| Sl No | Description | Qty | Unit | RDM INFRA L1 | KARUNANITHI L2 |
|---|---|---|---|---|---|
| 1.00 | Picking the existing BT surface 3 to 5 deep removal of picked up stuff to the side beams and using the useful metal to the road hand packing to camber sectioning, leveling, etc., complete and other tools and plants etc., complete as per 702 MORTH standard specification. | 318.8 | M2 | 6,949.84 ₹6,949.84 | 7,332.4 ₹7,332.40 |
| 2.00 | Providing and laying WMM (Wet Mix Mecadam) of 250 mm compacted thickness in two layors of 125 mm thick or else as specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibrating rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORT&H406 | 143.5 | M3 | 4,73,550 ₹4.7 L | 4,74,985 ₹4.7 L |
| 3.00 | Providing and applying of Prime Tack coat using emulsion bitumen at the rate of 7 kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete. | 956.3 | M2 | 77,269.04 ₹77,269.04 | 79,372.9 ₹79,372.90 |
| 4.00 | Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification | 956.3 | M2 | 16,257.1 ₹16,257.10 | 19,126 ₹19,126 |
| 5.00 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5 | 47.9 | M3 | 5,39,833 ₹5.4 L | 5,41,270 ₹5.4 L |
| 6.00 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm 0.17 cum 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28 kgs of VG30/VG40 bitumen for premixing per 10sqm and 4.02kgs of Shredded plastic waste including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 28.7 | M3 | 3,30,279.6 ₹3.3 L | 3,30,624 ₹3.3 L |
| 7.00 | Providing and laying Well Gravel to the specified thick including cost and conveyance of Well gravel from approved quarry and stocking the same at road side to Departmental guage for premeasurement as directed by the Departmental Officers including labour charges for spreading in layers not exceeding 75 mm thick (or) as specified by the departmental officers, levelling, sectioning etc., and all other charges for tools and plants employed for the work and all other incidental charges such as barricading and providing danger lights etc., complete as per standard specification. as per clause 301 & 305 of MORTH | 23 | M3 | 13,501 ₹13,501 | 13,570 ₹13,570 |
Tender Value
₹17.5 L
EMD Value
₹17,500
Closing Date
19 Dec 2025, 3:00 pmClosed
Executive Officer
Thiruppanandal Town Panchayat
Strengthening of BT Road at Pattam new AD Street 1 and Pattam new AD Street 2 in Thiruppanandal Town Panchayat.
2025_DTP_632047_1
580/2025/A1 Pattam New Street
Open Tender
Civil Works - Roads
180 days
Thiruppanandal Town panchayat
please Refer the Tender Notice
2 documents required · 2 mandatory
₹0
₹17,500
29 Jan 2026
15 Dec 2025
19 Dec 2025
15 Dec 2025
19 Dec 2025
15 Dec 2025
15 Dec 2025 - 19 Dec 2025
Picking the existing BT surface 3 to 5 deep removal of picked up stuff to the side beams and using the useful metal to the road hand packing to camber sectioning, leveling, etc., complete and other tools and plants etc., complete as per 702 MORTH standard specification.
Providing and laying WMM (Wet Mix Mecadam) of 250 mm compacted thickness in two layors of 125 mm thick or else as specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layor with motor grader and compaction with vibrating rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary to complete the work as per MORT&H406
Providing and applying of Prime Tack coat using emulsion bitumen at the rate of 7 kg per 10m2 over the WET MIX MECADAM Surface preparatory to another bituminous construction over it etc. complete.
Providing and applying of Tack coat over WMM Surface treated with prime coat using 2.50kg bitiminous emulsion per 10m2 As per 111,112,501,503,&900 MORTH Specification
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm,0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm &below and with 53.20 Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMPsite,heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory/Pneumatic Roller to the required density etc.,including labou for attending to paver at site etc.,including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory/Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc.,complete a sper specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm 0.17 cum 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28 kgs of VG30/VG40 bitumen for premixing per 10sqm and 4.02kgs of Shredded plastic waste including cost and conveyance of all marerials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity,conveying the mix by tipper trucks to paver site spreading the mix to uniform thickness of 40mm with mechanical paver tothe specified grades and cross sections and consolidated by 8-10 tonne Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tippertrucks,paver Finisher /9m paver finisher,Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc.,complete as per specification using CMP as per clause 507 of MORTH Rev-5.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.32 MB
BOQ_756118.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid