Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.0 LAdmitted-Finance | ₹33.0 L | L1 | Admitted-Finance |
| 2 | L2₹35.7 L+₹2.7 L (8.13%)Admitted-Finance | ₹35.7 L+₹2.7 L (8.13%) | L2 | Admitted-Finance |
| 3 | L3₹37.5 L+₹4.5 L (13.7%)Admitted-Finance | ₹37.5 L+₹4.5 L (13.7%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SU SQUARE PROJECTES & INFRASRUCTURE (P)LTD L2 | Haneefa K L1 | LAIQUE PP L3 |
|---|---|---|---|---|---|---|
| 1.00 | PART A:- Civil Works
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 2 | cum | 6,000 ₹12,000 | 6,700 ₹13,400 | 2,500 ₹5,000 Lowest |
| 2.00Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | ||||||
| 2.10 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 3 | cum | 4,000 ₹12,000 | 4,500 ₹13,500 | 3,000 ₹9,000 Lowest |
| 3.00Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: | ||||||
| 3.10 | Channels, angles, tees and flats | 520 | kg | 75 ₹39,000 | 4.5 ₹2,340 Lowest | 35 ₹18,200 |
| 4.00 | Dismantling with care superstructure of four legged communication tower (upto 40.0 Mtr height) including dismembering Structural sections of the tower viz. angles, flats, channels, gusset plate, base plate, bolts, nuts, ladder, working platform, cable tray, antenna fixtures, lightning arrestor, earth strips, all cables of diameter up to 50mm dia, etc. from tower top to the ground floor etc. and stacking the same within 50 Mtr lead etc., complete as directed by the Engineer - in Charge. (The rate shall be inclusive of cost of providing safety measures, insurance charges and all labour involved in the operation including hire charges and mobilization charges of tools and plants etc. and nothing extra shall be paid on any account.) | 10 | MT | 14,000 ₹1,40,000 Lowest | 15,000 ₹1,50,000 | 18,000 ₹1,80,000 |
| 5.00 | Making template for fixing foundation bolts as per the lay out of foundation bolts using 3Nos of 4mm thick ACP sheet of size up to 600 mmx 600 mm each and making 5 no.s of holes upto 32 mm dia in each plate to suit the36mm dia foundation bolts and interconnecting the plates by MS angles of section 4x400x4 mm with minimum 3 no.s of 8 mm dia bolts on each end and transportation including loading, unloading complete as per the direction of Engineer in charge. | 1 | job | 5,000 ₹5,000 Lowest | 35,000 ₹35,000 | 25,000 ₹25,000 |
| 6.00 | Credit for scrap steel reinforcement obtained from demolition of Reinforced Cement Concrete structural members. | 200 | kg | 10 ₹-2,000 | 22 ₹-4,400 | 5 ₹-1,000 Lowest |
| 7.00Earth work in excavation by manual or mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sam on plan ) including disposal of excavated Earth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed :- | ||||||
| 7.10 | All kinds of soil | 209 | cum | 800 ₹1,67,200 | 300 ₹62,700 Lowest | 800 ₹1,67,200 |
Tender Value
₹36.4 L
EMD Value
₹72,824
Closing Date
27 Aug 2026, 6:00 pmClosed
EE(C),BCD,EKM
4th floor, CTO building, Karakkatt road, Ernakulam
Dismantling 40mtr GBT RP ID 12010 including foundation and re erection of 40mtr GBT including shifting of tower materials construction of foundation painting earthing fencing etc dismantling electrical Infra structure refixing extending p
2026_BSNL_288120_1
15/EE-BSNL/CD/EKM/2026-27
Open Tender
Civil Works - Buildings
Item Rate
120 days
Kalpeni
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AO(Cash),O/o PGMT,EKM
₹72,824
Yes
31 Aug 2026
19 Aug 2026
29 Aug 2026
19 Aug 2026
27 Aug 2026
19 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A:- Civil Works
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 2 | cum | - | - |
| 2Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. | |||||
| 2.1 | Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 3 | cum | - | - |
| 3Dismantling steel work in single sections including dismembering and stacking within 50 metres lead in: | |||||
| 3.1 | Channels, angles, tees and flats | 520 | kg | - | - |
| 4 | Dismantling with care superstructure of four legged communication tower (upto 40.0 Mtr height) including dismembering Structural sections of the tower viz. angles, flats, channels, gusset plate, base plate, bolts, nuts, ladder, working platform, cable tray, antenna fixtures, lightning arrestor, earth strips, all cables of diameter up to 50mm dia, etc. from tower top to the ground floor etc. and stacking the same within 50 Mtr lead etc., complete as directed by the Engineer - in Charge. (The rate shall be inclusive of cost of providing safety measures, insurance charges and all labour involved in the operation including hire charges and mobilization charges of tools and plants etc. and nothing extra shall be paid on any account.) | 10 | MT | - | - |
| 5 | Making template for fixing foundation bolts as per the lay out of foundation bolts using 3Nos of 4mm thick ACP sheet of size up to 600 mmx 600 mm each and making 5 no.s of holes upto 32 mm dia in each plate to suit the36mm dia foundation bolts and interconnecting the plates by MS angles of section 4x400x4 mm with minimum 3 no.s of 8 mm dia bolts on each end and transportation including loading, unloading complete as per the direction of Engineer in charge. | 1 | job | - | - |
| 6 | Credit for scrap steel reinforcement obtained from demolition of Reinforced Cement Concrete structural members. | 200 | kg | - | - |
| 7Earth work in excavation by manual or mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sam on plan ) including disposal of excavated Earth, lead upto 50 m and lift upto 1.5 m, disposed earth to be levelled and neatly dressed :- | |||||
| 7.1 | All kinds of soil | 209 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
NIT15GBTkalpeni.pdf
Tender Documents • 1.30 MB
BOQ_336104.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .