from 16ED 31L to 16ED 37L for SHCM at Shyamsundarpur colliery under Bankola Area.
2026_ECL_357053_1
ECL/GM/BA/E TENDER/25-26/EnM/404 Dt 18.03.2026
Open Tender
Electrical and Maintenance Works
60 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹29,400
16 Apr 2026
18 Mar 2026
30 Mar 2026
18 Mar 2026
28 Mar 2026
18 Mar 2026
18 Mar 2026 - 23 Mar 2026
Item Description/ Heading
Transportation & installation of complete drive drurn driven drum with gear motor base frame - 12.5MT+discharge unit-2.5MT+tail end-1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix 1 unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-210mtr @106Kg/mtr =22.26MT +4 times Tail end shifting(extension)-4MT= total weight
Fitting of tail end and discharge scraper
Belt laying including transporting of belt, jointing, tensioning, trial run etc
Foundation bolting for fitting of drive unit, discharge unit, loop take up & tail end etc =138nos
Cleaning of coal & unused materials before installation
Making and fabrication of Load table
Fencing of drive loop take up & tail end
Making vertical support from roof and floor for hanging 8 the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of
Making and fabrication of new discharge unit
Making and fabrication of new tail end structure
Cost of M.S. Nut bolts & washers, 1.5kg/mtr=315kg, load table discharge & bend pulley loop take up-25kg
Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines
Drive base frame, Loop take up base & discharge base cement concrete
Cost of HT Nut and Bolt M24x150mm
Cost of HT Nut and Bolt M24x130mm
Cost of HT Nut and Bolt M20x100mm
Cost of HT Nut and Bolt M20x75mm
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_369923.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.