| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹11.7 L (3.98%)Admitted-Finance | ₹3.1 Cr+₹11.7 L (3.98%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 Cr+₹29.9 L (10.2%)Admitted-Finance | ₹3.2 Cr+₹29.9 L (10.2%) | L3 | Admitted-Finance |
| 4 | L4₹5.3 Cr+₹2.4 Cr (81.4%)Admitted-Finance | ₹5.3 Cr+₹2.4 Cr (81.4%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical 806 8TH FLOOR MULUND WEST NEPTUNE UPTOWN N S ROAD VILLAGE TOWN MULUND CITY MUMBAI MUMBAI MAHARASHTRA 400080 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | - | - | Rejected-Technical Not Fullfilling PQC |
| Sl No | Description | Qty | Unit | Bidyadhar Swain L3 | Lakshmi Infra Buildcon Pvt Ltd L4 | CHITTA RANJAN SWAIN L2 | LAXMIDHAR ROUT L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Filling the low laying area with saline sand including watering & ramming in layer notexceeding 300mm. Including cost of all materials, labour,T&P, transportation charges, royalties, taxes, etc. all complete as per direction of Engineer-in-charge but excluding GST. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity. | 6,616.81 | Each Cum | 230 ₹15,21,866.3 Lowest | 1,250 ₹82,71,012.5 | 280 ₹18,52,706.8 | 504 ₹33,34,872.24 |
| 2.00 | Filling the foundation and plinth with saline sand at required lacations including watering & ramming in layer not exceeding 300mm. Including cost of all Material ,labour,T&P, transportation charges, royalties, taxes, etc. all complete as per direction of Engineer-in-charge but excluding GST. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity | 199.38 | Each Cum | 230 ₹45,857.4 Lowest | 1,250 ₹2,49,225 | 280 ₹55,826.4 | 504 ₹1,00,487.52 |
| 3.00 | Empty bore of 450 mm dia including supply of rig, tripod & other accessories which are required for boring & ascertained the soil strata up-to 10Mtr. Depth, in every 1.00Mrt. the status of soil should be collected & submitted to the Office with supply of all labour, materials,safety arrangements for labours, T&P taxes excluding GST all complete as per the direction of Engineer-in-charge. | 2 | Each No. | 1,000 ₹2,000 Lowest | 10,000 ₹20,000 | 10,000 ₹20,000 | 12,600 ₹25,200 |
| 4.00 | Providing single under reamed bored compaction pile foundation of 300 mm dia & 6.00 mtr long with reinforced cement concrete of M-20 grade using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. all complete excluding GST and as per direction of Engineer in charge. N.B:-excluding cost of reinforcement & steel work. | 250 | Each No. | 5,700 ₹14,25,000 | 5,000 ₹12,50,000 Lowest | 8,000 ₹20,00,000 | 7,200 ₹18,00,000 |
| 5.00 | Conducting Initial load test as per IS-2911(Part-IV) for testing of pile including Kantiledge of required load & supply of all testing equipments including cost & construction of required length of pile as specifiec in Sl. No. 02 & test pile cap & dismentaling the kantiledge after completion of the test & submitted the test report as per IS-2911(Part-IV) with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge . NB: Applied load is 2.50 times of the design load, i.e 25.00 Tons. | 1 | Each No. | 20,000 ₹20,000 Lowest | 3,00,000 ₹3,00,000 | 50,000 ₹50,000 | 3,06,000 ₹3,06,000 |
| 6.00 | Routine/Cyclic load test for the working piles including kantiledge of required load as per IS-2911(Part-IV) for testing of pile & supply of all testing equipments including cost & constructing of test pile cap & dismentaling the same after completion of the test as specifiec in Sl. No. 02 & test pile cap & dismentaling the same after completion of the test & submitted the test report as per IS-2911(Part-IV) with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge . NB: Applied load is 1.50 times of the design load, i.e 25.00 Tons. | 1 | Each No. | 10,000 ₹10,000 Lowest | 3,00,000 ₹3,00,000 | 42,000 ₹42,000 | 3,06,000 ₹3,06,000 |
| 7.00 | Cutting pile head upto cut off level as specified and disposing the same leading 10.00 mtr away from the work site to dump including supply of all labour , material, taxes tolagge excluding GST etc all complete. | 250 | Each No. | 30 ₹7,500 Lowest | 4,800 ₹12,00,000 | 100 ₹25,000 | 306 ₹76,500 |
| 8.00 | Earth work in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge. | 987.5 | Each Cum | 140 ₹1,38,250 | 250 ₹2,46,875 | 100 ₹98,750 Lowest | 180 ₹1,77,750 |
| 9.00 | Back filling the excavated material in low laying area using the excavated material with all lead & lift with dressing, leveling & compacting the material around the structure, breaking the clods to maximum 5cm to 7cm laying in layer not exceeding 0.30m. with cost of labour, T&P, tollage, taxes,compacting the same all complete as per the direction of Engineer-in-charge but excluding GST. | 658.34 | Each Cum | 75 ₹49,375.5 | 120 ₹79,000.8 | 60 ₹39,500.4 Lowest | 90 ₹59,250.6 |
| 10.00 | P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost
& supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge | 153.6 | Each Cum | 4,300 ₹6,60,480 | 5,500 ₹8,44,800 | 3,500 ₹5,37,600 Lowest | 4,500 ₹6,91,200 |
Tender Value
₹3.5 Cr
EMD Value
₹7.0 L
Closing Date
19 Oct 2022, 5:00 pmClosed
B. Pradhan,EE, HWD-II,PPA
Harbour Works Division -II, Paradip Port Authority Mob-9937311801
Construction of Boundary wall, Rest room, canteen building and 20 seated toilet and bath units along with the new gate around the bulb road at L and T junction near Gate No.1.
2022_MoS_715473_1
CE/HW-II-W-15/22/195
Open Tender
Civil Works
Works
270 days
Paradip
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
As per eTCN and TD.
₹7.0 L
Yes
2 Dec 2022
29 Sept 2022
21 Oct 2022
29 Sept 2022
19 Oct 2022
29 Sept 2022
Amount
Filling the low laying area with saline sand including watering & ramming in layer notexceeding 300mm. Including cost of all materials, labour,T&P, transportation charges, royalties, taxes, etc. all complete as per direction of Engineer-in-charge but excluding GST. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity.
Filling the foundation and plinth with saline sand at required lacations including watering & ramming in layer not exceeding 300mm. Including cost of all Material ,labour,T&P, transportation charges, royalties, taxes, etc. all complete as per direction of Engineer-in-charge but excluding GST. NB: 10.00% voids will be deducted from actual measurment at site to achieve the payabe quantity
Empty bore of 450 mm dia including supply of rig, tripod & other accessories which are required for boring & ascertained the soil strata up-to 10Mtr. Depth, in every 1.00Mrt. the status of soil should be collected & submitted to the Office with supply of all labour, materials,safety arrangements for labours, T&P taxes excluding GST all complete as per the direction of Engineer-in-charge.
Providing single under reamed bored compaction pile foundation of 300 mm dia & 6.00 mtr long with reinforced cement concrete of M-20 grade using 12mm size black hard granite (C.B) stone chips, boring from existing ground level with removal of obstruction if any, using bentonite,providing required reinforcement as per drawing making the end of the cage to Conical shape, welded properly, providing 750mmdia under ream appropriate level and disposal the boring earth from work site with supply of all labour, T&P, taxes, Port enry fees, hire & running charges of all machineries reuqired for the work etc. all complete excluding GST and as per direction of Engineer in charge. N.B:-excluding cost of reinforcement & steel work.
Conducting Initial load test as per IS-2911(Part-IV) for testing of pile including Kantiledge of required load & supply of all testing equipments including cost & construction of required length of pile as specifiec in Sl. No. 02 & test pile cap & dismentaling the kantiledge after completion of the test & submitted the test report as per IS-2911(Part-IV) with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge . NB: Applied load is 2.50 times of the design load, i.e 25.00 Tons.
Routine/Cyclic load test for the working piles including kantiledge of required load as per IS-2911(Part-IV) for testing of pile & supply of all testing equipments including cost & constructing of test pile cap & dismentaling the same after completion of the test as specifiec in Sl. No. 02 & test pile cap & dismentaling the same after completion of the test & submitted the test report as per IS-2911(Part-IV) with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge . NB: Applied load is 1.50 times of the design load, i.e 25.00 Tons.
Cutting pile head upto cut off level as specified and disposing the same leading 10.00 mtr away from the work site to dump including supply of all labour , material, taxes tolagge excluding GST etc all complete.
Earth work in excavation in all kinds of soil with initial lead & lift with dressing, leveling & compacting the foundation bed, breaking the clods to maximum 5cm to 7cm, disposing the material at a designated place and keeping the required quantities for back filling with cost of labour, T&P, tollage,transportation, loading at one end & unloading at other end, all taxes, excluding GST all complete as per the direction of Engineer-in-charge.
Back filling the excavated material in low laying area using the excavated material with all lead & lift with dressing, leveling & compacting the material around the structure, breaking the clods to maximum 5cm to 7cm laying in layer not exceeding 0.30m. with cost of labour, T&P, tollage, taxes,compacting the same all complete as per the direction of Engineer-in-charge but excluding GST.
P.C.C(1:3:6) of using 40mm. & down C.B.G chips of approved quality in foundation & plinth including mixing hosting, laying to proper level & slope compacting, curing, watering charges etc. complete including cost & supply of all materials, labour, T&P, taxes, etc. complete but excluding cost of GST as directed by Engineer-in-charge
C.C. M20 for R.C.C. works using 20mm and 10 mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality, mixing as per approved design mix, hoisting, laying, compacting with 40 to 60 neddle vibrator, curing with cost and supply of all materials, labour, T&P, taxes, tollage, royalties,etc. all complete but Excluding GST as directed by Engineer-in-charge.
For Ground Floor
For First Floor
Supply Tor/TMT steel manufactured by SAIL/TISCON/VIGAC Steel of Fe 500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works including binding the grills with binding wire of 18 to 20 gauge including cost of steel, all labour,materials, transportation charges, T&P, taxes, etc. all completebut excluding GST as per the direction of Engineer-in-charge. NB: No payment shall be made for extra weight than theoretical co-efficient.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank ofapproved quality for R.C.C. structures and deshuttering and removing the same after dueperiod with supply of all materials, labour, T&P, taxes, royalties, tollage, etc. all complete but excluding GST as directed by Engineer-in -charge.
R.C.C. foundation and footing bases of columns mass concrete & pre-cast slab etc.
Super Structure GF - Beam ,column,grider
wall and fins
Lintels
Roof slab ,Landing, projection chajja upto 4.30 mtr height
Super Structure FF - Beam ,column,grider
Lintel
Roof slab ,Landing, projection chajja upto 4.30 mtr height for PART-A and PART-B
wall and fins
Brick work in Fly Ash Bricks having crushing strength not less than 75 Kg/Cm² to99Kg/Cm² with C.M (1:6) including splay/cutting, racking out the joints curing, hoisting,staging at any height with cost and supply of all materials, labour, T&P, royalties,transportation charges, curing, testing, charges taxes excluding GST etc. all complete as per direction ofEngineer-in-charge
foundation and plinth
Ground Floor
First Floor
Cement plaster with following thickness & proportions over brick and concrete surface as reqiured and finished smooth to the exposed surface, rounding the corner at any height & any levels with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Inside plastering 12mm thick with CM(1:6) (Ground Floor)
Inside plastering 12mm thick with CM(1:6) (First Floor)
inside plastering 6mm thick with CM(1:4) (Ground Floor)
First Floor (Inside plastering 6mm thick with CM (1:4)
outside plastering 16mm thick with CM(1:6) (Ground Floor)
outside plastering 16mm thick with CM(1:6) FIRST FLOOR
Providing 25mm thick AS flooring, CC(1:2:4) using CB chips with cement punning including finishing smooth to the exposed surface including, mixing , hoisting, laying, compaction , curing, maintaining proper level & slope, etc complete at any levels with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying fitting fixing of Vitrified floor tiles ( premimum Quality 600 x600 mm size)in floors, treads or steps and landing on 20 mm thick bed of cement mortar 1:4 (1cement: 4sand) jointed with white cement including rubbing and cleaning complete including supplyof all labour material taxes tollage etc all complete but excluding GST as per direction of Engineer in charge.
GORUND FLOOR
FIRST FLOOR
Supplying fitting fixing of 6.5mm to 6.7mm thick ceramic wall tiles ( premimum Quality 200 x300 mm or 200 x200 mm size)as approved by EIC in floors, treads or steps andlanding on 12mm thick bed of cement mortar 1:3(1cement: 3 sand) jointed with neatcement slury mixed with pigment to match the shades of the tiles including rubbing andcleaning complete including supply of all labour material taxes tollage etc all complete butexcluding GST as per direction of Engineer in charge.
GORUND FLOOR
FIRST FLOOR
25mm. (av) thick graded cement concrete in C.C.(1:2:2) using 12mm. to 6mm. size hardgranite chips of approved quality including cleaning the roof top, washing, mixing, hoistinglaying to proper level slope, gradient making rounding hunching at thecorners, joints,finished smooth to exposed surface over 2 coats of sika topseal-107 or equivalent as waterproofing course with cost and supply of all materials, labour, T&P, taxes, tollagetransportations, curing, etc. all complete as per direction of Engineer-in-charge. (New work)
GORUND FLOOR
FIRST FLOOR
Painting two coat with acrylic base plastic emulsion paint with one coat primer of approved quality shade including scraping, cleaning,washing the old paint withscraper filling the holes with plasterof paris preparing the surface sand papering, applying paint uniformly including cost andsupply of all materials, labour, T&P, transportation charges, staging, scaffolding, all taxes but excluding GST etc. complete and as per direction of Engineer-in-charge
Exterior painting two coats to wall surface with acrylic based weathercoat paint with one coat primer of approved quality & shade having resistance to Fungus,Fading, including scraping, cleaning, brushing, washing the old paint,with bio wash, removing the flakes applying uniformly two coatsincluding cost and supply of all materials, labour, T&P,transportation, staging, scaffolding, taxes but excluding GST etc. complete and as directed bythe Engineer-in-charge.
Painting two coats with approved quality & shade enamel paint on new iron work / oldwood work k over one coat of red oxide primer including scraping, cleaning, the old paintsurface sand papering, filling the holes with wax putty etc. all complete including cost andsupply of all materials, labour, T&P, all taxes, transportation charges, staging, scaffolding,etc. as per direction of Engineer-in-charge.
Providing fitting, fixing of Al. door with anodized Al. door section No.9202 as vertical member, 9201 as top member and 9200 as bottom andmiddle member and size of the aluminium section is 125 mm x 37 mm x1.50 mm and 12mm thick pre-laminated board top & bottom Pannel fixed door frame by means of tapered clip No. 4660 and the frame tobe completed by means of jointing angle No. 1855 including providingrubber beading, aluminum U channels, angle, clips, required nos. of handles, tower bolts, hooks, mortise lock & hydraulic door stopper asper relevant I.S. specification, etc. all finished including cost & supply ofall materials, labour, T&P, taxes excluding GST transportation charges, staging,scaffolding, etc. complete and as per direction of Engineer-in-charge.
Supplying, fitting, fixing up AL window (sliding type) made upaluminum Section 9778 as window fram, section No. 4095, 4096 &9777, 3994 as shutter frame with 5mm thick black glass as panel fittedwith rubber bending including locking arrangement including all fitting including cost of materials all taxes labour, T&P etc. complete as perdirection of Engineer-in-charge.
Providing, supplying, fitting, fixing of M.S. grills for windows ofapproved quality & design including fabrication charges, with supply ofall labour, T&P, materials, taxes but excluding GST etc. all complete as per direction of Engineer-in-charge.
Painting and writing of figures and letters in different size upto 120 mm height withSupply of all labour, materials, T&P, taxes excluding GST etc. complete as directed by Engineer in charge
Supply,fabricating,welding of G.I. Pipe different size dia I.S.I.mark with supply of all labour, materials, T&P, gate entry fees, taxes but excluding GST etc. all complete as directed by the Engineer-in-charge.
80mm dia GI Pipe heavy quality
50mm dia GI Pipe heavy quality
50 mm dia medium quality
Supplying,fitting,fixing of welded m.s. Plate of approved thickness 6mm,fixed of position with screws,clamps,nails including drilling of holes in G.I.pipes with cost and supply of all materials, labour, T&P, transportation, port entry fees, welding charges, grinding, staging, scaffolding, curing, taxes but excluding GST etc. all complete as directed by the Engineer-in-charge
Supply of M.S.angle, flat, plate of approved sizes & thickness including cutting, bending, welding, grinding and finishing with making frame, and grill of required sizes with supply of all materials, labour,T&P,conveyance charges, hire & running charges of machineries, scaffolding, Port entry fees including fixing in proper place with finishing, taxes but excluding GST etc. all complete as directed by the Engineer-in-charge. NB:-No wastege materials shall be paid.
1200mm.x1200mm. Stainless Steel Display Board with 5mm. thick Aluminium Composite Panel Sheet finish with writting letters, signage marks & Port emblem with contrast colour by using rectro reflective radium including Stainless Steel 16 Gauge channel border of 2 side vertical stainless steel pipe with top & bottom seal with ball as per drawing including supply, s.s. screws, washer, transportation, erection, tollage, labour charges, royalties, gate entry fees, embedding the vertical posts with cement concrete (1:2:4), earth work in excavation, any incidental expenses required for the work, taxes but excluding GST etc. all complete as directed by the Engineer in-charge.
Supplying, fabricating and fixing of stainless steel square bar using 50mm x50mm dia of 2mm. thick with fabricating required places as per approved design & specification, muffing, polishing, etc. any height at any levels with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .taxes but excluding GST etc. all complete as directed by the Engineer in-charge.
Filling in foundation and plinth with sweet sand including watering and ramming as per didection of Engineer-in-charge.
Providing, laying, spreading and compacting stone aggregates of IRC Gr-II(63 mm to 45 mm) size to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite and to fill up the interstices of coarse aggregate with Quarry dust , watering and compacting to the required density as per clause 404 of MORTH specification for Road & Bridge works with supply of all material labour transporation hire and running charge of equipments, taxes , tollage , royalties etc all complete but excluding GST as directed by EIC
Providing and laying factory made chamfered edged cement concrete paver blocks in footpath, park lawn, drive way or light traffic parking etc. M30 strength and 80 mm thick,made by table vibratory method using PU mould , laid in required colour & parten over 50 mm thick compacted bed of sand , compacting and proper embedding /laying of inter locking paver blocks into the sand bedding layer throught vibratory compaction by using plate vibrator, filling the joints with sand and cutting the paver blocks as per required size and partern, sweeping the surface etc all complete with supply of material, labour , t&P taxes tollage etc all complete but excluding GST as directed by EIC
Supplying ,fitting ,fixing of punched tape concertina coil of diameter 610 mm having 51 turns in one coil and 6.00 mtr length to be stretched manufactered out of 19 mmx0.5 mm thick steel strips and 9 nos horizontal razor barbed Tape(RBT) made of 2.5 mm thick spring steel core wire and weight 80 gms /Rmt with 18 to 25 micron zinc coating over the coil &RBT,both materials having tensile strength of 1620 N/mm2, both are dipped in corrosion preventive fluid , fixing with angle posts section with G I stapples or GI clips /wires to retain horizontal with supply of all material labour T&P taxes stagging etc all complete but excluding GST as directed by EIC
preparing the structural member surfaceby scrapping cleaning thr rusts and spray painting the same with two coats of coaltar epoxy paint over a coat of inorganic zinc silicate primer of approved quality,etc.complete including all staging ,scaffolding upto 4.60mtr,labour,all axes,tollage materials,fuel,brushes tools ,gate entry fees etc complete but excluding GST as directed by the Engineer-incharge.
Making ferrule point excluding fittings etc including cost of all materials, transportation, all taxes etc. all complete excluding GST and as per direction of Engineer-in-Charge
Supplying, fitting and fixing of following Un plasticized C-PVC pipes & fittings of Astral or equivalent ISI make conforming to schedule-80 standard of ASTMD-1785 and fittings of ASTMD-2467 for water supply & Sanitary works at any height & any levels with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
20mm dia Pipe
25mm dia Pipe
15mm dia Pipe
40mm dia Pipe
50mm dia Pipe
15mm dia Socket
20mm dia Socket
25mm dia Socket
40mm dia Socket
50mm dia Socket
20mm x 15mm tee
25mm X 20mm tee
25mm X 15mm tee
40mm x 25mm tee
50mm dia Union
40 mm dia Union
25mm dia Union
20mm dia Union
15mm dia Union
15mm dia Elbow
20mm dia Elbow
25mm dia Elbow
40mm dia Elbow
50mm dia Elbow
15mm x 20mm Elbow
25mm x 20mm Elbow
40mm x 25mm Elbow
50mm x 40mm Elbow
40mm dia Tee
50mm dia Tee
20mm x 15mm Tee
15mm, dia plug
20mmdia plug
25mm dia plug
20mm x 15mm FTA
20mm x 15mm MTA
20mm FTA
20mm MTA
50mm dia GMFWV
40mm dia GMFWV
25mm dia GMFWV
20mm dia GMFWV
15mm dia GMFWV
15mm dia Tee
20mm dia Tee
25mm dia Tee
PH fittings
20mm dia CP concealed stopcock (H/D)
Counter Top Wash Basin 550mm x400 mmin canteen with Half Padestal
15mm dia CP angular stop cock (H/D)
100mm dia CP Grating
150mm dia CP Grating
15mm dia CP long body bibcock
15mm dia CP short body bibcock
15mm dia with CP 600mm long flexible Connection pipe
32mm CP Waste full thread 80mm long
32mm PVC Waste Pipe for basin
CP towel rail 600mm long
Mirror (600mm x 450mm) - 5mm thick, with back board and brass mirror screws
Soap dish holder
CP Extension piece of all size
Mseal plumber
white cement
32mm PVC Waste Pipe for urinal
White glazed earthenware standing Urinal (flat back)
Long flush bend
PVC Pipe & Fittings
150mm PVC Pipe with all fittings
110mm PVC Pipe
75mm PVC Pipe
75mm/100mm PVC plain bend
PVC clamp of all size with nail attached
PVC paste (Each No. 100gm)
CP 15 cm Pillar cock
Conceal stop cock 15 mm dia
110mm PVC door bend
110mm PVC P-Trap
110mm Plain bend
110mm H/R bend
110mm dia offset
75mm PVC door bend
75mm dia S/J with door
75mm dia D/J with door
75mm dia Y Junction
110mm dia socket
110mm dia S/J with door
110mm dia D/J with door
110mm 45° bend
110mm dia Cowl
75mm dia Cowl
Orissa Pan
Low level Cistern 10 ltr Capacity
CP overhead shower 150x150 mm square shape single flow
Neat cement punning over cement plaster using cement @2.20 kg/m2 & curing with cost of labour, materials, T&P, taxes, royalties, curing etc. complete as per the direction of Engineer-in-charge (For all floors).(Excluding GST)
Supplying, fitting & fixing of WPC door and window frames of required size as per requirment with required staging, scaffolding, including all leads & lifts, transportation charges with supply of all labour, T&P, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying fitting and fixing of 32mm thick WPC door/ window shutters including cost of loading & un-loading charges, stacking at departmental stores with supply of all labour, materials like hinges, towe bolt, handle, aldrop etc. T&P, transportation, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying fitting, fixing fully glazed aluminum framed open able windows using15 micron anodized OEL aluminum section 2082 as out section, 9139 as mullion section, 4124 as a shutter section frame with tapered clip of section 4125, aluminum angle , rubber beading, friction stay and handle etc. with 5mm black glass. including locking arrangement including all fitting including cost of materials all taxes excluding GSTlabour, T&P etc. complete as per direction of Engineer-in-charge.
Supplying all materials, labour, T&P for cutting holes through brick & RCC work including good to the same cement mortar(1:4) & leak proof to the damaged portion for taking C-PVC pipes & fittings at any height & any levels with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge
Brick work
RCC Work
Supplying of all materials, labour, T&P including all taxes tollage, royalities & constructing of Manhole Chamber, earth work excavation in all kinds of soil backfilling the same after work done, with CC(1:3:6) using 40mm & down CB metal of approved qty. over the bed of 0.25M thick, KB Brick having crushing strength Not less than 75Kg/Cm² to 99Kg/Cm², RCC cover slab with CC(1:2:4) using 20mm & down CB chips of approved qty. including bending, binding of Tor steel with bindig wire 18 to 20 gauge & centering/shuttering, Cement plastering(1:3) of 12mm thick to outside & inside & neat cement punning to the inside surface wall & flooring as per the approved specification & design . Size(1200 x1200 x 900)mm with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Supplying of all materials, labour, T&P including all taxes tollage, royalities & constructing of Inspection Chember, earth work excavation in all kinds of soil backfilling the same after work done, with CC(1:3:6) using 40mm & down CB metal of approved qty. over the bed of 0.25M thick, KB Brick having crushing strength Not less than 75Kg/Cm² to 99Kg/Cm², RCC cover slab with CC(1:2:4) using 20mm & down CB chips of approved qty. including bending, binding of Tor steel with bindig wire 18 to 20 gauge & centering/shuttering, Cement plastering(1:3) of 12mm thick to outside & inside & neat cement punning to the inside surface wall & flooring as per the approved specification & design . Size(762 x 762 x 457)mm with cost & supply of all materials, labour, PPE of labours, T&P, tollage, royalties, staging, scaffolding, curing, water charges all transportation charges, all taxes excluding GST etc. all complete as directed by the Engineer- in- charge .
Construction of 1.2 mtr. dia x2.55 mtr deep soak-way pit with dry brick walling up to 2.10 mtr. height & brick work with cement mortar(1:6) for balance 0.45 mtr height of wall top plaster (1:3) indise and outside filled with day brick khao of 50 mm to 100 mm size to a height 2 mtr from bottom covered by means of 40 mm thick perforated slab, 50 mmthick R.C.C well cover in Peices fitted with iron strings with all materials, labour, T&P, taxes, transportation charges, staging, scaffoldin but excluding GST etc all complete and as per direction of Engineer-in-charge.
CHITTA RANJAN SWAIN
Bidyadhar Swain
Lakshmi Infra Buildcon Pvt Ltd
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TD_BOUNDARY_WALL.pdf
Tender Documents • 1.32 MB
BOQ_752581.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .