| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.2 L+₹8,666.40 (2.09%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K.G.P. ENTERPRISES L1 | C Maria Cross L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for laying of Water pipe line including cost of all materials, labour, lead, lift etc., complete | 57 | m3 | 86 ₹4,902 Lowest | 88 ₹5,016 |
| 2.00 | Refilling with excavated sand complying with standard specication for filling including cost of all materials, labour, lead, lift, etc, complete | 56.7 | m3 | 42 ₹2,381.4 Lowest | 44 ₹2,494.8 |
| 3.00 | Brickwork in CM 1:5 using fly ash bricks of size 230X110x75 including cost of all materials, labour, lead, lift scaffolding charges, curing etc., complete and as directed by the engineer at site. | 13.5 | m3 | 6,800 ₹91,800 Lowest | 7,000 ₹94,500 |
| 4.00 | Supplying, fabricating and placing in position steel reinforcement, binding wire, labour, lead, lift etc, complete | 260 | Kgs | 98 ₹25,480 Lowest | 100 ₹26,000 |
| 5.00 | Providing RCC 1:2:4 using O.P Cement using 12 to 20mm HBG metal including shuttering for sides, curing, cost of all materials, lead, lift, labour charges, etc, complete | 1.5 | m3 | 12,300 ₹18,450 Lowest | 12,500 ₹18,750 |
| 6.00 | Plastering with CM 1:5-12mm thick for wall both faces including cost of all materials, lead, lift etc, complete | 143 | m2 | 310 ₹44,330 Lowest | 315 ₹45,045 |
| 7.00 | Laying 40mm dia UPVC pipe (Un-Plastering Polyvinyl Chloride) with necessary specials and fitting for water supply including cost of all materials, labour, lead, lift etc, complete | 315 | Rm | 515 ₹1,62,225 Lowest | 520 ₹1,63,800 |
| 8.00 | Fixing of UPVC Ball valve of ISI make 40mm dia as approved by the Engineer at site including cost of all materials, T&P’s labour charges for fixing etc., all leads and lifts etc, complete | 3 | No | 1,400 ₹4,200 Lowest | 1,500 ₹4,500 |
| 9.00 | Providing 1000 litres capacity Priming Tank made up of PVC make Sintex Equivalent including cost of all materials, T&P’s labour charges for fixing etc., all leads and lifts etc., complete | 1 | No | 18,200 ₹18,200 Lowest | 18,500 ₹18,500 |
| 10.00 | Colour washing with two coats using white cement & colour cement over a primer coat including cost of all materials, labour, lead, lift etc., complete | 143 | m2 | 209 ₹29,887 Lowest | 212 ₹30,316 |
Tender Value
Refer Docs
EMD Value
₹3,700
Closing Date
23 Jul 2025, 2:00 pmClosed
SE CM NCTPS II
Office of CE NCTPS II chennai 120
NCTPS II Civil Maintenance Circle Civil Project Division Providing Main Water line from Q11 block opposite to newly constructed 600KLD Sewage treatment plant at Vallur Camp and raising the existing outer compound wall in the rear side of STP
2025_EB_580200_1
CE/NCTPS-II/SE/CM/12/2025-26
Open Tender
Civil Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,700
Yes
11 Nov 2025
10 Jul 2025
24 Jul 2025
10 Jul 2025
23 Jul 2025
10 Jul 2025
Amount
Earth work excavation for laying of Water pipe line including cost of all materials, labour, lead, lift etc., complete
Refilling with excavated sand complying with standard specication for filling including cost of all materials, labour, lead, lift, etc, complete
Brickwork in CM 1:5 using fly ash bricks of size 230X110x75 including cost of all materials, labour, lead, lift scaffolding charges, curing etc., complete and as directed by the engineer at site.
Supplying, fabricating and placing in position steel reinforcement, binding wire, labour, lead, lift etc, complete
Providing RCC 1:2:4 using O.P Cement using 12 to 20mm HBG metal including shuttering for sides, curing, cost of all materials, lead, lift, labour charges, etc, complete
Plastering with CM 1:5-12mm thick for wall both faces including cost of all materials, lead, lift etc, complete
Laying 40mm dia UPVC pipe (Un-Plastering Polyvinyl Chloride) with necessary specials and fitting for water supply including cost of all materials, labour, lead, lift etc, complete
Fixing of UPVC Ball valve of ISI make 40mm dia as approved by the Engineer at site including cost of all materials, T&P’s labour charges for fixing etc., all leads and lifts etc, complete
Providing 1000 litres capacity Priming Tank made up of PVC make Sintex Equivalent including cost of all materials, T&P’s labour charges for fixing etc., all leads and lifts etc., complete
Colour washing with two coats using white cement & colour cement over a primer coat including cost of all materials, labour, lead, lift etc., complete
Supplying and fixing GI Binding wire 10 Gauge-Two ply and four pronged (Galvanised) of approved quality to stiffen the fencing by running it through the compound wall Y post links alternatively, including the cost of all materials, lead, lift, labour charges etc., complete
C Maria Cross (BID ID -1407496)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .