| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical CHURU | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
2 Jul 2024, 6:00 pmClosed
Commissioner
Municipal Council Fatehpur
Operation and Maintinance Sewerage Collection Conveyence system phase 1st Fatehpur Shekhawati
2024_DLB_396749_1
NIT/3852-01
Open Tender
Civil Works
Item Rate
120 days
fatehpur shekhawati
please refer tender documents
3 documents required · 3 mandatory
₹1,000
MDRISL
₹99,000
Yes
5 Jul 2024
24 Jun 2024
3 Jul 2024
24 Jun 2024
2 Jul 2024
24 Jun 2024
Amount
Operation & maintenance of sewerage collection & conveyance system (RCC/ HDPE/HDPE DWC pipes) from consumer point to STP complete. (line between property chamber and sewer manhole will not be measured for payment purpose).
Desilting the sewer lines through jetting and suction machines including cleaning, barricading, and reconstruction of manholes for section isolation by plugging and flow stoppage, setting up the overpumping arrangements, traffic management jetting and dislodging of accumulated silt from the pipelines, removal of silt through suction hose, disposal of removed silt upto a distance of 20 Km, necessary temporary repairs of sewers to stop locational collapses, ingress of ground water in the desilted section of the pipelines all complete as per the specifications and direction of Engineer. Evaluation pipeline condition through inline Closed Circuit Television survey to assess the internal condition and material of the buried pipelines including accurate measurement of the length & diameter / cross section, invert levels and other physical attributes of buried pipelines, identification of all defects, joints and connections, measurement and recording of their location / position, sizes, & conditions of such pipelines including provision of survey report and records of the conditions, both through video recording in PAL format on a new VHS cassette as well as a report on the structural condition of the pipelines as per the specifications and direction of Engineer. 200 mm dia sewer
300 mm dia sewer
350 mm dia sewer
450 mm dia sewer
600 mm dia sewer
Raising precast circular manhole cover and frame by taking out existing precast frame and cover, providing and fixing precast SFRC circular spacer of required height, re-fixing existing manhole cover frame and cover with cement sand mortar (1:3), including making good the damage, complete as directed by Engineer.
Supplying & fixing 560mm dia opening SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M-15 complete in all respect as directed by the Engineer. HD-20
Supplying & fixing 560mm opening dia SFRC manhole cover as per IS : 12592-2002 in existing manholes frame complete in all respect as directed by the Engineer. HD-20
Earth work for Sewer line and Manhole in excavation in foundation,trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task.In all types soils/ saturated soil such as moorum, sand, sandy silt,clay, black cotton soil, kankar, etc.Depth upto 1.5 m
Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), rehandling of material/earth to complete the task
Providing and laying in position cement concrete of specified grade over prepared base course complete including finishing, curing, all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20mm nominal size).
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .