Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC SFNO 73 UTHUKULI ROAD MANNARAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | L1 | Accepted-AOC ... | |
| 2 | L2₹38.9 L+₹5.8 L (17.6%)Rejected-AOC | L2 | Rejected-AOC ... | |
| 3 | L3₹39.3 L+₹6.2 L (18.7%)Rejected-AOC | L3 | Rejected-AOC ... | |
| 4 | L4₹39.3 L+₹6.2 L (18.7%)Rejected-AOC | L4 | Rejected-AOC ... |
Tender Value
₹41.3 L
EMD Value
₹42,000
Closing Date
28 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASST.COMMSSIONER - 5
61,BASIN BRIDGE ROAD,CHENNAI - 600021
Proposed Construction of storm water drain of size 1200 x 1200 mm at Prakasam Salai (Chainage 0.00 to 120.00m) in Div-56 Unit-13 Zone-5
2026_CoC_705997_1
Z.O.V.C.NO.E2/8064/2026
Open Tender
Civil Works
Works
60 days
ROYAPURAM
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹0
₹42,000
5 Oct 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
28 Sept 2026
19 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of RCC Slab (reinforcement is being co...er Drain - Steel is declared unfit for use (SWD 1) | 28 | CUM | 2,220.9 | ₹62,185.2 |
| 2 | Picking Existing Black Top Surface upto 2 to 5 cm (BRR - 605) | 228 | SQM | 21.86 | ₹4,984.08 |
| 3 | ORDINARY SOIL (SS20B) Earth work excavating ...nd ordinary soil including excavated earth (SS20B) ( BDW-0055) | 303 | CUM | 88.1 | ₹26,694.3 |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two crush...departmental officers.-Mixing by mechanical means (BDDATA-135) | 27 | CUM | 7,255.21 | ₹1,95,890.67 |
| 5 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).BEAM (BDDATA-145) | 801 | SQM | 1,267.76 | ₹10,15,475.76 |
| 6 | Providing and laying in position, standardised con...the Department for the excess usage of materials). (BDDATA-163) | 139 | CUM | 8,015.86 | ₹11,14,204.54 |
| 7 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level (BDDATA-168b) | 13,900 | KGS | 98.7 | ₹13,71,930 |
| 8 | Supplying and filling in foundation, basement,...tion and as directed by the departmental officers.(BDDATA-130) | 154 | CUM | 252.32 | ₹38,857.28 |
| 9 | Supplying of PVC pipes 160mm dia with ISI monogram (working pressure 6kg/cm2) (PWDM-0873) | 30 | R/M | 595 | ₹17,850 |
| 10 | Supplying, laying and jointing PVC pipes (having w...ove ground level. For laying PVC pipes of dia 20mm (BDDATA-678a1) | 36 | R/M | 187.77 | ₹6,759.72 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_848528.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
TenderDocument.pdf
Tender Documents • 1.43 MB
BOQ_848528.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .