| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance | -35.69% | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹2.7 L (0.87%)Admitted-Finance | -35.13% | ₹3.1 Cr+₹2.7 L (0.87%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹18.9 L (6.05%)Admitted-Finance | -31.80% | ₹3.3 Cr+₹18.9 L (6.05%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 Cr+₹20.3 L (6.52%)Admitted-Finance | -31.50% | ₹3.3 Cr+₹20.3 L (6.52%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹4.8 Cr
EMD Value
₹9.7 L
Closing Date
19 Feb 2026, 4:00 pmClosed
Executive Engineer RnB Division Beerwah
Office of the Executive Engineer RnB Division Beerwah
Construction of Auditorium Building at GDC Beerwah Phase-I.
2026_PWDJK_301711_1
NIT No.71 of 2025-26
Open Tender
Civil Works
Percentage
730 days
Beerwah
As per NIT
3 documents required · 3 mandatory
₹5,500
Executive Engineer RNB Division Beerwah
₹9.7 L
Superintending Engineer PWD RNB Circle Budgam
1 Apr 2026
29 Jan 2026
20 Feb 2026
29 Jan 2026
19 Feb 2026
30 Jan 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 78.33 | Cum | 256.85 | ₹20,119.06 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. : All kinds of soil : | 2,512.9 | Cum | 187.3 | ₹4,70,666.17 |
| 3 | Providing and laying of stone soling hand packed all inclusive leads, lifts, loading, unloading, head load, ramming/ dressing and carriage of materials from approved sources to site of work complete. | - | Cum | 1,000 | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 9.8 | Cum | 5,202.9 | ₹50,988.42 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 142.51 | Cum | 5,733.6 | ₹8,17,095.34 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 263.99 | Cum | 6,540.45 | ₹17,26,613.4 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 177.3 | Cum | 6,591.25 | ₹11,68,628.63 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 2,010.32 | Cum | 218.4 | ₹4,39,053.89 |
| 9 | Filling in with spilt nallah boulders (75mm to 150mm thick) under floor handpacked & rammed complete as per directions of engineer in charge. | 1,789.7 | Cum | 1,000 | ₹17,89,700 |
| 10 | Filling in with dust under floor of stage complete as per directions of engineer in charge. | 81.67 | Cum | 1,200 | ₹98,004 |
stage.html
html • 0.03 MB
technical_978924.pdf
techsummary_978924.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.12 MB
Tendernotice_2.pdf
PDF • 0.88 MB
BOQ_978924.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .