| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹9.5 LAccepted-AOC | l1 | Accepted-AOC l1 | |
| 2 | l2₹9.5 L+₹78 (<0.01%)Rejected-AOC | l2 | Rejected-AOC l2 | |
| 3 | l3₹9.9 L+₹40,703 (4.28%)Rejected-AOC CONTRACTOR SC 133 A B TYPE COLONY SARNI DISTT BETUL M P 460 447 | BETUL | MADHYA PRADESH | 460447 | l3 | Rejected-AOC l3 | |
| 4 | Rejected-Technical | - | Rejected-Technical ORDER COPIES NOT COMPLIED |
| Sl No | Description | Qty | Unit | INDUSTRIAL PRODUCTS L2 | MOHD. SHAKEEL L1 | ANNAPURNA TRADERS L3 |
|---|---|---|---|---|---|---|
| 1.00WORK PART | ||||||
| 1.01 | Overhauling of the rope drums, lubricating of wire rope applying Cardium compound servo coat C-120/320
Thorough inspection of bearings, greasing of the bearing, checking and tightening of fixing clamps and their replacement if required, replacement of damage nut bolts. Alignment of wire rope. Complete Job as per Engineer-in-charge. | 56 | Jobs | 4,296 ₹2,40,576 Lowest | 4,296 ₹2,40,576 Lowest | 4,500 ₹2,52,000 |
| 1.02 | Inspection, greasing, oil top up & alignment Works of Central drive assembly three stage gear Box One Job includes:
(i) Decoupling of motor & worm shaft.
(ii) Dismantling of Inspection cover.
(iii) Dismantling of all the bearing covers.
(iv) Draining of contaminated oil form the Oil chamber.
(v) Dismantling & Removal of top cover Gear box of central drive Assembly
(vi) Cleaning & Inspection of all the Gears, Gearings and Oil seals.
(vii) Greasing of all bearing and refitting of bearing covers.
(viii) Refitting of top cover of Gear box and Filling the fresh oil up to the required level.
(ix) Alignment of Motor & Worm shaft Re-Coupling and greasing.
(x) Refitting of Inspection cover after Replacement of Rubber gasket. | 28 | Jobs | 6,036 ₹1,69,008 Lowest | 6,036 ₹1,69,008 Lowest | 6,200 ₹1,73,600 |
| 1.03 | Inspection and oil top up work of End gear boxes of rope Drum.
(i) Dismantling of Inspection cover.
(ii) Draining of contaminated oil from the Oil Chamber.
(iii) Inspection of the Gear.
(iv) Filling the fresh oil up to the required level.
(v) Refitting of Inspection cover after replacement of Rubber Gasket. | 56 | Jobs | 3,132 ₹1,75,392 Lowest | 3,132 ₹1,75,392 Lowest | 3,309 ₹1,85,304 |
| 1.04 | Brake Adjustment of the Central drive Unit
One Job involves:
(i) Removal of cover of Brake Assembly.
(ii) Cleaning of the Brake Drum using Fine & medium emery paper.
(iii) Cleaning of the Brake shoes using Petrol only.
(iv) Tightening of the foundation bolts of brake assembly
(v) Adjustment of the Brakes & Trial Retightening of check nut for any slip.
(vi) If required Replacement of Brake shoe liner Byremoval of old liner, drilling holes in new liner and riveting. Readjustment of brakes. (Liner and copper rivets shall be arranged be firm)
(vii) Refitting of cover. | 28 | Jobs | 1,940 ₹54,320 Lowest | 1,940 ₹54,320 Lowest | 2,200 ₹61,600 |
| 1.05 | Assistance in attending various defects during running Maintenance of gear boxes, crane, center drive assembly, Limit Switches, wire ropes etc. during monsoon. Under this scope you will have to sufficient Nos of Labours (semiskilled, skilled and fitter) for any job of maintenance as and when the requirement arises during contract period. | 10 | Jobs | 4,037 ₹40,370 Lowest | 4,038 ₹40,380 | 4,200 ₹42,000 |
| 2.00GANTRY CRANE MAINTENANCE WORKS: | ||||||
| 2.01 | Draining of contaminated oil and filling of fresh oil in the gear box of main hoist of Gantry crane.
The Job includes:
(i) Making platform for safe working.
(ii) Draining of contaminated oil.
(iii) Dismantling of Inspection cover of central gear box, 01 no. and End assembly gear boxes, 02 Nos.
(iv) Decoupling of motor worm shaft.
(v) Inspection of gears, bearings, greasing, filing of the fresh oil and box up of the inspection covers after replacements of their gaskets.
(vi) Alignment of the motor-worm shaft and Re coupling and Greasing.
(vii) Dismantling of Platform. | 2 | Jobs | 11,993 ₹23,986 Lowest | 11,994 ₹23,988 | 12,200 ₹24,400 |
| 2.02 | Draining of contaminated oil and filling of fresh oil in the gear box of Auxiliary hoist of Gantry crane.
The job includes:
(i) Making platform for safe working.
(ii) Dismantling & lifting of top cover.
(iii) Draining of contaminated oil.
(iv) Dismantling of Inspection cover of Gear box
(v) Decoupling of motor drive shaft.
(vi) Inspection of gears, bearings, greasing, filling of the fresh oil and box up of the inspection covers after replacement of their gaskets.
(vii) Alignment of the motor-drive shaft and
Re-coupling and Greasing. Dismantling of Platform. | 2 | Jobs | 7,290 ₹14,580 Lowest | 7,291 ₹14,582 | 7,500 ₹15,000 |
| 2.03 | Checking of the tightness of clamps of wire ropes of Main, Auxiliary hoist and application of Servo coat C 120/140/320 Cardium compound on the entire Wire & Aux. hoist Rope of main and auxiliary hoist after making platform for safe working and removal of platform after completion of work. | 2 | Jobs | 9,661 ₹19,322 Lowest | 9,661 ₹19,322 Lowest | 9,900 ₹19,800 |
Tender Value
₹9.5 L
EMD Value
₹19,100
Closing Date
25 Apr 2025, 3:00 pmClosed
SE P and W
STPS Sarni
Biennial contract for Pre monsoon and During monsoon maintenance works of Dam site hoist assembly and gantry crane at Satpura Dam, Sarni.
2025_MPPGC_407479_1
WT4861
Open Tender
Electrical Works
Fixed-rate
730 days
STPS Sarni
As per NIT
11 documents required · 11 mandatory
₹500
Yes
₹19,100
Yes
16 Oct 2025
28 Mar 2025
29 Apr 2025
28 Mar 2025
25 Apr 2025
28 Mar 2025
Amount
WORK PART
Overhauling of the rope drums, lubricating of wire rope applying Cardium compound servo coat C-120/320 Thorough inspection of bearings, greasing of the bearing, checking and tightening of fixing clamps and their replacement if required, replacement of damage nut bolts. Alignment of wire rope. Complete Job as per Engineer-in-charge.
Inspection, greasing, oil top up & alignment Works of Central drive assembly three stage gear Box One Job includes: (i) Decoupling of motor & worm shaft. (ii) Dismantling of Inspection cover. (iii) Dismantling of all the bearing covers. (iv) Draining of contaminated oil form the Oil chamber. (v) Dismantling & Removal of top cover Gear box of central drive Assembly (vi) Cleaning & Inspection of all the Gears, Gearings and Oil seals. (vii) Greasing of all bearing and refitting of bearing covers. (viii) Refitting of top cover of Gear box and Filling the fresh oil up to the required level. (ix) Alignment of Motor & Worm shaft Re-Coupling and greasing. (x) Refitting of Inspection cover after Replacement of Rubber gasket.
Inspection and oil top up work of End gear boxes of rope Drum. (i) Dismantling of Inspection cover. (ii) Draining of contaminated oil from the Oil Chamber. (iii) Inspection of the Gear. (iv) Filling the fresh oil up to the required level. (v) Refitting of Inspection cover after replacement of Rubber Gasket.
Brake Adjustment of the Central drive Unit One Job involves: (i) Removal of cover of Brake Assembly. (ii) Cleaning of the Brake Drum using Fine & medium emery paper. (iii) Cleaning of the Brake shoes using Petrol only. (iv) Tightening of the foundation bolts of brake assembly (v) Adjustment of the Brakes & Trial Retightening of check nut for any slip. (vi) If required Replacement of Brake shoe liner Byremoval of old liner, drilling holes in new liner and riveting. Readjustment of brakes. (Liner and copper rivets shall be arranged be firm) (vii) Refitting of cover.
Assistance in attending various defects during running Maintenance of gear boxes, crane, center drive assembly, Limit Switches, wire ropes etc. during monsoon. Under this scope you will have to sufficient Nos of Labours (semiskilled, skilled and fitter) for any job of maintenance as and when the requirement arises during contract period.
GANTRY CRANE MAINTENANCE WORKS:
Draining of contaminated oil and filling of fresh oil in the gear box of main hoist of Gantry crane. The Job includes: (i) Making platform for safe working. (ii) Draining of contaminated oil. (iii) Dismantling of Inspection cover of central gear box, 01 no. and End assembly gear boxes, 02 Nos. (iv) Decoupling of motor worm shaft. (v) Inspection of gears, bearings, greasing, filing of the fresh oil and box up of the inspection covers after replacements of their gaskets. (vi) Alignment of the motor-worm shaft and Re coupling and Greasing. (vii) Dismantling of Platform.
Draining of contaminated oil and filling of fresh oil in the gear box of Auxiliary hoist of Gantry crane. The job includes: (i) Making platform for safe working. (ii) Dismantling & lifting of top cover. (iii) Draining of contaminated oil. (iv) Dismantling of Inspection cover of Gear box (v) Decoupling of motor drive shaft. (vi) Inspection of gears, bearings, greasing, filling of the fresh oil and box up of the inspection covers after replacement of their gaskets. (vii) Alignment of the motor-drive shaft and Re-coupling and Greasing. Dismantling of Platform.
Checking of the tightness of clamps of wire ropes of Main, Auxiliary hoist and application of Servo coat C 120/140/320 Cardium compound on the entire Wire & Aux. hoist Rope of main and auxiliary hoist after making platform for safe working and removal of platform after completion of work.
Replacement of wire rope of Spillway gates of Dam site at Satpura Dam, Sarni.
Replacement of wire rope of Spillway gates.
INDUSTRIAL PRODUCTS (BID ID -1237746)
ANNAPURNA TRADERS (BID ID -1243211)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .