Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | QUAL BIDR₹15 LAccepted-AOC | ₹15 L Quoted ₹12.3 L | QUAL BIDR | Accepted-AOC as per proceeding |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-as per proceeding |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | ILMA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Dismantling of Old MS and concrete chimney above the concrete foundation plinth and clean the foundation Bolt (bottom of Chimney) Note : Lifting of Scrap (Concrete guniting and MS) will be in the scope of the contractor. contractor will arrange JCB/Hydra crane/Tractor-Trolley/Tipper etc at its own cost and no extra payment shall be made for this job. | 1 | Lump Sum | 10,78,786 ₹10,78,786 Lowest |
| 2.00 | Fabrication and erection of MS Chimney from the foundation plinth bolt from bottom to the top of chimney with New Ms Plate/ Channel/Angle etc including Ladder and APCD Ducting as per drawing no. SM88-153-2. Size :- > ID at Bottom = 3.60 MTR >ID at Top = 2.75 MTR >Height of Chimney = 40 MTR Note : Contractor will arrange JCB / Hydra crane etc. at its own cost and no extra payment shall be made for this job. | 1 | Per MT | 45,000 ₹45,000 Lowest |
| 3.00 | painting of chimney with 2 coat paint : (a) External Surface (b) Internal Surface | 1 | Lump Sum | 1,05,000 ₹1,05,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
1 Jul 2026, 3:00 pmClosed
GENERAL MANAGER
THE NAKODAR COOP SUGAR MILLS LTD., NAKODAR (JAL.)
FABRICATION OF NEW CHIMNEY AND REPLACEMENT OF OLD CHIMNEY AS PER DRAWING (2026-27)
2026_Coop_170531_1
NKD/NKD/RECONSTRUCTION OF CHIMNEY/08
Open Tender
Miscellaneous Goods
Item Rate
60 days
THE NAKODAR COOP SUGAR MILLS LTD., NAKODAR (JAL.)
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹60,000
18 Aug 2026
19 Jun 2026
2 Jul 2026
19 Jun 2026
1 Jul 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Old MS and concrete chimney above the concrete foundation plinth and clean the foundation Bolt (bottom of Chimney) Note : Lifting of Scrap (Concrete guniting and MS) will be in the scope of the contractor. contractor will arrange JCB/Hydra crane/Tractor-Trolley/Tipper etc at its own cost and no extra payment shall be made for this job. | 1 | Lump Sum | - | - |
| 2 | Fabrication and erection of MS Chimney from the foundation plinth bolt from bottom to the top of chimney with New Ms Plate/ Channel/Angle etc including Ladder and APCD Ducting as per drawing no. SM88-153-2. Size :- > ID at Bottom = 3.60 MTR >ID at Top = 2.75 MTR >Height of Chimney = 40 MTR Note : Contractor will arrange JCB / Hydra crane etc. at its own cost and no extra payment shall be made for this job. | 1 | Per MT | - | - |
| 3 | painting of chimney with 2 coat paint : (a) External Surface (b) Internal Surface | 1 | Lump Sum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.78 MB
BOQ_347173.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].