Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.7 LAccepted-AOC PLOT NO NS 320 IRC VILLAGE WARD NO 21 POST NAYAPALLI PS NAYAPALLI BHUBANESWAR DIST KHORDHA PIN 751015 | KHORDHA | ODISHA | 751015 | ₹22.7 L | 1 | Accepted-AOC QUALIFIED IN LOTARY |
| 2 | 1₹22.7 LRejected-AOC | ₹22.7 L | 1 | Rejected-AOC DISQUALIFIED IN LOTARY |
| 3 | 3₹25.3 L+₹2.5 L (11.1%)Rejected-Finance GADIAGUDA DASMANTAPUR KORAPUT | ₹25.3 L+₹2.5 L (11.1%) | 3 | Rejected-Finance DISQUALIFIED |
| 4 | 4₹28.0 L+₹5.3 L (23.3%)Rejected-Finance AT CHHOTAGUDA PODAGUDA PO PODAGUDA DIST KORAPUT | ₹28.0 L+₹5.3 L (23.3%) | 4 | Rejected-Finance DISQUALIFIED |
Tender Value
₹25.3 L
EMD Value
₹25,350
Closing Date
26 May 2026, 5:30 pmClosed
Divisional Officer
RURAL WORKS DIVISION, KORAPUT
Construction of R. W. Section Office-II building at Dasmantapur for the year 2024-25
2026_CERWI_129381_1
SERWKPT ONLINE 01/2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Koraput
2 documents required · 2 mandatory
₹6,000
₹25,350
Yes
Superintending Engineer RWD Koraput
8 Aug 2026
16 May 2026
28 May 2026
16 May 2026
26 May 2026
16 May 2026
16 May 2026 - 26 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in all kinds of soil in excavation of foundation with initial lead & lift including roughdressing and levelling the the beds , cost of all T&P labour etc.complete. | 146.35 | cum | 210.52 | ₹30,808.55 |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance ,royalty of all materials labour, T&P, etc. complete. | 51.03 | cum | 1,967.5 | ₹1,00,406.77 |
| 3 | C.C.( 1:3:6 ) using 40 mm size H.G. metal well rammed with cost, conveyance, royality, taxes of all materials and all labour, T&P, etc. complete. | 39.38 | cum | 6,716.69 | ₹2,64,470.34 |
| 4 | R.R Stone masonary in cement mortar (1:6) using H.G.Stones including cost, conveyance ,royalty of all materials and all labour, T&P, etc. complete. | 35.43 | cum | 5,738.3 | ₹2,03,285.19 |
| 5 | Brick work with C.B. Bricks in C.M. (1:6) in super structure including all cost, conveyance, tax, royalty of all materials and all labour, T&P, etc. complete. | 38.35 | cum | 6,068.45 | ₹2,32,732.34 |
| 6 | RCC work M-30 grade with 20mm and down grade black hard granite CB stone chips including hoisting and laying.(P-50/4) | 0.02 | cum | 0.02 | ₹0 |
| 7 | R.C.C PLINTH BEND / PLINTH BEAM | 3.48 | cum | 8,595.55 | ₹29,932.28 |
| 8 | R.C.C. WORK IN LINTEL | 1.74 | cum | 15,426.34 | ₹26,858.8 |
| 9 | FOUNDATION AND COLUMN BASE | 8.71 | cum | 7,722.06 | ₹67,274.59 |
| 10 | R.C.C. BEAM , T-BEAM & Rect. BEAM | 20.86 | cum | 17,098.33 | ₹3,56,696.81 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.09 MB
Tendernotice_2.pdf
PDF • 1.70 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_591566.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .