Loading…
Loading…
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
31 Jul 2026, 2:00 pm5d left
SW 1): Annual Zonal Contract- At Secunderabad station (service buildings and yard including) and BG Divisional Office complex and James street (Including). SW 2): Annual Zonal Contract - Hyderabad (including) to Begumpet (Including) & Hussain Sagar Jn.(Including). SW 3): Annual Zonal Contract - Electrical Loco Shed / Lallaguda. (For the Period 01.07.2026 to 30.06.2027).
101_CO_SC_26_OT
101_CO_SC_26_OT
Open
Works - General
12 Months
Hyderabad, Telangana
₹0
₹3.4 L
9 Jul 2026
9 Jul 2026
17 Jul 2026
Item Breakup - D-NS items
9.00 5723.00 415 (TMT Bars or HYSD Bars.) upto 12mm dia e t c with all contractors transportation, lead & lift, taxes, stacking at desired location etc as per as directed by the Engineer In charge at site.
25.00 including all contractors labour, transportation, lead & lift, taxes, stacking at desired location etc as per as directed by the Engineer In charge at site.
65.00 contractors labour, transportation, lead & lift, taxes, stacking at desired location etc as per as directed by the Engineer In charge at site.
3000.00 with all contractors transportation, lead and lift, Nos. taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
3000.00 with all contractors transportation, lead and lift, Nos. taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
10.00 300 x 16mm etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 250 x 16mm etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
24.00 etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
24.00 type) 200x10mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
1100.00 with all contractors transportation, lead and lift, Nos. taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
37.00 300x16mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
49.00 250x16mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
210.00 (Barrel type) 300x10mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
230.00 (Barrel type) 150x10mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
230.00 (Barrel type) 100x10mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
260.00 with plate 175x32mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
230.00 with plate 125x32mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
4.00 200x10mm including, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
4.00 175x32mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
1.05 13216.00 m a n u f a c t u r e s , with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
2.10 2124.00 m a n u f a c t u r e s , with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
1.50 transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
62.00 0.50mm etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
10.00 contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
2.50 contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
132.00 (IS:3564-1996), etc of standard make with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
12.70 etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
1.44 with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
44.00 sheet (Mat finish) etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
31.44 all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
31.44 both faces 6mm thick etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
32.00 Kg/Cm2) single socketed pipe 75mm dia etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
230.00 Kg/Cm2) single socketed pipe 110mm dia etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
500.00 etc., with all contractors transportation, lead cudm and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
24.00 basin 630 x 450mm etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
26.00 size 580mm (White) etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 closet (White) etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
32.00 seat in European W.C. Pan etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
215.00 wash basin 32mm dia with length not less than 700mm i/c PVC waste fittings etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
12.00 aluminium angle frame, C.P. Brass brackets and guard rail of standard size etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
96.00 width of aperture 1.4mm and nominal diameter of wire 0.63mm including, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
60.00 50x50mm made of G.I.Wire of dia 4mm, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
24.00 nominal size, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
3.00 1652.00 nominal size, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
10.00 5mm (weight not less than 12.50 Kg/Sqm) including, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
100.00 transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
59.00 with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
236.00 interior grade, having VOC content less than 50grams/Litre, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
15.00 basin, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site
18000.00 cover and suitable locking arrangement, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
300.00 brass union 45cm long 15mm bore, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site. SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
50.00 low level white with fittings and accessories and flush pipe, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
67.00 Corrugated FRP sheet, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
60.00 C.P. brass hinges and rubber buffers etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
95.00 Mirror with Plastic moulded frame etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
130.00 door stopper etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
25.00 contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
15.00 floats : 20mm dia etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
15.00 floats: 15mm dia etc., with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
20.00 (screw end) 25mm dia including, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
13.00 100mm dia including, with all contractors transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
40.00 transportation, lead and lift, taxes, stacking at desired locations etc., as per the direction of Engineer-in-charge at site.
50.00 (Screwed end) 25 mm dia with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site.
44.00 wheel of desired brand/make with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site SECUNDERABAD DIVISION-ENGG/SOUTH CENTRAL RLY
86.00 wheel of desired brand/make with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site
50.00 contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site..
62.00 all contractor's transportation, lead & list, Taxes, stacking at desired location etc as per directed by the Engineer in charge at site.
270.00 flange with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site.
110.00 contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site.
220.00 flange with all contractor's transportation, lead & list, Taxes ,stacking at desired location etc as per directed by the Engineer in charge at site.
130.00 contractor's transportation, lead & list, Taxes, stacking at desired location etc as per directed by the Engineer in charge at site. Total 1507238.72
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Mastertenderbooklet2ason26.03.2026.pdf
ATTACHMENT
Mastertenderbooklet1ason26.03.2026.pdf
ATTACHMENT
special conditions
ATTACHMENT
STCableprotectionconditions.pdf
ATTACHMENT
zonal26-27schedule.pdf
ATTACHMENT
Annexure-1zonal26-27.pdf
ATTACHMENT
MasterDocumentforSpecialConditionsforcontractsforCivil-Buildingworks-Correctedon10.03.2026.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].