Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.7 CrAccepted-AOC SRSC TOWER CP 1 105 PART C PHASE II RADHIKA VIHAR MATHURA 281001 | MATHURA | MATHURA | UTTAR PRADESH | 281001 | L1 | Accepted-AOC Preparation Bond for Rs. 316643516.25 Only | |
| 2 | L2₹31.8 Cr+₹70.8 L (2.28%)Rejected-Finance 7C GOVIND NAGAR MATHURA | MATHURA | L2 | Rejected-Finance Rejected due to higher Rates | |
| 3 | L3₹33.9 Cr+₹2.8 Cr (9.08%)Rejected-Finance | L3 | Rejected-Finance Rejected due to higher Rates | |
| 4 | L4₹35.6 Cr+₹4.5 Cr (14.5%)Rejected-Finance | L4 | Rejected-Finance Rejected due to higher Rates | |
| 5 | Rejected-Technical | - | Rejected-Technical Technical Bid Non responsive |
Tender Value
₹48.7 Cr
EMD Value
₹50 L
Closing Date
6 Mar 2024, 12:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Strengthening work of Chhata Shergarh Naujheel Bajna Gomat Road (MDR139) in District. Mathura
2024_CEAGR_907585_1
512/14M-AC/2023-24 dated 31-01-2024
Open Tender
Civil Works
Item Rate
365 days
Mathura
Strengthening work
2 documents required · 2 mandatory
₹2,354
₹50 L
Yes
Agra
25 May 2024
29 Feb 2024
6 Mar 2024
29 Feb 2024
6 Mar 2024
29 Feb 2024
1 Mar 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406. | 10,230 | cum | - | - |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% emulsion in Uniform single layer on sub base/subgrade and compacting with the road roller to achieve th desire density. | 15,800 | cum | - | - |
| - | DENSE GRADED BITUMINOUS MACADAM
Providing and laying Dense Graded Bituminous Macadam with Hot Mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder @ 4.50% by weight of total mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 507 Complete in all respects. | 15,300 | cum | - | - |
| - | Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. | 2,19,800 | sqm | - | - |
| - | Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. | 2,19,800 | sqm | - | - |
| - | Providing and laying Bituminous Concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder VG-40 @ 5.40% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 509 Complete in all respects. | 6,590 | cum | - | - |
| - | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads. transportings to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2. as per MORT&H 3.18 (305) SOR No.20, Ch.No.-20 | 23,400 | cum | - | - |
| - | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 350 | cum | - | - |
| - | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. | 1,050 | cum | - | - |
| - | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. | 7,000 | cum | - | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1565278.xls
BOQ • 0.30 MB
140848908.pdf
Tender Documents • 1.88 MB
140848914.html
Tender Documents • 0.03 MB
SBD_Final2CSNBG_F.pdf
Tender Documents • 2.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .