| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance PLOT NO 7 SRI RAM NAGAR PERIYAKULAM ROAD THENI | THENI | THENI | TAMIL NADU | Admitted-Finance |
| 2 | Admitted-Finance PUDUKKOTTAI PUDUKKOTTAI | PUDUKKOTTAI | TAMIL NADU | 613301 | Admitted-Finance |
Tender Value
₹48.3 L
EMD Value
₹48,500
Closing Date
15 Oct 2020, 3:00 pmClosed
Project Director
DRDA, 3rd floor, Collectorate, Theni
Strengthening of road from Bodi - Annanagar via ulakkuruty km 4/0-6/4 in Bodinaickanur Block
2020_RDTN_181115_1
DIPR/3344/TENDER/2020
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹48,500
17 Oct 2020
23 Sept 2020
15 Oct 2020
23 Sept 2020
15 Oct 2020
25 Sept 2020
Amount
Strengthening of road from Bodi - Annanagar via ulakkuruty km 4/0-6/4 in Bodinaickanur Block
Clearing and grubbing by cutting, removing and disposing of all materials such as bushes, scrubs, stumps, roots, grass, weeds, top organic soil not exceeding 150mm in thickness rubbish including cutting of trees up to 300mm girth.
Earthwork excavation from borrow pits for filling in all classes of soils such as gravelly soil, hard stiff clay, stiff black cotton soil, hard red earth, shales, murrams, gravel stone earth and earth mixed with 50% fair sized boulders and hard gravelly
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing 75mm consolidated thickness WBM for Top LAYER using 1 cum of Grade III metal of size 63 -11.2MM IRCsize HBG metal (1M3 Grade II HBG = 0.025Cum of 63mm + 0.20Cum of 53mm + 0.725Cum of 45mm + 0.025Cum of 22.4mm + 0.025Cum of 11.2mm) with 0.24 cum of gravel for 10sqm including cost and conveyance of all materials from approved quarries to roadside and stacking of materials to departmental gauge for premeasurements including labour for laying, spreading new metal, hand packing to camber, watering with all leads for good water even if the season is worst drought condition forming edge bunds and consolidation by 8 to 10 tonne power roller and finishing to the total thickness with lines grades and cross sections as specified in the departmental specifications including hire charges for all T&P fuel cost and other running charges for power roller and other tools and plants employed and all other incidental charges etc., complete.
Applying tack coat using 4.00 kgs of 10sqm over the WBM surfaces including cost of bituminous emulsion which will be supplied departmentally at section stores cost of which will be recovered here with including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tack coat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification no 503 MOST..
Providing and laying Premix carpet with seal coat type A for 20MM thickness using 0.18 cum of 13.20mm IRC Machine crushed metal and 0.09 cum of 11.20mm IRC Machine crushed metal with 14.60 kgs of bitumen for premixing 10 sqm of premix carpet and 0.09 cum of 6.70MM IRC Machine crusher metal with 9.80 kgs of bitumen for seal coat type A per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in minihot jkix plant for premix roller for rolling to mix for premix carpet and seal coat separately including labour charges in for spreading the mix for premix carpet including labour charges for spreading seal coat separately over premix carpets etc. including hire charges and fuel charges for mim hot mix plant, bitumnen boiler, power roller and all other tools and plant plants employed etc. complete as per clause 509 of MOST specification.
Collection, Supply & Filling of Red Gravel from approved quarry including stacking charges and all other labour charges etc., complete as per standard specification.(Side Berms)
Provision for HM stone
Provision for KM stone
Sign Board
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.SANNASI CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .