Staff Officer(Mining), Nagpur Area
WCL, Office of Area General Manager, Nagpur Area, Jaripatka, Nagpur 440014
Construction of 95 Nos of RCC Sectionalisation stoppings 22 nos in seam V, 16 Nos in RCC Sectionalisation and 4 Nos RCC preparatory in seam IV M and 53 Nos in IV B at Saoner Mine No1 of Saoner Sub Area of Nagpur Area
2026_WCL_361189_1
min-e-tenderNIC-013/2026-27
Open Tender
Civil Works - Others
540 days
Saoner Mine No.1 of Nagpur Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.3 L
18 Jun 2026
18 Jun 2026
13 Jul 2026
19 Jun 2026
10 Jul 2026
19 Jun 2026
18 Jun 2026 - 3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Job No. 1 (1): Excavation over area (Exceeding 30 CM in depth 1.5 M in width as well as 10 SQM on plan) Including disposal of excavated earth lead upto 50m lift upto 1.5 M disposed soil to be leveled and neatly dressed etc. all complete as per the instruction of Engineer-in-Charge Ordinary rock with or without blasting. | 92.54 | Cum | 1,989.94 | ₹1,84,149.05 | BI01010001010000000000000515BI0100001113 |
| 2 | Job No. 1 (2): Laying reinforced cement concrete 1:2:4 (1 cement:2sand: 4 graded stone aggregate 20 mm nominal size) excluding cost of centering shuttering and reinforcement in foundation footings etc. as per instruction of Engr -in-Charge. | 82.68 | Cum | 7,944.71 | ₹6,56,868.62 | BI01010001010000000000000515BI0100001114 |
| 3 | Job No. 1 (3): Laying reinforced cement concrete 1:2:4 (1cement 2sand 4graded stone aggregate 20mm nominal size) excluding cost of centring shuttering and reinforcement in suspended floors, roofs, landings, shelves and their supports balcolonies, lintels, beams, girders, breassumers, and cantilevers upto floor two level etc., all complete as per the instruction of the Engineer-in-Charge. | 190.16 | Cum | 8,217.56 | ₹15,62,651.21 | BI01010001010000000000000515BI0100001115 |
| 4 | Job No. 1 (4): 12mm thick cement plastering with cement mortar 1:6(1cement:6sand) OR ANY MIX including curing etc complete as per the instructions of Engineer-in-Charge. | 1,202.04 | sqm | 401.41 | ₹4,82,510.88 | BI01010001010000000000000515BI0100001116 |
| 5 | Job No. 1 (5): Centering and shuttering including strutting propring etc. and removal of form work etc., all complete as per the instructiones of the Engr.-in-Charge ) Columns, pillars and piers. | 1,202.04 | sqm | 955.38 | ₹11,48,404.98 | BI01010001010000000000000515BI0100001117 |
| 6 | Job No. 1 (6): Mild or cold twistered or Tor steel reinforcement for R.C.C.or R.B. work inlcuding bending, binding and placing in position etc., all complete as per the instructions of the Engineer-in-Charge. | 4,720.18 | kg | 105.05 | ₹4,95,854.91 | BI01010001010000000000000515BI0100001118 |
| 7 | Job No. 1 (7A): Carriage of cement from Colliery Stores to underground through Coal tub including loading at Pit top from Colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer In-Charge and carriage of unloaded material to a distance of 50 m in underground. | 1,811.93 | Bags | 12.28 | ₹22,250.5 | BI01010001010000000000000515BI0100001119 |
| 8 | Job No. 1 (7B): Carriage of cement from Colliery Stores to underground through Coal tub including loading at Pit top from Colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer In-Charge and carriage of unloaded material to a distance of 50 m in underground. Extra lead of every 50 m x 2 extra leads. Labour for 1 extra lead= Rs 1.80. For 2 Leads = Rs 1.80 x 2 = 3.60 | 1,811.93 | Bags | 3.6 | ₹6,522.95 | BI01010001010000000000000515BI0100001120 |
| 9 | Job No. 1 (8A): Carriage of sand/ballast/boulder etc. from stock yard to underground through Coal tub including loading at Pit top from Colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer In-Charge and carriage of unloaded material to a distance of 50 m in undergroundCarriage of sand/ballast/boulder etc, from stock yard to underground through Coal tub including loading at Pit top from Colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer In-Charge and carriage of unloaded material to a distance of 50 m. in underground. | 375.23 | Cum | 422.63 | ₹1,58,583.45 | BI01010001010000000000000515BI0100001121 |
| 10 | Job No. 1 (8B): Carriage of sand/ballast/boulder etc. from stock yard to underground through Coal tub including loading at Pit top from Colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer In-Charge and carriage of unloaded material to a distance of 50 m in undergroundCarriage of sand/ballast/boulder etc, from stock yard to underground through Coal tub including loading at Pit top from Colliery stores, shunting and accompanying with train to attend derailment including reloading and unloading in underground at place directed by Engineer In-Charge and camage of unloaded material to a distance of 50 m in underground. Extra lead of every 50 mx 2 extra leads Labour for 1 extra lead = Rs92.02 for 2 Leads = RS 92.02 x 2 = 184.04 | 375.23 | cum | 184.04 | ₹69,057.33 | BI01010001010000000000000515BI0100001122 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.23 MB
BOQ_374068.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid