| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 6 51 SOUTH STREET ATHIYANALLUR KOTHATTAI PO BHUVANAGIRI TK CUDDALORE DIST 608 501 | ATHIYANALLUR | CUDDALORE | TAMIL NADU | 608501 | Admitted-Finance |
Tender Value
₹11.9 L
EMD Value
₹11,900
Closing Date
22 Nov 2023, 3:00 pmClosed
SE Operation Trichy
Superintending Engineer, Operation circle, TANTRANSCO, 110 KV SS Campus, Trichy-01
provision of false flooring using UNITILE Flooring System to accommodate the panels in Thiruvarur 230KV Substation
2023_EB_389182_1
SEOTRYET-ET29-202324
Open Tender
Civil Works - Others
Works
30 days
Thiruvarur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹11,900
Yes
5 Feb 2024
15 Nov 2023
23 Nov 2023
15 Nov 2023
22 Nov 2023
16 Nov 2023
R.C.C 1:1.5:3 using 12 to 20 mm HBG metal including cost of all materials, form work, labour, lead lift and curing etc., complete but excluding cost of steel reinforcement. RCC Pedestal / Wall - With FW
Providing mechanical anchor (WEDGE ANCHOR) of HILTI make or equivalent in the existing roof slab for required depth as per the technical product data including cost of drilling, labour, lead etc complete.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc., complete.
Supply and Installation of UNITILE False Flooring System with a height upto 300 mm with a Load Bearing capacity of 600 mm x 600 mm HPL Panel/Tile - Point Load - 363 Kgs per sq inch. Uniform Distributed Load -1650 Kgs per sqm.
Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos. washer in High Tensile Steel including 15 cm L at bottom and 10 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the Dept. Engineer at site.
Supplying and fixing MS channel wherever required as directed by the Engineer as per standard specifcation-ISMC 100 x 50
Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation including cost of all labour, lead, lift, etc, complete.
Supplying and filling of M sand in foundation and basement with well watering and consolidation as per std.specn. including cost of all labour, lead, lift, etc, complete.
PCC1:2:4 using 20mm metal without formwork for cable duct including cost of all materials lead, lift, etc. Complete.
RCC 1:1.5:3 mix for raft using 12 to 20mm size hard broken stone including cost of all materials, form work, centering and all leads, lifts etc., complete but excluding cost of reinforcement.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For cable duct side walls etc.,
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Plastering with CM 1:5, 12mm thick including cost of all materials lead lift etc complete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. ( excluding cost of steel reinforcement.) For precast cover slab concrete.
Providing MS channels 50x50x6mm inside the control room including cost of all mateiral,labour, lead, lift painting etc., complete.
Dismantling the existing PCC work and removing them away as directed by the department engineer in charges including cost of labour ,lead, lift ,scaffloding charges etc complete.
Dismantling the existing Brick work and removing them away as directed by the depatment engineer in charges including cost of labour ,lead, lift ,scaffloding charges etc complete.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .