Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.0 LAccepted-AOC FLAT NO 13 MANGALAM CHAMBERS PAUD ROAD KOTHRUD PUNE PUNE MAHARASHTRA 411038 | PUNE | MAHARASHTRA | 411038 | L1 | Accepted-AOC Contractor Provided Additional Discount | |
| 2 | L2₹1.0 Cr+₹29.2 L (41.2%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical 1020 8 ALKAPURI APARTMENT GOKHALE NAGAR SHIVAJINAGAR PUNE CITY PUNE 411005 | PUNE | PUNE | MAHARASHTRA | 411005 | - | Rejected-Technical Similar type of work experience is not as per tender, Similar type of work not less than 30 lakh not, List of staff not attached. |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
5 Oct 2020, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director College of Engineering Pune
College of Engineering Pune
Elevators at Town Planning Section Civil Mechanical Engineering Department Instrumentation and Control and HV Lab EED
2020_DTEDM_610765_1
COEP/PEC/Lift/2020/01(5th Call)
Open Tender
Civil Works - Others
Item Rate
60 days
College of Engineering Pune
As per Tender Document
2 documents required · 2 mandatory
₹13,000
via Payment Gateway
₹1.3 L
Office Of College of Engineering Pune
18 Feb 2021
18 Sept 2020
7 Oct 2020
18 Sept 2020
5 Oct 2020
18 Sept 2020
18 Sept 2020 - 5 Oct 2020
23 Sept 2020
120 days
HV laboratory Engineering Department :
Supplying, Installing, Testing, Commissioning including applying and obtaining approvals, clearances, NOC's from all concerned statutory authorities [which will make the entire system as complete and functional and prove the practical results as per the design guidelines and product specifications to the Clients, Project Architects, Project Architects Sub-Consultants and Construction Management Consultants] with all lead and lifts, all levels: (including SS frame as per design and specifications) but limited to foundation buffers, electrical supply points and distribution and other civil foundations required . The structural safety of the SS frame should be certified by the appropriate agency /person. Passenger Elevator [ PE1 & PE2) ] HV Laboratory and Instrumentation Department Unit Rate (Rs.) (Supply + Installation)
Comprehensive Maintenance Contract after completion of 60 months from the date of successful running of the elevator (handing over date to the Client). Comprehensive means Inclusion of all required materials, parts, systems, consumables, labour etc. complete. (Passenger Elevators (2 no.)
Town Planning Civil And Instrumentation Engineering Department
Supplying, Installing, Testing, Commissioning including applying and obtaining approvals, clearances, NOC's from all concerned statutory authorities [which will make the entire system as complete and functional and prove the practical results as per the design guidelines and product specifications to the Clients, Project Architects, Project Architects Sub-Consultants and Construction Management Consultants] with all lead and lifts, all levels: (including SS frame as per design and specifications) but limited to foundation buffers, electrical supply points and distribution and other civil foundations required . The structural safety of the SS frame should be certified by the appropriate agency /person. Passenger Elevator [ PE3 ] Unit Rate (Rs.) (Supply + Installation)
Comprehensive Maintenance Contract after completion of 60 months from the date of successful running of the elevator (handing over date to the Client). Comprehensive means Inclusion of all required materials, parts, systems, consumables, labour etc. complete. Passenger Elevators (1 no.)
Passenger Elevator [PE4] Mechanical Engineering Dept
Supplying, Installing, Testing, Commissioning including applying and obtaining approvals, clearances, NOC's from all concerned statutory authorities [which will make the entire system as complete and functional and prove the practical results as per the design guidelines and product specifications to the Clients, Project Architects, Project Architects Sub-Consultants and Construction Management Consultants] with all lead and lifts, all levels: (including SS frame as per design and specifications) but limited to foundation buffers, electrical supply points and distribution and other civil foundations required . The structural safety of the SS frame should be certified by the appropriate agency /person. Passenger Elevator [ PE4 ] Unit Rate (Rs.) (Supply + Installation)
Comprehensive Maintenance Contract after completion of 60 months from the date of successful running of the elevator (handing over date to the Client). Comprehensive means Inclusion of all required materials, parts, systems, consumables, labour etc. complete. Passenger Elevators (1no.)
INTELECT ELEMECH COMPANY PVT.LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .