| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.8 L+₹1.3 L (53.5%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4.6 L+₹2.1 L (86.1%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Abhinav Enterprises L1 | Gupta Elect and Engg Works L3 | Perfect Power Transformer Associates L2 |
|---|---|---|---|---|---|---|
| 1.00The following works are carried out for Replacement of Gaskets of 40MVA T/F (ALSTOM make Mfg. Year 1998 Sr. No. B-29464) alongwith other associated Works at 132KV Sub Station Biswan, with all Cost of Men, Misc. Consumables, Crane / Hydra, Centrifuging Machine, Normal & Special T&Ps, etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per details below : | ||||||
| 2.00 | Carriage of 20/40 KL empty oil tank for the centrifuging of T/F oil where it is available within distance of 50 Km Approx. including carefully loading empty oil tank at 132KV Substation Neri & unloading at 132KV Biswan. | 1 | Job | 13,000 ₹13,000 Lowest | 25,000 ₹25,000 | 15,000 ₹15,000 |
| 3.00 | Removal of Jumpers of HV & LV side Bushings of the Transformer. The Scope of Work Involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc. | 1 | Job | 3,000 ₹3,000 | 5,000 ₹5,000 | 2,000 ₹2,000 Lowest |
| 4.00 | Complete Draining of the T/F Oil from the 40MVA Transformer (ALSTOM make) into Oil Tanker / Oil Drums and Stacking them at Proper Place. | 22,000 | Lit. | 0.25 ₹5,500 | 0.68 ₹14,960 | 0.1 ₹2,200 Lowest |
| 5.00 | Complete Dismantling of the 40MVA Transformer (TAL make). The Scope of Work Involves Dismantling of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets. | 1 | Job | 18,000 ₹18,000 Lowest | 44,500 ₹44,500 | 45,000 ₹45,000 |
| 6.00 | Complete Replacement of Gaskets of 40MVA Transformer(ALSTOM make). The Scope of Work Involves Removal of old / damaged Rim Gasket of Transformer's Top Cover and old / damaged gaskets of different Parts of the Transformer by Cleaning of Surfaces, Providing & Fabrication of Gaskets out of good Quality Rubberized Cork Sheet Gaskets of Konica / Troborze / Nu-Cork make having Temperature Bearing Capacity around 3800 C and Fixing the Gaskets with Adhesive at Rim & other Surfaces. | 1 | Job | 97,000 ₹97,000 Lowest | 1,50,000 ₹1,50,000 | 1,45,000 ₹1,45,000 |
| 7.00 | Cleaning of Transformer's Core and Winding by Hot Transformer Oil and Removing the Complete Sludge from Bottom by Flushing with Centrifuging Machine. | 1 | Job | 4,100 ₹4,100 | 5,000 ₹5,000 | 2,500 ₹2,500 Lowest |
| 8.00 | Complete Erection of 40MVA Transformer (ALSTOM make) by Erection of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. at its original Place and Complete Evacuation of Main Tank of the Transformer and filling of Dry Nitrogen / Dry Air of Dew Point -50°C or better in Vacuum upto Pressure of 0.25Kg/cm² and the again Evacuating the Transformer Tank after Required Time Interval (approx. 12 Hrs.) using Centrifuging Machine. The Scope of Work Involves Measuring Due Point Values of N2 after every Cycle till the Required Value is Achieved. | 1 | Job | 32,000 ₹32,000 Lowest | 1,00,000 ₹1,00,000 | 75,000 ₹75,000 |
| 9.00 | Centrifuging of Oil filled in Oil Tanker, Un-Interrupted till the desired BDV Value of the Oil is Achieved, Filling of Transformer Oil into Main Tank and Radiators from Oil Tanker, then Centrifuging & Circulation of the Oil in Transformer, Un-Interrupted till the Desired BDV Values of the Oil & IR Values are Achieved including Recording of all the Parameters such as Temperature, Vacuum, Insulation Resistance etc. every 2 Hours. Centrifuging Machine, its Operator, all associated T&Ps etc. shall be Arranged by the Contractor at his Own Cost. | 22,000 | Lit. | 1.7 ₹37,400 Lowest | 2 ₹44,000 | 2 ₹44,000 |
| 10.00 | Overhauling of Diverter Switch & OLTC with mechanism after Draining of Oil from OLTC Chamber, Flushing with Hot T/F Oil in OLTC Chamber and finally, Filling the Fresh Centrifuged Transformer Oil. | 1 | Job | 4,500 ₹4,500 Lowest | 15,000 ₹15,000 | 5,000 ₹5,000 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
25 May 2026, 6:00 pmClosed
SE ETC Shahjahanpur
Electy. Trans. Circle, Shahjahanpur
Work
2026_UPTCL_1110433_3
Short Term E. Tender no. 71ETC(S)/2025-26
Open Tender
Electrical Works
Fixed-rate
60 days
Sitapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No. 0423002100107147 IFSC Code No. PUNB0042300
₹5,000
9 Sept 2026
14 May 2026
26 May 2026
14 May 2026
25 May 2026
14 May 2026
14 May 2026 - 19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | The following works are carried out for Replacement of Gaskets of 40MVA T/F (ALSTOM make Mfg. Year 1998 Sr. No. B-29464) alongwith other associated Works at 132KV Sub Station Biswan, with all Cost of Men, Misc. Consumables, Crane / Hydra, Centrifuging Machine, Normal & Special T&Ps, etc. Required for Satisfactory Completion of the Job, as per Technical Specifications & Direction of the Supervising Engineer, as per details below : | - | - | - | - |
| 2 | Carriage of 20/40 KL empty oil tank for the centrifuging of T/F oil where it is available within distance of 50 Km Approx. including carefully loading empty oil tank at 132KV Substation Neri & unloading at 132KV Biswan. | 1 | Job | - | - |
| 3 | Removal of Jumpers of HV & LV side Bushings of the Transformer. The Scope of Work Involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc. | 1 | Job | - | - |
| 4 | Complete Draining of the T/F Oil from the 40MVA Transformer (ALSTOM make) into Oil Tanker / Oil Drums and Stacking them at Proper Place. | 22,000 | Lit. | - | - |
| 5 | Complete Dismantling of the 40MVA Transformer (TAL make). The Scope of Work Involves Dismantling of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. along with Opening of associated Electrical Connections, Stacking of all the Dismantled Parts at Proper Place in the Switchyard including Proper Blanking of the Open Points before Replacement of Gaskets. | 1 | Job | - | - |
| 6 | Complete Replacement of Gaskets of 40MVA Transformer(ALSTOM make). The Scope of Work Involves Removal of old / damaged Rim Gasket of Transformer's Top Cover and old / damaged gaskets of different Parts of the Transformer by Cleaning of Surfaces, Providing & Fabrication of Gaskets out of good Quality Rubberized Cork Sheet Gaskets of Konica / Troborze / Nu-Cork make having Temperature Bearing Capacity around 3800 C and Fixing the Gaskets with Adhesive at Rim & other Surfaces. | 1 | Job | - | - |
| 7 | Cleaning of Transformer's Core and Winding by Hot Transformer Oil and Removing the Complete Sludge from Bottom by Flushing with Centrifuging Machine. | 1 | Job | - | - |
| 8 | Complete Erection of 40MVA Transformer (ALSTOM make) by Erection of HV / LV / Neutral Bushings, Turrets, Radiators, Conservator Tank, Explosion Vent Pipe, Buchholz Relay, Oil Pipe Lines, Flanges, Valves, Cooling Fans etc. at its original Place and Complete Evacuation of Main Tank of the Transformer and filling of Dry Nitrogen / Dry Air of Dew Point -50°C or better in Vacuum upto Pressure of 0.25Kg/cm² and the again Evacuating the Transformer Tank after Required Time Interval (approx. 12 Hrs.) using Centrifuging Machine. The Scope of Work Involves Measuring Due Point Values of N2 after every Cycle till the Required Value is Achieved. | 1 | Job | - | - |
| 9 | Centrifuging of Oil filled in Oil Tanker, Un-Interrupted till the desired BDV Value of the Oil is Achieved, Filling of Transformer Oil into Main Tank and Radiators from Oil Tanker, then Centrifuging & Circulation of the Oil in Transformer, Un-Interrupted till the Desired BDV Values of the Oil & IR Values are Achieved including Recording of all the Parameters such as Temperature, Vacuum, Insulation Resistance etc. every 2 Hours. Centrifuging Machine, its Operator, all associated T&Ps etc. shall be Arranged by the Contractor at his Own Cost. | 22,000 | Lit. | - | - |
| 10 | Overhauling of Diverter Switch & OLTC with mechanism after Draining of Oil from OLTC Chamber, Flushing with Hot T/F Oil in OLTC Chamber and finally, Filling the Fresh Centrifuged Transformer Oil. | 1 | Job | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_2149690.xls
BOQ • 0.28 MB
report.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .