Tender Value
₹95.9 L
EMD Value
₹95,910
Closing Date
18 Aug 2023, 3:00 pmClosed
COMMISSIONER
COMMISSIONER,METTURMUNICIPALITY
providing bt road
2023_MAWS_345214_2
2103/B/E1
Open Tender
Civil Works - Roads
Works
120 days
METTUR MUNICIPALITY
bt road contractor
3 documents required · 3 mandatory
₹0
₹95,910
Yes
METUURMUNICIPALITY
25 Aug 2023
17 Jul 2023
18 Aug 2023
17 Jul 2023
18 Aug 2023
17 Jul 2023
17 Jul 2023 - 18 Aug 2023
19 Jul 2023
Amount
Picking the existing old mettaled surface from 50mm to 100mm thick surface without damaging the exisiting base course and cleaning the site etc, complete
Providing and laying,Spreading and compacting graded stone aggregate to WMM (Wet Mix Mecadam) 250 mm compacted thick in two layers of 125 mm thick or else as specified on the prepared sub base with graded stone aggregate and granular material of quality size and grading pasting in layer with motor grader and compaction with vibrating rollers of 80-100 KN static weight and fine dressing for required grade and cross slope as shown on the drawing equipments equipments safety measures testing and incidents necessary etc.,complete as per standard specification of Clause MORTH 406
Providing and Laying tack coat over primed WMM Surface using 7 Kgs of Bituminous Emulsion per 10M2 area including cost of bituminous binder at the site, including labour charges for pre-paring the surface and applying the required quantity of bituminous binder as tack coat manually etc.,
Providing and laying tack coat of 2.5 kgs/10 sqm over the WMM surface treated with primer using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete.
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 45.27kgs of VG30 bitumen for premixing per 10sqm and 5.03kg shredded plastic waste over the aggregate heated to 170 degree celcious in the central hot mix plant, mixed well with 45.27kgs of hot bitumen(160 degree celcious ) 60/70 grade for premixing per 10 sqm, to lay 30mm compacted thick of Bituminous Concrete including the cost of material ( the cost of municipal plastic waste obtained by the contractor from the municipality will be recovered) and conveyance of all materials to site , cost of heating the aggregate and mixing the shredded plastic with the hot aggregate and heating the bitumen to required temperature and mixing them in required temperature in central hot mix plant 20-30 tonne capacity. conveying the mix ty tipper trucks to paver site , spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne vibratory / Pneumatic roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 CMP with bitumen boiler, tipper trucks , Pavar finisher , Vibratory / Pneumatic roller and all other tools and plant required , including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
R.R.Kanishka & Co.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .